| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.4 LAccepted-Finance HANU YOKMA | SENAPATI | MANIPUR | 795007 | ₹19.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹21.9 L+₹2.5 L (12.7%)Accepted-Finance | ₹21.9 L+₹2.5 L (12.7%) | L2 | Accepted-Finance L2 |
| 3 | L3₹2.3 L−₹17.1 L (87.9%)Accepted-Finance | ₹2.3 L−₹17.1 L (87.9%) | L3 | Accepted-Finance L3 |
| 4 | L4₹23.6 L+₹4.2 L (21.5%)Accepted-Finance | ₹23.6 L+₹4.2 L (21.5%) | L4 | Accepted-Finance L4 |
| Sl No | Description | Qty | Unit | M/S PHUNTSOG NAMGIAL GOVT CONTRACTOR L2 | M/S SANGAY DAWA GOVT CONTRACTOR L3 | MS SONAM CHOSDUP L1 | SIDH CONSTRUCTION COMPANY L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 226.2 | cum | 700 ₹1,58,340 | 370 ₹83,694 | 400 ₹90,480 | 120 ₹27,144 Lowest |
| 2.00 | Hand-packed stone filling into wire-crates/ gabions; excluding cost of stones and crates (labour only)
Deduct Voids 15% (Allow 85% of total qty) | 238.44 | cum | 750 ₹1,78,830 | 440 ₹1,04,913.6 Lowest | 500 ₹1,19,220 | 1,800 ₹4,29,192 |
| 3.00 | Supply of Stone boulder (crushed) nominal size 225 mm | 238.44 | cum | 700 ₹1,66,908 | 1,100 ₹2,62,284 | 500 ₹1,19,220 Lowest | 1,800 ₹4,29,192 |
| 4.00 | Supply of wire-crates 16' X 16' , (4" X 4" Mesh & 4 mm thk) including all carriage and head load complete job | 10,528 | sft | 30 ₹3,15,840 | 40 ₹4,21,120 | 25 ₹2,63,200 | 9 ₹94,752 Lowest |
| 5.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 18.56 | cum | 500 ₹9,280 | 2,000 ₹37,120 | 500 ₹9,280 | 40 ₹742.4 Lowest |
| 6.00 | Engagement of manual labours for disposing of unserviceable material / transporting the material to site of work wherever required as per direction of EIC. | 60 | No | 1,200 ₹72,000 | 850 ₹51,000 | 700 ₹42,000 Lowest | 1,400 ₹84,000 |
| 7.00 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal | 55.69 | cum | 1,000 ₹55,690 | 550 ₹30,629.5 | 500 ₹27,845 Lowest | 3,000 ₹1,67,070 |
| 8.00 | Dry stone pitching (any thickness) excluding cost of stones. On Slopes | 86.97 | cum | 600 ₹52,182 | 850 ₹73,924.5 | 500 ₹43,485 Lowest | 3,000 ₹2,60,910 |
| 9.00 | Supply of Stone boulder (nallah) nominal size 150 mm(Stack measurements reduced by 15%) | 121.26 | cum | 250 ₹30,315 Lowest | 1,100 ₹1,33,386 | 600 ₹72,756 | 2,000 ₹2,42,520 |
| 10.00 | Providing and laying in-situ concrete lining using M-20 nominal mix concrete (max. size of aggregates: 20mm nominal). | 47.55 | cum | 6,500 ₹3,09,075 | 8,000 ₹3,80,400 | 5,000 ₹2,37,750 | 2,500 ₹1,18,875 Lowest |
Tender Value
Refer Docs
Closing Date
11 Jul 2026, 4:00 pmClosed
Executive Engineer, Civil Division-II PDC Choglams
Executive Engineer, Civil Division-II PDC Choglamsar
Strengthening of the power canal and fencing/crates and RCC works along the canal for safety of the population residing adjacent to the power canal of 3MW Igo Mercellong SHP
2026_PDNRE_19141_1
NIT-03-CD-II/PDC/L/2026-27
Open Tender
Civil Works - Others
Item Rate
182 days
Choglamsar
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Payable To Pay and Accounts Officer PDC Leh
Exempted
14 Jul 2026
1 Jul 2026
13 Jul 2026
1 Jul 2026
11 Jul 2026
1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 226.2 | cum | - | - |
| 2 | Hand-packed stone filling into wire-crates/ gabions; excluding cost of stones and crates (labour only)
Deduct Voids 15% (Allow 85% of total qty) | 238.44 | cum | - | - |
| 3 | Supply of Stone boulder (crushed) nominal size 225 mm | 238.44 | cum | - | - |
| 4 | Supply of wire-crates 16' X 16' , (4" X 4" Mesh & 4 mm thk) including all carriage and head load complete job | 10,528 | sft | - | - |
| 5 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 18.56 | cum | - | - |
| 6 | Engagement of manual labours for disposing of unserviceable material / transporting the material to site of work wherever required as per direction of EIC. | 60 | No | - | - |
| 7 | Dry stone pitching (any thickness) excluding cost of stones. On Horizontal | 55.69 | cum | - | - |
| 8 | Dry stone pitching (any thickness) excluding cost of stones. On Slopes | 86.97 | cum | - | - |
| 9 | Supply of Stone boulder (nallah) nominal size 150 mm(Stack measurements reduced by 15%) | 121.26 | cum | - | - |
| 10 | Providing and laying in-situ concrete lining using M-20 nominal mix concrete (max. size of aggregates: 20mm nominal). | 47.55 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_45605.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .