Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC 610 3 KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.0 L+₹29,717.81 (17.6%)Rejected-AOC H NO 136 SUBHASH NAGAR TEHSIL CAMP PANIPAT HARYANA 132103 | PANIPAT | PANIPAT | HARYANA | 132103 | ₹2.0 L+₹29,717.81 (17.6%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Ms Bhavuk Construction L1 | CHIRAG WADHWA L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying of Go Green Shalmax-PR ready mix bituminous material for instant restoration of patchwork, repair of potholes, depression and road cuts to provide uniform and smooth riding surface complete in all respects and all other works contingent thereto. The contractor shall prepare the required surface for maximum results i.e. remove standing water / loose debris / dust with brush from potholes, will pour Shalmax-PR directly from the bag into potholes and overfill by 10mm. Compaction will be done with a simple hand rammer so as to cure quickly enough to open to traffic immediately after the compaction is completed. The contractor shall arrange all the traffic safety measures during the execution of the above said job and nothing extra shall be paid on this account by the Department.
(The Go Green Shalmax-PR supply will be of packing of 50 Kg. HDPE Bag with inside LDPE liner) | 3,200 | Per Kg. | 26 ₹83,200 Lowest | 35 ₹1,12,000 |
Tender Value
₹1.7 L
EMD Value
₹3,380
Closing Date
12 Sept 2026, 5:00 pmClosed
Jagmal
DIV Panipat
Providing and laying of WBM, shellmac complete Sector-18, Panipat.
2026_HBC_545772_1
20268FC8ECA6 72A0 42E3 91FE 47AEB350B84C241HSV
Open Tender
Civil Works
Works
30 days
Panipat
2 documents required · 2 mandatory
₹250
₹3,380
Yes
21 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
12 Sept 2026
7 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying of Go Green Shalmax-PR ready mix bituminous material for instant restoration of patchwork, repair of potholes, depression and road cuts to provide uniform and smooth riding surface complete in all respects and all other works contingent thereto. The contractor shall prepare the required surface for maximum results i.e. remove standing water / loose debris / dust with brush from potholes, will pour Shalmax-PR directly from the bag into potholes and overfill by 10mm. Compaction will be done with a simple hand rammer so as to cure quickly enough to open to traffic immediately after the compaction is completed. The contractor shall arrange all the traffic safety measures during the execution of the above said job and nothing extra shall be paid on this account by the Department.
(The Go Green Shalmax-PR supply will be of packing of 50 Kg. HDPE Bag with inside LDPE liner) | 3,200 | Per Kg. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_625361.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .