Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2.8 L
EMD Value
₹5,554
Closing Date
21 Feb 2020, 4:00 pmClosed
Executive Engineer PHE Division Poonch
Executive Engineer PHE Division Poonch
Installation, Testing Commissioning of HCP set 4000 GPH X 325 MH X 60 HP, control panel 60HP and 100 kva manual voltage stabilizer at Pumping station SakhiMendhar WSS Mendhar II languishing.
2020_PHE_92775_1
e-NIT No.69 of 2019-20 Dated-14-02-2020
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
15 days
Poonch
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Executive Engineer PHE Division Poonch
₹5,554
Yes
27 Feb 2020
14 Feb 2020
22 Feb 2020
15 Feb 2020
21 Feb 2020
15 Feb 2020
Amount
shifting of Horizontal pump set 4000GPH x 325 MH along with 60HP Induction motor & base frame along with 100 kva voltage stabilizer and from Divisional store Chandak by private vehicle by using chain pulley block/crane and manual labour & unloading at road side shifting to P/S Sakhi Mendhar . Head load carriage of machinery from road side to Pumping Station by making arrangement and using of manila rope, wooden logs etc. The job includes cost of manila rope. Excavation of trench for laying of foundation block of size 2.00mtrs×0.80mtrs×0.60mtrs,disposal of earth etc. about 50mtrs away from the trench. Laying of RCC foundation block for HCP set in 1:2:4 mix sufficiently elevated with respect to floor level. Fabrication & fitting of foundation/Anchor bolts of required size, 06 nos and fixing of base frames on the foundation blocks with the help of foundation / anchor bolts by tightening of foundation bolt and its proper levelling by using levelling tool. Curing of foundation block for one week. Placing/fitting of HCP & motor on base frame, fitting of coupling pulley set, it’s tightening with nuts bolts & washers after its proper levelling with steel shims etc. The job also includes labour charges for skilled/unskilled. Labour for material like sand, bajri, its carriage, loading of cement, steel from market shop and unloading at road side and shifting it to pump room. Laying/fitting of Suction and delivery pipe line of size 80 mm dia. of GI pipe (Medium) 13mtrs to be provided by the deptt..Providing & fitting of machined flanges for suction and delivery sides of pump. Cutting of pipes with cutter at site according to alignments of suction/delivery pipe line. P/f of MS bends 80mm Ø, CI heavy duty reflux valve 80mmØ, CI HD sluice valve 80mm Ø MS flanges 80 mmØ, nuts, bolts, washers, RI sheet 10Kg. Welding work at sight for welding of GI pipe, flanges, bends etc. Fabrication of bend angles according to alignment of suction & delivery. Complete job includes cost of material CI HD reflux valve 80mmØ at delivery line, CI HD sluice valve 80mm Øat suction line, machined MS flanges 80mmØ as per required size, MS bends, nuts, bolts, washers .Hire charges of welding set, cutter, grinder at site, cost of welding electrodes. Labour charges for skilled/unskilled. Job excludes cost of GI pipe 80mmØ 15 mtr
Installation of 100 kva Manual voltage stabilizer. shifting of voltage stablizar along with transformer oil (to be provided by department) from diviosanal store at chandak upto roard side pumping statioin near the approachable site and manual carraige from there to pumping station. Electrical Installation by way of fab./fitting of 01 no angle iron frame 2'x4' and drilling of holes for fitting of kit ply board 19mm thick water proof of size 2'x4'.Painting of angle iron with one shade of primer & two shade of high quality black paint.P/f of mica as per size of board.Providing and fitting of main switch 400 Amps, 440 volts of good quality ISI make, it’s fitting at existing panel board. P/F of 19/16 cu cable 50 mtrsapprox. in length from voltage stabilizer to Panel & panel to motor, its thimbling, crimpling by using crimpling tool etc. Designing /fabrication/ Installation/ Testing and Commissioning of Automatic LT control Panel of 415 volts, AC 3Phase 60HP capacity boostar motar .The panel should be rust and vermin proof. fabricated out of 16 SWG CR sheet supported on MS angle of suitable size and provision for fixing it on panel board. The panel should be sturdy enough for vibration free operation and should be equipped with suitable locking/sealing arrangement. The structure should be provided with suitable entry and exit holes for incoming and outgoing cables. The panel should be given two coats of anti rust primer and two coats of enamel paint. It should be equipped with following components/features:-MCCB:-The panel should be fitted with MCCB 160 Amp, 415 V, 35KA capacity to protect the panel in case of short circuit. VOLTMETER:- The panel should be fitted with digital voltmeter to show the voltage between phase to phase and between phase to neutral. AMPERE METER:- The panel should be fitted with digital Ampere meter CT operated to show the ampere between each phase. PHASE INDICATOR:-The panel should be fitted with phase indicator R/Y/B to indicate the phase. STAR-DELTA STARTER:-The panel should be fitted with 02No contactors 110Amp (L&T Make/ reputed Make) for main and Delta and 01 No contactors 70 Amp for star operation, 1No timers for change over the supply of motor from star to Delta,2No push buttons for start and stop operation of motor,1No thermal relay range of suitable capacity fitted with main contactors. All control wiring should be neat and clean with flexible copper cable to complete the star Delta circuit of outgoing supply and wiring should be protected with fuse. The system should provide protection against:-
• Low Voltage below 350 V. • High Voltage above 450 V. • Single phase • Reverse Phasing • Unbalance phasing • Dry running • Over loading Testing and commissioning of control panel by making/connecting to incoming terminals and outgoing terminal of control panel. Testing the performance of the panel on no load and on full load. Complete job includes cost of material, labour charges, carriage charges& fitment charges at the site of work. Complete job.
P/F of Al.Cable 250mm Sq. 50 mtrs in length H/D to be layed for making connection from LT pole to main switch to volt stabilizer for all three phases..The complete job includes cost of material and labour charges and hire charges of vehicle,charges skilled/unskilled and testing and commissioning of HCP set on full load.Testing and commissioning of HCP set after checking of alignment of pump & motor, and voltage stabilizer checking all the electrical connections with megger, tightening of loose connections if any, plugging of leakage of joints by welding & tightening of nuts & bolts etc.
SAIN ENGINERS
M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .