Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹16.2 LAccepted-AOC | L-1 | Accepted-AOC L1 | |
| 2 | L-2₹16.5 L+₹23,625 (1.46%)Rejected-Finance | L-2 | Rejected-Finance 2 |
Tender Value
₹15.8 L
EMD Value
₹31,500
Closing Date
26 Dec 2025, 6:00 pmClosed
Executive Engineer
HPPWD Dodra Kawar
R R Damages to Harli to Gosangu Road Gaon Pujarli to Tall Pool Km 0 000 to 2 500 SH Hiring of Pock Lane with rock breaker for Removal of Slips and Breaking of Boulders at Rd 0 000 to2 390
2025_PWD_123773_9
6231-6331 Dated 16/12/2025
Open Tender
Civil Works - Roads
Percentage
120 days
Dodra Kawar
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
₹31,500
28 Jul 2026
18 Dec 2025
27 Dec 2025
18 Dec 2025
26 Dec 2025
18 Dec 2025
Hiring of Excavator-Cum-Loader (POCK LANE/L&T) with 90 H.P Engine and lifting capacity of minimum 5000 Kmgs including P.O.L charge,shifting charges and other anciliary equipments as required at site of work for cutting in earth work in all heights in all kinds of soil such as Kankar,moorum shingle boulders decomposed or soft variety of soil such as spade work,pick work,Jumper work,soft rock,hard rock including their intermediate classification of soil including chieselling/wedging out of rock etc.where blasting is prohibited including saturated soils including filling in embankments where including consolidating with sheep foot rollers and disposal of this unserviceable materials in all leads and lifts including machanical transportation if necessary.The disposal of this unserviceable materials has to be done in the accquired width of the road to avoid damage to the properties of the people or in case any damage took place the contractor is liable for it. All salvaged materials such as quarried stone shall belong to the department and maximum useful quantity of stones from cutting work shall have to be neatly stacked along the road side on road burms. The work involves widening from existing width to IRC single lane standred width formation width 5 meters in straight and 7 meter in curve as per their radius. Minimum 40cm of earth work shall be done by the Machine in one hour,other wise number of hour shall be reduced accordingly.The work shall have to be carried out as per Ministry of Transport as per instruction of the Engineer-In Charge including all leads and lifts.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_181926.xls
BOQ • 0.25 MB
SBD4.pdf
Tender Documents • 4.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .