Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1Accepted-AOC 314 20 SHAKTI NAGAR GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹1 | 1 | Accepted-AOC ok |
| 2 | 2₹2+₹1 (100.0%)Rejected-AOC | ₹2+₹1 (100.0%) | 2 | Rejected-AOC ok |
| Sl No | Description | Qty | Unit | V S Enterprises | Guru Engineering Works |
|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance of water supply scheme
Iqbalpur group of 5 Nos. villages (Mubarikpur,
Kaliawas, Jhanjrola, Khera, Sultanpur) and 4 Nos.
Dhanies including all installation pumping machinery,
rectification of leakage, rising main, sub rising main and
distribution pipe line along with T/Wells and VBS
pumping machinery
For Ist Year | 1 | Job | 9,50,000 ₹9,50,000 | 8,50,000 ₹8,50,000 Lowest |
| 2.00 | Operation and Maintenance of water supply scheme
Iqbalpur group of 5 Nos. villages (Mubarikpur,
Kaliawas, Jhanjrola, Khera, Sultanpur) and 4 Nos.
Dhanies including all installation pumping machinery,
rectification of leakage, rising main, sub rising main and
distribution pipe line along with T/Wells and VBS
pumping machinery
For 2nd Year | 1 | Job | 8,50,000 ₹8,50,000 | 7,80,000 ₹7,80,000 Lowest |
| 3.00 | Operation and Maintenance of water supply scheme
Iqbalpur group of 5 Nos. villages (Mubarikpur,
Kaliawas, Jhanjrola, Khera, Sultanpur) and 4 Nos.
Dhanies including all installation pumping machinery,
rectification of leakage, rising main, sub rising main and
distribution pipe line along with T/Wells and VBS
pumping machinery
For 3rd Year | 1 | Job | 6,85,000 ₹6,85,000 | 6,65,000 ₹6,65,000 Lowest |
Tender Value
₹19.1 L
EMD Value
₹38,260
Closing Date
6 Nov 2025, 5:00 pmClosed
NITIN MODI
Gurgaon PHED
Operation and Maintenance of water supply scheme Iqbalpur group of 5 Nos. villages (Mubarikpur, Kaliawas, Jhanjrola, Khera, Sultanpur) and 4 Nos. Dhanies including all installation pumping machinery, rectification of leakage, rising main, sub rising
2025_HRY_479977_1
2025A23A66D4 459B 4BD5 B8AF 6678E2B69571557PUH
Open Tender
Civil Works
Works
1095 days
Iqbal Pur JHANJROLA Sultan Pur MUBARIKPUR Kali
2 documents required · 2 mandatory
₹1,000
Yes
₹38,260
Yes
11 Dec 2025
28 Oct 2025
7 Nov 2025
28 Oct 2025
6 Nov 2025
28 Oct 2025
Operation and Maintenance of water supply scheme Iqbalpur group of 5 Nos. villages (Mubarikpur, Kaliawas, Jhanjrola, Khera, Sultanpur) and 4 Nos. Dhanies including all installation pumping machinery, rectification of leakage, rising main, sub rising main and distribution pipe line along with T/Wells and VBS pumping machinery For Ist Year
Operation and Maintenance of water supply scheme Iqbalpur group of 5 Nos. villages (Mubarikpur, Kaliawas, Jhanjrola, Khera, Sultanpur) and 4 Nos. Dhanies including all installation pumping machinery, rectification of leakage, rising main, sub rising main and distribution pipe line along with T/Wells and VBS pumping machinery For 2nd Year
Operation and Maintenance of water supply scheme Iqbalpur group of 5 Nos. villages (Mubarikpur, Kaliawas, Jhanjrola, Khera, Sultanpur) and 4 Nos. Dhanies including all installation pumping machinery, rectification of leakage, rising main, sub rising main and distribution pipe line along with T/Wells and VBS pumping machinery For 3rd Year
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_557950.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .