Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC Quoted less than Tender Value | |
| 2 | L2₹5.2 L+₹29,710.57 (6.01%)Rejected-AOC | L2 | Rejected-AOC Quoted More than Tender Value |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
29 Jan 2024, 3:00 pmClosed
The Block Development Officer
The Block Development Officer,Anaicut
Vellore District,Construction of compound wall at Milk Soceity Building in Melarasampattu Panchayat for Anaicut Block General Fund II 2023-24 Package No 15.
2024_RDTN_407037_1
A2/1605/2023
Open Tender
Civil Works
Item Rate
180 days
The Block Development Office, Anaicut
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,000
8 Aug 2024
6 Jan 2024
29 Jan 2024
6 Jan 2024
29 Jan 2024
6 Jan 2024
Amount
Vellore District,Construction of compound wall at Milk Soceity Building in Melarasampattu Panchayat for Anaicut Block General Fund II 2023-24 Package No 15.
Earth work Excavating and depositing on bank with intial lead of 10m & initial lift of 2 m in hard stiff clay,stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per SS 20 B and SI 62 -For foundation
Cement concrete 1 : 4 : 8 mix using 40mm HBG stone jelly for foundation including watering if found necessary and laid inlayers of not more than 15 cm thick and compacted, etc., complete complying with standard specifications
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footing
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all including cost and conveyance of all materials to site and all
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,
Brick work in cement mortor 1:5 mix using solid block 0.4x015x0.20 m ISS including cost and conveyance of all materials to site and all including cost and conveyance of all materials to site and all
Plastering 1:5 mix using 12 mm thick iincluding cost and conveyance of all materials to site and all including cost and conveyance of all materials to site and all
Painting two of Extirear Emulsion paint including cost and conveyance of all materials to site and all including cost and conveyance of all materials to site and all
Providing NEW IRON GATE
Provision of Nameboard Charges
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.KAVITHA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_484358.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .