Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 LAccepted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹1.8 L+₹17,600 (11.1%)Accepted-Finance BHAGWATI NAGAR JAMMU | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹1.8 L+₹20,100 (12.7%)Accepted-Finance NOT AVAILABLE | 3 | Accepted-Finance Found Eligible | |
| 4 | 4₹1.8 L+₹24,100 (15.2%)Accepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | 4 | Accepted-Finance Found Eligible |
Tender Value
₹1.8 L
EMD Value
₹3,600
Closing Date
16 Jun 2025, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of Executive Engineer MID Akhnoor/Nowshera
Repair to 100 HP 3 phase induction motor at LIS Kotgarhi H/L, 90 HP 3 phase induction motor, 200 mm dia Foot Valve at LIS Aizal Malal
2025_IFC_278194_1
MID/AN/07
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
15 days
Akhnoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹3,600
Yes
Office of Executive Engineer MID Akhnoor/Nowshera
25 Jun 2025
3 Jun 2025
17 Jun 2025
3 Jun 2025
16 Jun 2025
5 Jun 2025
4 Jun 2025
1 Repair to 100 HP 3 phase induction motor of pumping unit no.01 installed at LIS Kotgarhi H/L. The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply. Shifting of the motor to workshop by mechanical transport. Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Extraction of burnt winding from the stator, cleaning of stator with petrol. P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process. Assembling of the motor. Shifting the motor back to LIS. Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump, testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges. 01 Complete Job 2 Repair to 90 HP 3 phase induction motor of pumping unit no.01 installed at LIS Aizal Malal . The job involves dismantling the motor by unfastening the foundation nuts and bolts and also decoupling from the pump and disconnecting the electrical connections from the main supply. Shifting of the motor to workshop by mechanical transport. Then complete dismantling of the motor involves extraction of rotor from stator followed by cleaning of stator and rotor using compressed air, organic solvent, CCL4 etc. to remove the dust particles /silt etc. Extraction of burnt winding from the stator, cleaning of stator with petrol. P/F of new winding wire of suitable gauge & size in the stator, varnishing the stator winding with superior quality of varnish. Drying the stator winding with hot air circulation process. Assembling of the motor. Shifting the motor back to LIS. Refitting the motor at its installed position and coupling with pump, making of electrical connections, alignment with pump, testing of motor on full load. Complete job includes the cost of material, labour charges, hiring charges of tools & tackles, transportation charges. 01 Complete Job 3 Repairs to 200 mm dia foot valve assembly of pumping unit no.01 installed at LIS Aizal Malal. The job involves disconnecting / dismantling of the foot valve assembly from the suction pipe by deploying manual labour and allied tools & tackles. Shifting / transporting to the workshop. Cleaning by washing with water to make the foot valves completely silt free. After drying them completely, carrying out necessary repair works on the valve surfaces and flanged joints by welding using good quality electrodes. Dismantling of damaged / worn-out foot valve mechanism with flap & rings etc. Complete repair to the damaged flap plate and strainer by way welding. Providing / fitting of new rubber washer cut as per size of the flap plate. Reassembling the foot valve and transporting back to the installation site at LIS. Fitting the valves to the respective suction lines with replacement of damaged rubber gaskets of flanged joints and worn-out nuts, bolts etc. Complete job including cost of material, labour charges, transportation charges and hire charges for tools & tackles. 01 Complete Job
M/S FASTTRACK ENGINEERS (BID ID -2383019)
N B Engineering and Electric Works (BID ID -2383796)
NATIONAL ELECTRO-MECH COMPANY (BID ID -2383764)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .