Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
14 Sept 2026, 1:00 pm
Superintending Engineer
Office of The Superintending Engineer, Irrigation Construction Circle, Betwa Bhawan, Station Road, Civil Lines, Jhansi
CC lining work on the Bandai Main Canal between km 0.000 and 0.500, km 6.200 and 7.600, and km 9.200 and 9.400
2026_UPIDC_1179087_1
04/SE/2026-27
Open Tender
Civil Works
Item Rate
270 days
Lalitpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,840
₹2.5 L
24 Aug 2026
24 Aug 2026
14 Sept 2026
24 Aug 2026
14 Sept 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in mar kabar and kankar mixed soil in excavation of foundation including lead 100m and lift upto 2.00m with dressing and making profile and manual compaction I/C cost of labour and T & P. | 442.29 | Cum | - | - |
| 2 | Earth work in filling for making proper section for lining work with MKR and Kanker mixed soil including dressing, manual compaction with all lead and lift labour and T&P. | 3,872.4 | Cum | - | - |
| 3 | Preparation of subgrade for C.C. lining work including leveling dressing and compaction with watering complete. | 15,435 | Sqm | - | - |
| 4 | Centering/Shuttering for C.C. work in sleeper and lining including labour material and T&P. | 4,677.53 | Sqm | - | - |
| 5 | Laying C.C. 1:2:4 in sleeper with cement ,sand and stone grit of 10-20 mm including mechanical mixing,vibration and curing with all cost of labour material and T&P. | 442.29 | Cum | - | - |
| 6 | Supplying and laying two coat bitumen sealing compound on top of sleeper including cost of labour material and T&P. | 2,948.62 | Sqm | - | - |
| 7 | Supplying & laying 200 micron LDPE film black polythene sheet below C.C. lining with all cost of labour material and T&P.(10% wastage and overlapping). | 13,982.1 | Sqm | - | - |
| 8 | Laying C.C. 1:2:4 in lining with cement ,sand and stone grit of 10-20 mm including mechanical mixing,vibration and curing with all cost of labour material and T&P. | 800.46 | Cum | - | - |
| 9 | Filling 15x35 mm. joint of C.C. lining with bitumen sealing compound including cost of labour material and T&P. | 4,243.11 | R.M. | - | - |
| 10 | Dewatering of ground water by diesel pump with carriage and shifting of pump at site including proper disposal of water with all cost of diesel, labour and T&P etc. required for completion of work. | 600 | Hrs | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
Tenderdoc01.pdf
Tender Documents • 3.98 MB
BOQ_2216648.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].