| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC SAROJA CONTRACTOR SENJI TAMIL NADU TN | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹18,640.70 (0.13%)Rejected-AOC KRISHNAGIRI | TAMIL NADU | 635001 | ₹1.4 Cr+₹18,640.70 (0.13%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | R RAJENDIRAN L2 | Saroja L1 |
|---|---|---|---|---|---|
| 1.01Constrction of PHC Buidling @ Gengavaram Pt | |||||
| 1.02 | Clearing light jungle vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 304.2 | sq.m | 6.36 ₹1,934.71 Lowest | 6.36 ₹1,934.71 Lowest |
| 1.03 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. | 338.48 | cu.m | 263.78 ₹89,284.25 Lowest | 263.78 ₹89,284.25 Lowest |
| 1.04 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 50.38 | cu.m | 6,250 ₹3,14,876.61 | 5,880 ₹2,96,235.91 Lowest |
| 1.05 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 338.48 | cu.m | 45.85 ₹15,519.31 Lowest | 45.85 ₹15,519.31 Lowest |
| 1.06 | Supplying and filling of good earth filling locally available earth transported from the outside including consolidation, leveling specified in layers of not exceeding 200 mm thick., etc. complete. | 204.18 | cu.m | 120.99 ₹24,703.74 Lowest | 120.99 ₹24,703.74 Lowest |
| 1.07Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | |||||
| 1.08 | Upto Basement | 498.87 | Sq.m | 547.5 ₹2,73,130.23 Lowest | 547.5 ₹2,73,130.23 Lowest |
| 1.09 | Ground Floor | 682.04 | Sq.m | 1,095 ₹7,46,838.84 Lowest | 1,095 ₹7,46,838.84 Lowest |
| 1.10 | First Floor | 273.34 | Sq.m | 1,095 ₹2,99,304.56 Lowest | 1,095 ₹2,99,304.56 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
16 Oct 2025, 3:00 pmClosed
BDO(BP)
Block Development Office, Thiruvannamalai Road, Gingee
Construction of Primary Health Centre Building in Gengavaram Panchayat in Gingee Block
2025_RDTN_610556_1
Gingee/15CFC Grant (Health)/2025-26
Open Tender
Civil Works
Works
Gingee
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.5 L
Yes
12 Nov 2025
30 Sept 2025
16 Oct 2025
30 Sept 2025
16 Oct 2025
30 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .