Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹13.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹13.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹13.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹13.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹13.9 L
EMD Value
₹14,000
Closing Date
17 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, CD-III
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of barricade along bothside of MSWC-II from Naya Bazar Chhaka to Devine Nagar in Ward No.43.
2026_ORULB_144925_1
MC(KMC)CTC_Div-IIINo21/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
KMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹14,000
Yes
23 Nov 2026
6 Nov 2026
20 Nov 2026
6 Nov 2026
17 Nov 2026
6 Nov 2026
75 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantaling and removing RCC columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead as directed. | 0.18 | cum | 1,697 | ₹305.46 |
| 2 | Supplying and transporting and fitting and fixing M.S. Angle Frame Grill made with different size M.S. Angle and M.S. Flat as per design and well welding & grinding both side and stacking at work side including transporting from work shop to site as per specification and direction of Engineer in Charge | 2,035.95 | Kg | 127.01 | ₹2,58,586.01 |
| 3 | Supplying and transporting fitting and fixing 6gage BRC fabric Wire Mess as 3 per specification and direction of Engineer in Charge. (Materials Item No-143) | 341.25 | Sqm | 201.41 | ₹68,731.16 |
| 4 | Re-fixing of New Grill grills with lifting of cranes after desilting work is over etc complete as per the direction of Engineer in charge | 18 | hrs | 650.4 | ₹11,707.2 |
| 5 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2" to ½") crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion | 1.26 | cum | 6,552.1 | ₹8,255.65 |
| 6 | 6 mm thick cement plaster (1:4) to R CC surfaces finished smooth including 6 closed deep chiping and slury treatment as per specification etc. Complete. | 25.2 | Sqm | 212.5 | ₹5,355 |
| 7 | Straightening, cutting, bending and binding, welding and jointing (if necessary) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting. placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost 7 of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). | 1.01 | Qntl | 9,395.3 | ₹9,489.25 |
| 8 | Painting two coats with approved synthetic Enamel paint on one coat of primer incl. all cost of Primer, Paint, Labour, T&P etc. Complete. | 3,900 | Sqm | 264.6 | ₹10,31,940 |
stage.html
html • 0.03 MB
finance_618824.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.43 MB
BOQ_618824.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .