| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | ₹1.1 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹1.2 LRejected-Finance | ₹1.2 L | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | A. RENGARAJAN L2 | R RAJENDRAN L1 |
|---|---|---|---|---|---|
| 1.00Repairs to Kitchen Shed @ Arayapatti Govt. Hr Sec., School in Arayapatti Panchayat | |||||
| 2.00 | Chipping of concrete and roughening the surface and cleaned away from the site including cost of all labour charges etc., complete | 50.86 | Sqm | 45 ₹2,288.70 | 43 ₹2,186.98 |
| 3.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 35.4 | Sqm | 1,340 ₹47,436 | 1,336.5 ₹47,312.10 |
| 4.00 | White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed. | 49.13 | Sqm | 40 ₹1,965.20 | 39.3 ₹1,930.81 |
| 5.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification | 140.17 | Sqm | 155 ₹21,726.35 | 150.4 ₹21,081.57 |
| 6.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 77.22 | Sqm | 277 ₹21,389.94 | 267.4 ₹20,648.63 |
| 7.00 | Painting old iron work with two finishing coats of synthetic enamel ready mixed paint including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 16.92 | Sqm | 160 ₹2,707.20 | 159.2 ₹2,693.66 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 1 & 7 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | Nos | 17,552.41 ₹17,552.41 | 17,253.68 ₹17,253.68 |
Tender Value
₹1.3 L
EMD Value
₹1,250
Closing Date
17 Feb 2026, 3:00 pmClosed
Bdo,Thiruvarankulam
Pt.union Office,Thiruvarankulam
Repairs to Kitchen Shed at Arayapatti Govt. Hr., Sec School in Arayapatti Panchayat
2026_RDTN_654734_1
Tvk/BMS/Work--21
Open Tender
Civil Works
Thiruvarankulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1,250
26 Mar 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
Repairs to Kitchen Shed @ Arayapatti Govt. Hr Sec., School in Arayapatti Panchayat
Chipping of concrete and roughening the surface and cleaned away from the site including cost of all labour charges etc., complete
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting old iron work with two finishing coats of synthetic enamel ready mixed paint including cost and conveyance of all materials to site including all labour charges for filling etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 7 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_785049.xls
BOQ • 0.45 MB
Tvk_doc--21.pdf
Tender Documents • 0.26 MB
Download all tender documents and submit your bid