Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC | ₹3.8 Cr | L1 | Accepted-AOC L1 Lowest bidder |
| 2 | L2₹3.8 Cr+₹5.5 L (1.44%)Rejected-AOC | ₹3.8 Cr+₹5.5 L (1.44%) | L2 | Rejected-AOC L2 work alloted to Lowest bidde |
| Sl No | Description | Qty | Unit | Jiten Maslai L2 | Shiva Chetry L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil | 335 | Cum | 122 ₹40,870 | 120 ₹40,200 Lowest |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 507.9 | Cum | 125 ₹63,487.5 Lowest | 220 ₹1,11,738 |
| 3.00 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 155.46 | Cum | 8,458 ₹13,14,846.85 | 8,400 ₹13,05,830.4 Lowest |
| 4.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) M20 or Prop. 1:1.5:3 | 104.75 | Cum | 11,730 ₹12,28,717.5 | 11,700 ₹12,25,575 Lowest |
| 5.00 | Super-structure above plinth level Columns, pillars, posts, struts, suspended floor, roof, landing, shelf and support, balcony, lintel, sill band, beam, girder, bressumer, cantilever, staircase (except spiral staircase and landing ) including preparing the top surface and finishing of nosing.
M20 or Prop. 1:1.5:3 | 39.08 | Cum | 11,732 ₹4,58,463.1 | 11,700 ₹4,57,212.6 Lowest |
| 6.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies,shelves, chajjas, lintels,bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 19.33 | Cum | 12,320 ₹2,38,194.88 | 12,300 ₹2,37,808.2 Lowest |
| 7.00 | Supplying, fitting and fixing in position reinforcement bars conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete (upto 1st floor level).
TMT-Corrosion Resistant Steel (Fe-500) reinforcement bar
(i) TATA/SAIL | 17,018.48 | Kg | 105 ₹17,86,939.98 | 100 ₹17,01,847.6 Lowest |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete
In foundation : | 117.6 | Sqm | 353 ₹41,512.8 | 350 ₹41,160 Lowest |
| 9.00 | Lintels,beams, plinth beams, girders,bressumers and cantilevers. | 470 | Sqm | 698 ₹3,28,060 | 690 ₹3,24,300 Lowest |
| 10.00 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 652.68 | Sqm | 922.5 ₹6,02,097.3 | 920 ₹6,00,465.6 Lowest |
Tender Value
₹3.8 Cr
EMD Value
₹7.6 L
Closing Date
28 Aug 2025, 3:00 pmClosed
Addl. CE, PWD (R and B), Hills, Assam, Diphu
Addl.CE,PWD(R and B), Hills, Assam, Diphu
Construction of 50 bedded hostel separately for boys and girls at Tengkeralangso High School under the scheme Dharti Aaba Janjatiya Gram Utkarsh Abhiyan
2025_KAAC_46557_1
ACEH/CS/SSA/03/2025-26/NSL47
Open Tender
Civil Works - Building
Item Rate
Chinthong
Please refer Tender documents.
5 documents required · 5 mandatory
₹7,600
₹7.6 L
Yes
Addl.CE,PWD(R and B), Hills, Assam, Diphu
21 Feb 2026
18 Aug 2025
30 Aug 2025
18 Aug 2025
28 Aug 2025
18 Aug 2025
20 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.50 MB
Tendernotice_1.pdf
PDF • 0.39 MB
FOB50bedded.pdf
Tender Documents • 0.29 MB
BOQ_74162.xls
BOQ • 0.36 MB
SBD50beddedhostelboysgirls.pdf
Tender Documents • 2.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .