Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance RAMANATHAPURAM | RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹56,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev) DRDA, Ramanathapuram
District Rural Development Agency, Ramanathapuram
Rejuvenation of Water Bodies in Package No.BOG-1/AGAMT-II 2021-22 of Bogalur Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242114_1
R7/5593/2021/dated 05.07.2022 BGL-1
Open Tender
Civil Works
Item Rate
180 days
RDDA
Refer Tender Document
6 documents required · 6 mandatory
₹0
₹56,000
District Rural Development Agency, Ramanathapuram
9 Sept 2022
16 Jul 2022
8 Aug 2022
16 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
Amount
Part I :Strengthening of the Road from Athanakuruchi to meet Paramakudi-Keeranthai road to(via) Athanakuruchi Vadakku Kudiyiruppu road Km0/0-1/922
Part I :Deepening of West oorani with Construction of Retaining wall(40m),bhathing Ghat and inlet at Manjakollai Habitation in Manjakollai panchayat.
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
BHATHING GHAT
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
INLET
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and Cost of 750mm dia Hume Pipe including Coppar and All Charges etc complete
Part II: Construction of Retaining wall(28m),bhathing Ghat and inlet at Kuthukal Oorani in Ettivayal Habitation in Ettivayal Panchayat
RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
BHATHING GHAT
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
INLET
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and Cost of 750mm dia Hume Pipe including Coppar and All Charges etc complete
Part III: Construction of at bhathing Ghat and inlet at Alliudaippu oorani in Anaikudi Habitation in Ettivayal Panchayat
BHATHING GHAT
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
INLET
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and Cost of 750mm dia Hume Pipe including Coppar and All Charges etc complete
Part IV: Construction of at bhathing Ghat and inlet at Inniseri West Oorani in Inniseri Habitation in Ettivayal Panchayat,
BHATHING GHAT
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
INLET
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and Cost of 750mm dia Hume Pipe including Coppar and All Charges etc complete
Part V:Deepening of Thambadiya Amman Kovil oorani with Construction of Retaining wall(41m),bhathing Ghat and inlet at Ariyakudi Habitation in Ariyakudi panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
RETAINING WALL
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
BHATHING GHAT
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Part VI:Deepening of Ayyanarkovil oorani with Construction of bhathing Ghat and inlet at Ariyakudi Habitation in A.Puthur panchayat,
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
BHATHING GHAT
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
INLET
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and Cost of 750mm dia Hume Pipe including Coppar and All Charges etc complete
Part VII:Deepening of North Pudhu oorani with Construction of bhathing Ghat and inlet at Mennanthi Habitation in Mennanthi Nagachi panchayat,
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
BHATHING GHAT
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
INLET
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and Cost of 750mm dia Hume Pipe including Coppar and All Charges etc complete
Part VIII:Deepening of Vaduga Amman kovil oorani with Construction of bhathing Ghat and inlet at Mennanthi Habitation in Mennanthi Nagachi panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
BHATHING GHAT
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
INLET
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and Cost of 750mm dia Hume Pipe including Coppar and All Charges etc complete
Part IX:Deepening of Odaikarai oorani with Construction of bhathing Ghat and inlet at Karuthanenthal Habitation in Karuthanenthal panchayat
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
BHATHING GHAT
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
INLET
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and Cost of 750mm dia Hume Pipe including Coppar and All Charges etc complete
Part X:Deepening of Pillaiyarkovil oorani with Construction of bhathing Ghat and inlet at Karuthanenthal Habitation in Karuthanenthal panchayat.
Clearing the Scrub juncle in water spread area
Clearing the Light juncle along the tank bund
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods,sectioning etc., complete (base
BHATHING GHAT
Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel etc., completed for foundation as SS 20B.
Filling with clear river sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site etc complete.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
THIRUMURUGAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .