| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹10.2 L+₹6,616.50 (0.65%)Rejected-AOC | ₹10.2 L+₹6,616.50 (0.65%) | L2 | Rejected-AOC 2nd Lowest Bidder |
| Sl No | Description | Qty | Unit | SRI THIRUMURUGA CONSTRUCTION L1 | L.G.ARASU L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, ,and baling out water and cleaning and levelling the site etc.,complete 10 m3 | 221 | 1M3 (One Cubic Metre ) | 164.5 ₹36,354.5 Lowest | 170 ₹37,570 |
| 2.00 | Plain Cement Concrete 1:4:8 mix Using 40mm ISS HBG metal including all cost conveyance of materials and labour charges etc. complete as per standard specification | 28 | 1M3 (One Cubic Metre ) | 6,016 ₹1,68,448 Lowest | 6,020 ₹1,68,560 |
| 3.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 432 | 1Sqm (One Square Metre ) | 489 ₹2,11,248 Lowest | 495 ₹2,13,840 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 58 | 1M3 (One Cubic Metre ) | 7,405 ₹4,29,490 Lowest | 7,409 ₹4,29,722 |
| 5.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 144 | 1Sqm (One Square Metre ) | 290 ₹41,760 Lowest | 295 ₹42,480 |
| 6.00 | Manufacturing, supplying and fixing 50mm thick Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 216 | 1Sqm (One Square Metre ) | 513 ₹1,10,808 Lowest | 518 ₹1,11,888 |
| 7.00 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 133 | 1M3 (One Cubic Metre ) | 103 ₹13,699 Lowest | 108 ₹14,364 |
Tender Value
₹12.2 L
EMD Value
₹12,200
Closing Date
14 Jan 2026, 3:00 pmClosed
Commissioner Ponneri Municipality
MUNICIPAL OFFICE PONNERI
Construction of Storm Water Drain at Samarapuri Street (Part) in Ward No - 9 at Ponneri Municipality
2026_MAWS_640201_16
967/2025/E1
Open Tender
Civil Works
Works
MUNICIPAL OFFICE PONNERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,200
7 Aug 2026
7 Jan 2026
14 Jan 2026
7 Jan 2026
14 Jan 2026
7 Jan 2026
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, ,and baling out water and cleaning and levelling the site etc.,complete 10 m3
Plain Cement Concrete 1:4:8 mix Using 40mm ISS HBG metal including all cost conveyance of materials and labour charges etc. complete as per standard specification
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
Manufacturing, supplying and fixing 50mm thick Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed.
Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. For 1M3
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_766781.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .