Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 CrAccepted-AOC PANCHAYAT COLONY G EXTENSION NAHARLAGUN DISTRICT PAPUMPARE ARUNACHAL PRADESH 791110 | NAHARLAGUN | PAPUMPARE | ARUNACHAL PRADESH | 791110 | ₹18.0 Cr | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹24.7 Cr+₹6.7 Cr (37.1%)Rejected-Finance | ₹24.7 Cr+₹6.7 Cr (37.1%) | L2 | Rejected-Finance Other than L1 |
| 3 | L3₹28.3 Cr+₹10.3 Cr (57.1%)Rejected-Finance A 153 HQ CE EC KOLKATA LEKHAPANI POST TINSUKIA DIST ASSAM STATE | ₹28.3 Cr+₹10.3 Cr (57.1%) | L3 | Rejected-Finance Other than L1 |
| 4 | L4₹30.8 Cr+₹12.8 Cr (70.9%)Rejected-Finance 3A RAM MOHAN MULICK GARDEN LANE UNIT NO 6A 3RD FLOOR KOLKATA 700010 | KOLKATA | WEST BENGAL | 700010 | ₹30.8 Cr+₹12.8 Cr (70.9%) | L4 | Rejected-Finance Other than L1 |
| 5 | L5₹33.4 Cr+₹15.3 Cr (85.3%)Rejected-Finance 11 JAMES HICKEY SARANI 2ND FLOOR KOLKATA 700069 | KOLKATA | KOLKATA | WEST BENGAL | 700069 | ₹33.4 Cr+₹15.3 Cr (85.3%) | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | M/s Singh enterprises L3 | NARSINGH DEVELOPERS LLP L4 | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L5 | Shree Shyam Enterprise L2 | M/s Yarkum Agency L1 |
|---|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. PHASE I Schedule 'A' Part-I(A) | ||||||||
| 1.01 | Construction of Office & administrative Accn and Ancillary Accn, RCC framed structure, Single storey, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | 1 | Each Block | 3,00,00,000 ₹3,00,00,000 | 3,47,00,000 ₹3,47,00,000 | 4,23,35,600 ₹4,23,35,600 | 2,70,00,000 ₹2,70,00,000 | 2,15,00,000 ₹2,15,00,000 Lowest |
| 1.02 | Construction of Transit Accn for 180 ORs , RCC framed structure, (G+2), ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | 1 | Each Block | 4,85,00,000 ₹4,85,00,000 | 5,13,00,000 ₹5,13,00,000 | 4,52,50,000 ₹4,52,50,000 | 4,20,00,000 ₹4,20,00,000 | 90,00,000 ₹90,00,000 Lowest |
| 1.03 | Construction of Transit Accn for 20 JCOs and Single living Accn for 01 Hav and 05 ORs and storage Accn , RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | 1 | Each Block | 1,30,00,000 ₹1,30,00,000 | 1,31,25,000 ₹1,31,25,000 | 1,75,00,000 ₹1,75,00,000 | 89,00,000 ₹89,00,000 Lowest | 1,00,00,000 ₹1,00,00,000 |
| 1.04 | Construction of Cook House and Dining Hall for 180 ORs , RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | 1 | Each Block | 1,50,00,000 ₹1,50,00,000 | 1,56,00,000 ₹1,56,00,000 | 1,24,75,000 ₹1,24,75,000 | 1,00,00,000 ₹1,00,00,000 Lowest | 1,50,00,000 ₹1,50,00,000 |
| 1.05 | Construction of JCO Mess, Dinning and Kitchen for transit JCOs and 02 permanent staff , RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | 1 | Each Block | 85,00,000 ₹85,00,000 | 1,02,00,000 ₹1,02,00,000 | 98,00,000 ₹98,00,000 | 60,00,000 ₹60,00,000 Lowest | 80,00,000 ₹80,00,000 |
| 1.06 | Construction of Armouries and Armourer , RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | 1 | Each Block | 30,00,000 ₹30,00,000 | 32,00,000 ₹32,00,000 | 38,40,000 ₹38,40,000 | 19,50,000 ₹19,50,000 | 2,00,000 ₹2,00,000 Lowest |
| 1.07 | Construction of Covered Accn for 'B' Vehicles, MT drivers standby, Change room and Gen Set room, RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | 1 | Each Block | 1,12,00,000 ₹1,12,00,000 | 1,17,00,000 ₹1,17,00,000 | 90,41,152 ₹90,41,152 | 75,00,000 ₹75,00,000 | 30,00,000 ₹30,00,000 Lowest |
| 1.08 | Construction of Parking Shed for Bicycle and Scooter, RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | 1 | Each Block | 6,50,000 ₹6,50,000 | 7,00,000 ₹7,00,000 | 7,50,000 ₹7,50,000 | 4,00,000 ₹4,00,000 Lowest | 6,00,000 ₹6,00,000 |
| 1.09 | Construction of Parking Shed for Single Living Accn (01 Hav & 05 ORs), RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings.
Note for Sr. Item No. 1.01 to 1.09 above:
(i) Boring of pile and cast-in-situ of pile including its concrete and reinforcement shall be measured and paid separately under relevant Schedule.
(ii) Cost of pile cap including RCC, reinforcement and form work & its earthwork are included in the quoted amount of building. | 1 | Each Block | 12,50,000 ₹12,50,000 Lowest | 13,65,600 ₹13,65,600 | 17,80,000 ₹17,80,000 | 12,50,000 ₹12,50,000 Lowest | 15,60,000 ₹15,60,000 |
Tender Value
₹16.7 Cr
EMD Value
₹11.6 L
Closing Date
2 May 2026, 6:00 pmClosed
CE SHILLONG ZONE
HQ CE SHILLONG ZONE, SPREAD EAGLE FALLS, SHILLONG, MEGHALAYA-793011
PROVISION OF OTM ACCN TYPE B AT DINJAN UNDER GE DINJAN
2026_MES_749304_2
89823/DIN
Open Tender
Civil Works
Lump-sum
750 days
DINJAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
GE DINJAN
₹11.6 L
18 Jun 2026
10 Apr 2026
4 May 2026
10 Apr 2026
2 May 2026
25 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Construction of Office & administrative Accn and Ancillary Accn, RCC framed structure, Single storey, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | - | Each Block | - | - |
| - | Construction of Transit Accn for 180 ORs , RCC framed structure, (G+2), ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | - | Each Block | - | - |
| - | Construction of Transit Accn for 20 JCOs and Single living Accn for 01 Hav and 05 ORs and storage Accn , RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | - | Each Block | - | - |
| - | Construction of Cook House and Dining Hall for 180 ORs , RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | - | Each Block | - | - |
| - | Construction of JCO Mess, Dinning and Kitchen for transit JCOs and 02 permanent staff , RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | - | Each Block | - | - |
| - | Construction of Armouries and Armourer , RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | - | Each Block | - | - |
| - | Construction of Covered Accn for 'B' Vehicles, MT drivers standby, Change room and Gen Set room, RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | - | Each Block | - | - |
| - | Construction of Parking Shed for Bicycle and Scooter, RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings. | - | Each Block | - | - |
| - | Construction of Parking Shed for Single Living Accn (01 Hav & 05 ORs), RCC framed structure, Single storey,, ACC block construction including ATT, APP roof treatment , built in furnitures and all fittings and fixtures complete all as specified and as shown on drawings.
Note for Sr. Item No. 1.01 to 1.09 above:
(i) Boring of pile and cast-in-situ of pile including its concrete and reinforcement shall be measured and paid separately under relevant Schedule.
(ii) Cost of pile cap including RCC, reinforcement and form work & its earthwork are included in the quoted amount of building. | - | Each Block | - | - |
| - | Lumpsum price workedout by the tenderer for BUILDING & STRUCTURE WORKS as listed in Schedule ‘A’ Part-I(B) | - | Lump-sum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.24 MB
TENDER.pdf
Tender Documents • 9.59 MB
BOQ_851107.xls
BOQ • 0.52 MB
269archdrgs1.pdf
Additional Documents • 17.59 MB
269strdrgs1.pdf
Additional Documents • 23.99 MB
TDDRAWINGSset1.pdf
Additional Documents • 17.99 MB
2ndcall89823dtcorr01.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .