| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.5 LAccepted-AOC 408 HAASH BUSINESS CENTER NR ANKUR SCHOOL FATEHPURA PALDI AHMEDABAD 380007 | AHMADABAD | GUJARAT | 380007 | ₹13.5 L | L-1 | Accepted-AOC WORK ORDER |
| 2 | L-2₹20.0 LRejected-Finance | ₹20.0 L | L-2 | Rejected-Finance NOT LOWEST BIDDER-L-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Document not submited as per NIT criteria |
| Sl No | Description | Qty | Unit | Arvind Techno Contracts L2 | Yash Energy Pvt. Ltd L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil | 34 | Cum | 200 ₹6,800 | 590 ₹20,060 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 22 | Cum | 5,000 ₹1.1 L | 9,000 ₹2.0 L |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 5 | Cum | 5,500 ₹27,500 | 9,500 ₹47,500 |
| 4.00 | Providing and laying 60mm thick factory made cement concrete interlocking paverblock of M -30 grade made by block making machine with strong vibratory compaction, of approved s;ze, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge | 144 | Sqm | 1,200 ₹1.7 L | 770 ₹1.1 L |
| 5.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 7.5 | Cum | 1,000 ₹7,500 | 1,425 ₹10,687.50 |
| 6.00 | Providing and fixing of pre-fabricated fire retardant water proof frangible bird watch hut of size 1200mm x 1200mm (outer to outer) and 2400mm height. There will be a provision of 01no. door of size 750mm (W) & 2000mm height and 03nos. window of size 600mm(W) & 900mm height with necessary locking arrangements. The hut is made of 50mm thick sand witch panel made of 2.00mm thick FRP/GRP sheet at the outer and inner face and balance portion (sandwitch) consist of PU foam of density 40+/- 2 kg/m3 to meet the frangibility criteria including PVC cam locks jointing without nut bolts on bottom and top and single piece corner panel. The panels will be joining together by tongue and groove method. The cost of the hut is inclusive of design fabrication, transportation and commissioning of the hut at the proposed site in operational area over cement concrete platform (Cement Concrete platform shall be paid separately) The exterior of the hut shall be provided with design of white and red squares (600mmx600mm) and as per the direction of E-I-C. The frangible hut shall conform to guideline of ICAO Aerodrome Manual (Doc 9157 part-6) and the frangibility criteria including Fire properties conforming to self-extinguishing as per IS 11239 and class -1 surface spread of flame as per BS-476 part-7,also Not easily ignitable as per BS 476 Part-5 All complete as per direction of Engineer-in-Charge. | 4 | Nos. | 4,17,860 ₹16.7 L | 2,40,300 ₹9.6 L |
Tender Value
₹17.5 L
EMD Value
₹35,088
Closing Date
31 Oct 2022, 6:00 pmClosed
AGM (E-C)
O/o Airport Director, Bhubaneswar
Supply and Installation of Frangible Hut for bird watching in Operational area
2022_AAI_129914_1
AAI/BS/ENGG(C)/NIT-05/2022-23
Open Tender
Civil Works
90 days
B.P.I.AIRPORT, BHUBANESWAR
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,180
₹35,088
9 Apr 2026
23 Sept 2022
2 Nov 2022
24 Sept 2022
31 Oct 2022
24 Sept 2022
24 Sept 2022 - 3 Oct 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Providing and laying 60mm thick factory made cement concrete interlocking paverblock of M -30 grade made by block making machine with strong vibratory compaction, of approved s;ze, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and fixing of pre-fabricated fire retardant water proof frangible bird watch hut of size 1200mm x 1200mm (outer to outer) and 2400mm height. There will be a provision of 01no. door of size 750mm (W) & 2000mm height and 03nos. window of size 600mm(W) & 900mm height with necessary locking arrangements. The hut is made of 50mm thick sand witch panel made of 2.00mm thick FRP/GRP sheet at the outer and inner face and balance portion (sandwitch) consist of PU foam of density 40+/- 2 kg/m3 to meet the frangibility criteria including PVC cam locks jointing without nut bolts on bottom and top and single piece corner panel. The panels will be joining together by tongue and groove method. The cost of the hut is inclusive of design fabrication, transportation and commissioning of the hut at the proposed site in operational area over cement concrete platform (Cement Concrete platform shall be paid separately) The exterior of the hut shall be provided with design of white and red squares (600mmx600mm) and as per the direction of E-I-C. The frangible hut shall conform to guideline of ICAO Aerodrome Manual (Doc 9157 part-6) and the frangibility criteria including Fire properties conforming to self-extinguishing as per IS 11239 and class -1 surface spread of flame as per BS-476 part-7,also Not easily ignitable as per BS 476 Part-5 All complete as per direction of Engineer-in-Charge.
Arvind Techno Contracts
stage.html
html • 0.04 MB
techsummary_141991.pdf
BOQ Comparative Chart
xlsx
finsummary_141991.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tenderdocument.pdf
Tender Documents • 4.92 MB
BOQ_141991.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid