Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.20% | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
24 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
REPAIRING/IMPROVEMENT OF WANI MOHALLA GRAVEYARD ALOOSA A
2026_RDPR_321285_6
NIT64
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹3,880
26 Aug 2026
18 Aug 2026
25 Aug 2026
18 Aug 2026
24 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 23.4 | Cum | 479.3 | ₹11,215.62 |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil. | 49 | Sqm | 24.12 | ₹1,181.88 |
| 3 | Supplying and laying of Dry stone soling hand packed tightly including all carriages complete. | 9 | Cum | 1,204 | ₹10,836 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 6.7 | Cum | 5,733.6 | ₹38,415.12 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of formwork | 12 | Sqm | 286.35 | ₹3,436.2 |
| 6 | 18mm Cement plaster in two coats under layer 12mm thick cement plaster1 : 5 (1 cement : 5 coarse sand) finished with a top layer 6mm thickcement plaster 1 : 3 (1 cement : 3 coarse sand) | 237 | Sqm | 428.65 | ₹1,01,590.05 |
| 7 | Structural steel work in single/ built up sections, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 151.3 | Kg | 120.8 | ₹18,277.04 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats New work | 18 | Sqm | 131.85 | ₹2,373.3 |
| 9 | Carriage of sand aggregates by MT and H/L | 9 | Cum | 520 | ₹4,680 |
| 10 | CIB and photography charges | 1 | Job | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1072268.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].