Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹32,800
Closing Date
3 Oct 2026, 2:00 pm6d left
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
Irungattukottai 110/33-11KV SS (Civil work)
2026_EB_707819_1
OT-39/2026-27 of SE/GCC-II/CNI
Open Tender
Civil Works
Works
120 days
Irunkattukkotai
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹32,800
Yes
24 Sept 2026
24 Sept 2026
5 Oct 2026
24 Sept 2026
3 Oct 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of juliflora jungle including cost of all labour, lead, lift, etc., complete | 200 | Sq.m | - | - |
| 2 | Dismantling the following items met with below ground level during execution including labour, tools etc.complete. (Dismantling PCC) | 3 | Cu.m | - | - |
| 3 | Dismantling the following items met with below ground level during execution including labour, tools etc.complete.( Dismantling RCC) | 3 | Cu.m | - | - |
| 4 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil and depositing on bank with initial lead of 10m and lift of 2m etc. | 97.59 | Cu.m | - | - |
| 5 | M.sand filling including cost of sand ,filling charges , labour for watering and consolidation leads and lift etc.complete. | 8.35 | Cu.m | - | - |
| 6 | Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 25 | Cu.m | - | - |
| 7 | Plain Cement Concrete 1:3:6 using 20mm HBG stone including cost of all materials, labour, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site . | 8.35 | Cu.m | - | - |
| 8 | Providing wet mix 1:3:6 below road portion including cost of all labour, lead, lift and T&P etc., complete. | 60 | Cu.m | - | - |
| 9 | Providing RCC 1:1.5:3 raft using 20 mm HBG metal with out form work including cost of all material, lead, lift, etc., complete excluding steel reinforcement (Raft) | 77.13 | Cu.m | - | - |
| 10 | Providing PCC 1:2:4 using 20mm downgraded HBG machine crushed metal for foundation concrete, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. (Without form work) | 50.02 | Cu.m | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_850651.xls
BOQ • 0.30 MB
OT39.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .