Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.9 LAccepted-Finance | ₹20.9 L | 1 | Accepted-Finance ok |
| 2 | 2₹24.0 L+₹3.1 L (14.6%)Rejected-Finance AMLA | ₹24.0 L+₹3.1 L (14.6%) | 2 | Rejected-Finance ok |
| 3 | 3₹24.8 L+₹3.9 L (18.4%)Rejected-Finance | ₹24.8 L+₹3.9 L (18.4%) | 3 | Rejected-Finance ok |
| 4 | 4₹25.6 L+₹4.7 L (22.3%)Rejected-Finance | ₹25.6 L+₹4.7 L (22.3%) | 4 | Rejected-Finance ok |
| 5 | 5₹27.0 L+₹6.1 L (29.1%)Rejected-Finance | ₹27.0 L+₹6.1 L (29.1%) | 5 | Rejected-Finance ok |
Tender Value
₹39.1 L
EMD Value
₹50,000
Closing Date
2 Apr 2026, 6:00 pmClosed
EE PWD SIDHI
EE PWD SIDHI
Survey and preparation of a Detailed Project Report DPR for the construction of the Churhat Amiliya Sihawal Road Length 64.54 km and the Sihawal Khairpur Chitrangi Road Length 14.00 km Total Length 78.54 km.
2026_PWDRB_489087_1
NIT 25 /SIDHI / 2025-26 / 10-03-26
Open Tender
Survey related works
Percentage
120 days
EE PWD SIDHI
Survey and preparation of a Detailed Project Report DPR for the construction of the Churhat Amiliya Sihawal Road Length 64.54 km and the Sihawal Khairpur Chitrangi Road Length 14.00 km Total Length 78.54 km.
3 documents required · 3 mandatory
₹5,000
₹50,000
1 Jun 2026
17 Mar 2026
4 Apr 2026
17 Mar 2026
2 Apr 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Survey and investigation for road work with chain and compass, auto level, theodolite or total station i/c fixing of permanent benchmark and also fixing of bench mark on all the permanent structures, along the alignment, like boundary wall, electrical poles etc. Also marking of locations of boundary wall, electric poles, telephone poles, trees etc. in the road plan, collection and submission of existing inventory of the road all along the alignment conducting survey@20 metre interval for Lsection and for single lane X-section interval will be @ 0.75, 1.25, 1.875, 2.60, 3.75, 4.50, 5.50 and 6.50 metre on both side of centre line for two lane/ four lane interval for x-section shall be as specified in MORT&H Specifications. Data collected as specified above are required to be submitted in both hard and soft copies, L-section, X-section and plan is required to be submitted in the shape of drawing sheets drawn with the help of auto plotter. Soil samples @ every 500 metre or wherever soil appears to change its properties are required to be collected and soil investigation for LL, PL, swelling index and CBR are to be conducted and result too be submitted along with the project report. Job also includes collection of data for traffic census, fixing of RTL, getting it approved from Engineer-in-Charge and accordingly submission of pavement design in accordance with relevant clauses of IRC. Preparation of estimate complete and submission of same in eight copies duly spiral binded.
iii) For two lane road | 78.54 | Km. | 9,125 | ₹7,16,677.5 |
| 2 | Carrying out catchment area traverse survey of minor stream (not traceable in toposheet) below 100 acres | 134 | Sq. Km. | 3,460 | ₹4,63,640 |
| 3 | Survey of C.D. works including taking L-Section of road, catchment area plan by Traverse method and taking trial pits of size 1.50M x 1.50M x 1.50M including preparation of detailed plans and estimates in 5 copies and all types of compliance if required from the department. | 142 | Each | 5,000 | ₹7,10,000 |
| 4 | Survey of Minor bridge including taking L section of existing road upto 500 m both side and two defined cross sections, one of 300 m U/s and one of 300 m D/s at the bridge site, one vergin cross section on alternate proposed cross sections and bed slope of stream upto sufficient long distance as required with chain and compass. Taking three trial pits of size 1.00x1.00x3.0 m and collecting samples of materials at site for ascertaining the silt factor, unit weight test, specific gravity from Govt. approved laboratories (testing charges to be borne by the agency) and preparation of detailed survey data, submission of the project duly typed, site plan and other drawings etc. complete as required by the Department. | 18 | Each | 15,000 | ₹2,70,000 |
| 5 | Survey of Major bridge including taking L-section of existing road upto 500 m each side and two defined cross sections, one of 300 m U/s and one of 300 m D/s and one virgin cross section on alternate proposed cross sections and bed slope of stream upto sufficient long distance as required with chain and compass. Taking 5 trial pits, three in bed, two on banks of size 2.00x2.00x3.00 m for collecting samples of materials at site for ascertaining the silt factor, unit weight test, specific gravity from Govt. approved laboratories (testing charges to be borne by the agency) and preparation of detailed survey data, submission of the project duly typed and coloring of ammonia prints, site plan and other drawings etc. complete. And all types of compliance if required from Department. (Excluding taking trial bores and contouring) | 5 | Each | 25,000 | ₹1,25,000 |
| 6 | Detailed topo graphy Survey of ROB/Fly Over by using total station along with the existing or new road including L- Section of alignment, Cross section @ 20 m inteval, picking up all existing detailed surrounding data like electric telephone line, encroachment, existing structure etc. connecting all the primary total station control point by GIS Bench mark RL also correlate with MSL and preparation of detailed survey data, submission of the project duly typed and coloring of ammonia prints, site plan and other drawings etc. complete. And all types of compliance if required from Department. (Excluding taking trial bores and contouring) all autocad plan by using above data taking out two setof colour printout with required size. | 1 | Each | 35,000 | ₹35,000 |
| 7 | Preparation of initial drawing of Bridge/ ROB/Fly Over with preparing General Arrangement drawing with dimensions etc. complete and preparation of rough estimate for all components of bridge. Including supplying four copies of coloured drawings and copy of drawing on C.D. (excluding geotechnical and structural design part.).
(i) Slab Culvert | 124 | Each | 1,000 | ₹1,24,000 |
| 8 | Preparation of initial drawing of Bridge/ ROB/Fly Over with preparing General Arrangement drawing with dimensions etc. complete and preparation of rough estimate for all components of bridge. Including supplying four copies of coloured drawings and copy of drawing on C.D. (excluding geotechnical and structural design part.).
(ii) Minor Bridge | 18 | Each | 2,500 | ₹45,000 |
| 9 | Preparation of initial drawing of Bridge/ ROB/Fly Over with preparing General Arrangement drawing with dimensions etc. complete and preparation of rough estimate for all components of bridge. Including supplying four copies of coloured drawings and copy of drawing on C.D. (excluding geotechnical and structural design part.).
(iv) ROB | 1 | Each | 10,000 | ₹10,000 |
| 10 | Preparation of Engineering drawing as strip plan, widening scheme, index / key map, typical cross section, retaining walls, road furniture, general arrangement drawings for bus bays / truck lay-bays / rest areas / toll plaza / booths / and type drawing of pipe/ slab drains etc. on computer using Auto CAD. | 78.54 | Km. | 9,982 | ₹7,83,986.28 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
489087doc.pdf
Tender Documents • 18.21 MB
BOQ_581025.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .