Tender Value
₹8.6 L
EMD Value
₹10,800
Closing Date
14 Mar 2024, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Repairing, rewinding and Installation of 33kv 3.3kv, 3.15MVA, Power ware make power transformer Sl. No. 755544 of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area
2024_ECL_303690_1
ECL/GM/BA/E TENDER/23-24/EnM/372 Dt. 04.03.2024
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹10,800
9 Apr 2024
4 Mar 2024
15 Mar 2024
4 Mar 2024
14 Mar 2024
4 Mar 2024
4 Mar 2024 - 8 Mar 2024
Amount
Item Description/ Heading
Dismantling of core & winding from the transformer tank & cleaning of all parts of the transformer properly.
Cost of copper conductor, HV and LV winding shall be wound from super enamel covered /Double paper covered electrolyte copper conductor.
Insulation of conductor for primary coils (new copper strips 774kg) & secondary coils (existing old copper strips 516 Kg) by double coated manila paper.
De-hydration & filtration of transformer oil to improve Di-electric strength upto 60kv BDV
Cost of brazing with supply of rupaton rod, oxygen, D.A. for brazing of all the primary & secondary coils.
Cost of insulating materials, varnishing, pre-compress paper board, oil duct, cotton tape, webbing tape etc.
Reformation of coil primary and secondary
Fitting core channel, primary & secondary coils & winding into the transformer tank.
Providing neoprene gasket for all the joints of each parts such as top cover, inspection cover, insulators cooling fins etc.
Painting the outer body of the transformer by one coat of primer and two coats of metallic paints including supply of missing bolts, nuts.
Assembling and Installation of 3.15MVA , 33KV/3.3KV power transformer at site which included placement of transformer pre commissioning , testing and energizing. Details of pre commissioning test including TC 1) Insulation Resistance test. 2) High Voltage pressure test. 3) Vector Group test. 4) Magnetic Balance test. 5) Voltage Ratio on all tap position. 6) Di-electric test of transformer oil. 7) Transformer oil acidity test.
Transporting cost
Lifting and placing charges in foundation constructed at yard by 20 Tonne crane.
Total impact of GST for the purpose of CTC
ELECTRO TRADING CO.
JUBILEE ELECTROMECH WORKS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .