Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹10.5 L+₹2,022.59 (0.19%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SREE INFRA L2 | DHANUSH ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.001. Constraction of RCC Slab Culvert @ Palla Colony in Velagapuram Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. Depth 0 to 0.30 | 78.8 | CUM | 270 ₹21,276 | 263.5 ₹20,763.8 Lowest |
| 3.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 5.25 | CUM | 2,220 ₹11,655 | 2,214 ₹11,623.5 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 11.63 | CUM | 6,090 ₹70,826.7 | 6,086.8 ₹70,789.48 Lowest |
| 5.00 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 77.74 | CUM | 6,395 ₹4,97,147.3 | 6,389 ₹4,96,680.86 Lowest |
| 6.00Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. | |||||
| 7.00 | i ) Below Sill | 158.33 | SQM | 550 ₹87,081.5 | 547 ₹86,606.51 Lowest |
| 8.00 | ii) Above Sill | 23.4 | SQM | 1,100 ₹25,740 | 1,095 ₹25,623 Lowest |
| 9.00 | Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (20mm Metal) | 6.71 | CUM | 7,480 ₹50,190.8 | 7,475 ₹50,157.25 Lowest |
| 10.00 | Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 8.1 | CUM | 9,970 ₹80,757 Lowest | 9,970 ₹80,757 Lowest |
Tender Value
₹10.6 L
EMD Value
₹11,000
Closing Date
16 Oct 2025, 3:00 pmClosed
BDO (VP) POONDI
BDO OFFICE POONDI
Construction of RCC Slab Culvert at Palla Colony in Velagapuram Panchayat in Poondi Block of Thiruvallur District. under PMAGY 2022-23.
2025_RDTN_612482_1
767/2023/A7
Open Tender
Civil Works
Item Rate
180 days
BDO OFFICE POONDI
refer tender document
5 documents required · 5 mandatory
₹0
₹11,000
Yes
18 Nov 2025
8 Oct 2025
16 Oct 2025
8 Oct 2025
16 Oct 2025
8 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .