Loading…
Loading…
Tender Value
₹1.6 L
EMD Value
₹4,800
Closing Date
24 Jul 2026, 4:00 pm
Executive Engineer ID Ompora
Executive Engineer ID Ompora
Construction of RCC Channel on Pickte dara Kachber m/o Nov khul
2026_IFC_314589_5
enit2of072026
Open Tender
Civil Works
15 days
Budgam
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
Chief Engineer Kmr I and FC Deptt.
₹4,800
4 Jul 2026
4 Jul 2026
25 Jul 2026
4 Jul 2026
24 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 11.88 | Cum | 592.9 | ₹7,043.65 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.31 | Cum | 5,202.9 | ₹12,018.7 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 7.26 | cum | 7,104.35 | ₹51,577.58 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more. | 580.8 | Kg | 123.2 | ₹71,554.56 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 46.2 | sqm | 286.35 | ₹13,229.37 |
| 6 | Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking
Cement and Steel avg. lead of 01 km | 3.29 | MT | 114.44 | ₹376.51 |
| 7 | Sand avg. lead of 35 km | 4.5 | cum | 575.54 | ₹2,589.93 |
| 8 | Stone aggregate 40mm avg. lead 03 km | 2.05 | cum | 180.26 | ₹369.53 |
| 9 | Stone aggregate 20mm avg. lead 03 km | 6.46 | cum | 165.84 | ₹1,071.33 |
| 10 | Printing of Geo Tagged Photograps | 4 | No. | 50 | ₹200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.36 MB
BOQ_1018662.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid