Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 CrAccepted-AOC | ₹2.2 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹2.2 Cr+₹5.6 L (2.56%)Rejected-Finance IGL COLONY CWS JAYANT P O JAYANT DIST SINGRAULI MP | JAYANT | SINGRAULI | MADHYA PRADESH | ₹2.2 Cr+₹5.6 L (2.56%) | 2 | Rejected-Finance RATE HIGH |
| 3 | 3₹2.3 Cr+₹11.1 L (5.09%)Rejected-Finance | ₹2.3 Cr+₹11.1 L (5.09%) | 3 | Rejected-Finance RTAE HIGH |
| 4 | 4₹2.4 Cr+₹20.5 L (9.36%)Rejected-Finance | ₹2.4 Cr+₹20.5 L (9.36%) | 4 | Rejected-Finance RATE HIGH |
Tender Value
₹2.4 Cr
EMD Value
₹2.4 L
Closing Date
24 Feb 2023, 5:30 pmClosed
PHED BHIND
EE PHED BHIND
Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village 1 MEHDOLI 2 SILOLI GORMI 3 GULIAPURA Block MEHGAON Distt. BHIND based on Tube.Well including installation of electric su
2023_PHED_250551_1
NIT No 100/ Procell/EE/ PHED/2023/BHIND
Open Tender
Civil Works - Water Works
Percentage
270 days
MEHGAON
AS PER NIT
8 documents required · 8 mandatory
₹15,000
₹2.4 L
12 Aug 2023
9 Feb 2023
27 Feb 2023
9 Feb 2023
24 Feb 2023
9 Feb 2023
eProcurement System Government of Madhya Pradesh Created By: Ramkumar Singh Rajpoot Created Date/Time: 18-Mar-2023 11:18 AM Tender Title: PIPE LINE WORK Tender ID: 2023_PHED_250551_1
Tender Inviting Authority: EE PHED BHIND
Name of Work: Survey, Investigation, Design and Construction of Piped Water Supply Scheme under Jal Jeevan Mission in Village – 1 MEHDOLI 2 SILOLI GORMI 3 GULIAPURA Block – MEHGAON Distt. BHIND based on Tube.Well including installation of electric submersible motor pump, construction of R.C.C Sump well cum pump house, construction of R.C.C. Over Head Tenk, laying & jointing of rising main and distribution pipe line system, household tap connections, and electric power connections including cost of material & labour with 90 Days Trial Run After Completion of work And Commissioning of scheme.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SHREE SKA INFRATECH(GSTN-23BRGPB3072B1ZK) 24021000.00 -4.36 22973684.40 Two Crore Twenty Nine Lakh Seventy Three Thousand Six Hundred and Eighty Four
2.00 SANJEEV KUMAR MISHRA(GSTN-NA) 24021000.00 -8.99 21861512.10 Two Crore Eighteen Lakh Sixty One Thousand Five Hundred and Tweleve
3.00 SHUKLA CONSTRUCTION(GSTN-NA) 24021000.00 -6.66 22421201.40 Two Crore Twenty Four Lakh Twenty One Thousand Two Hundred and One
4.00 KESHAV KRUPA CONSTRUCTION PVT LTD.(GSTN-NA) 24021000.00 -.47 23908101.30 Two Crore Thirty Nine Lakh Eight Thousand One Hundred and One
Lowest Amount Quoted BY: SANJEEV KUMAR MISHRA(21861512.10)
BOQ Summary Details Tender Title: PIPE LINE WORK Tender ID: 2023_PHED_250551_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SANJEEV KUMAR MISHRA 21861512.10 L1
2 SHUKLA CONSTRUCTION 22421201.40 L2
3 SHREE SKA INFRATECH 22973684.40 L3
4 KESHAV KRUPA CONSTRUCTION PVT LTD. 23908101.30 L4
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .