Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.3 LAccepted-AOC R O VILLAGE PICHOLIA DISTRICT KARNAL | KARNAL | HARYANA | 132001 | 1 | Accepted-AOC L-1 | |
| 2 | 2₹3.4 L+₹8,125.27 (2.45%)Rejected-Finance | 2 | Rejected-Finance L-2 | |
| 3 | 3₹3.5 L+₹20,006.14 (6.04%)Rejected-Finance 1 SADHANA SOCIETY DEV BAUG DEVBAUG BHAVNAGAR GUJARAT 364001 | BHAVNAGAR | GUJARAT | 364001 | 3 | Rejected-Finance L-3 | |
| 4 | 4₹3.7 L+₹39,063.80 (11.8%)Rejected-Finance H NO 08 LATIF GARDEN ASSANDH ROAD PANIPAT | PANIPAT | HARYANA | 132101 | 4 | Rejected-Finance L-4 | |
| 5 | 5₹4.2 L+₹88,533.22 (26.7%)Rejected-Finance NARAINA PANIPAT | 5 | Rejected-Finance L-5 |
Tender Value
₹4.3 L
EMD Value
₹8,600
Closing Date
3 Feb 2025, 5:00 pmClosed
RISHI SACHDEVA
PD - II, Karnal
Special repair estimate for Govt. Veterinary Garhi Khajoor in Karnal Distt.
2025_HRY_426531_1
20250327474A 0B01 4CAA A3F2 09227E98B7AD645BAR
Open Tender
Civil Works
Works
90 days
GARHI KHANOOR
3 documents required · 3 mandatory
₹500
₹8,600
Yes
5 Jul 2025
28 Jan 2025
4 Feb 2025
28 Jan 2025
3 Feb 2025
28 Jan 2025
Amount
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [Through Rate]
[11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate]
[12.7.1.2]Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note:- Butt hinges and necessary screws shall be paid separately) 1.2. Second class teak wood 30 mm thick shutters [Through Rate]
[17.15.1]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 1. Grading I material [Through Rate]
[17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam (53mm to 22.4 mm)Grading II with screenings Type “B” (11.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate]
[17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[30.22]Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. [Through Rate]
[30.28.1]Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 1. One or more coats on old work [Through Rate]
[30.37.1]Finishing walls with Acrylic Smooth exterior paint of required shade : 1. Old work (Two or more coat applied @ 1.67 litre/ 10 sqm) on existing cement paint surface [Through Rate]
[7.22.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
Naresh Kumar (BID ID -1211125)
Krishna Construction Company (BID ID -1210546)
The Quality Coop Society Ltd (BID ID -1210820)
THE KAUSHIK COOP L C SOCIETY LTD NARAINA PANIPAT (BID ID -1210889)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .