Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
14 Aug 2026, 4:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
SRDEN II
16 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N; or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Detail instructions as per clause 3.5.2 of Standard Tender Document- 2022.
Technical Eligibility Criteria: (a)The Tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: - (i) Three similar works costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. NOTE: - •The Tenderer(s) should submit self-attested copy of work completion certificate indicating that Contractor have completed similar nature of work as mentioned in S.N. 1.1 below •Completion certificate issued by competent authority should mention Name of work, name of agency, Contract agreement detail, date of completion, Completed Cost of work, Nature of firm (Partnership/Proprietorship) and details of its constituents, if any, PAN/GSTIN etc so that evaluation may be done accordingly. Definition of Similar Nature of Work ""CTR/TRR/TFR/TTR including raising of track, screening, distressing of track, pre & post works for track maintenance machines like tamping machines/ballast screening/regulating machines & TTR by T-28"
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificate issued by any Govt. Organization, work experience certificate issue by Public listed company having average annual turnover of Rs. 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated /registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Detail instructions as per clause 3.5 & 3.6 of Standard Tender Document- 2022.
36 conditions · 5 needing a document upload
Please provide details of banks account no. of the firm for ECS payment required for necessary payments record as per Annexure-XII of Northern Railway Standard Tender Document 2022.
Please provide details of PAN no. (Self attested copy should be uploaded).
Please provide details of your GSTIN No. (Self attested copy should be uploaded).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer shall submit along with the tender document, documents in support of his/their claim to fulfill the eligibility criteria as mentioned in the tender document. Each page of the copy of documents/certificates in support of credentials, submitted by the tenderer, shall be self-attested/digitally signed by the tenderer or authorized representative of the tendering firm. Self attestation shall include signature, stamp and date (on each page). Only those documents which are declared explicitly by the tenderer as "documents supporting the claim of qualifying the laid down eligibility criteria", will be considered for evaluating his/their tender.
The Railway reserves the right to verify all statements, information and documents submitted by the bidder in his tender offer, and the bidder shall, when so required by the Railway, make available all such information, evidence and documents as may be necessary for such verification. Any such verification or lack of such verification, by the railway shall not relieve the bidder of its obligations or liabilities hereunder nor will it affect any rights of the railway there under.
In case of any wrong information submitted by tenderer, the contract shall be terminated, Bid security, Performance Guarantee (PG) and Security Deposit (SD) of contract forfeited.
Care in Submission of Tenders: Please refer to clause 3.0 of Northern Railway Standard Tender Document 2022.
Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt. & as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the Contractor. The Contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
Mandatory updation of Labour data on Railway's shramikkalyan portal by Contractor. For details refer clause 5.4 of Northern Railway Standard Tender Document 2022.
In addition to General condition of contract 2022 and Indian Railways Unified standard specification Works Materials Volume I II 2010 (revised up to date), special condition attached shall also apply.
The GST Act 2017 will be applicable as per extant policy as notified by Central/State Govt. and as amended from time to time. All the bidders/tenderers should ensure that they are GST compliant and their quoted rates are inclusive of taxes and GST.
The quantities given above are approximate and can be increased/decreased as per extant rules.
During execution of work ensure the quality of Material is to be used as per CE Circular No. 630 circulated vide CE(P&D), L.No. 10-W/O/Policy/Building dt.26/12/2016 and revised time to time.
No Post Tender correspondence for submission of additional documents shall be entertained after opening of the Technical & Commercial offers. Even suo-moto post tender letters of the tenderers shall be treated as NULL & VOID. (Authority HQ Letter No. 74-W/O/Pt.XXV/WA/Loose dated 07.04.15).
The contract will be governed by Indian Railways Standard General Conditions of Contract updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents.
All Annexure should be uploaded in Standard format as prescribed in Standard Tendered Document-2022.
The successful bidder shall submit the Performance Guarantee (PG), amounting to 5% of the original contract value. If quoted rates of successful bidder is below 5% of the advertised tender value, an additional Performance Guarantee i.e. 5% also shall be submitted as per advance correction slip no. 11 of GCC-2022 issued vide RB letter no. 2022/CEI/ CT/GCC- 2022/POLICY/Pt.I(E3320424) dated 13.03.2026).
Undertakings by Partnership Firm- In case the Letter of Acceptance (LOA) is issued to a partnership firm, the undertakings as per clause 18.10 of Annexure -VIII of Northern Railway Standard Tender Document 2022 shall be furnished by all the partners through a notarized affidavit, before signing of contract agreement.
Fraud & Corrupt Practice: Please refer to clause 3.10 of Northern Railway Standard Tender Document 2022.
Conditional offer and Alternative proposal by Tenderer: Tenderers shall submit offers that fully comply with the requirements of the Tender documents including the conditions of contract, design and specification requirements if any. Conditional offer or alternative offers will not be considered in tender evaluation and will be summarily rejected. The Tenderer shall have no claims in this regard whatsoever. "Any unconditional rebate offered by the tenderer should be mentioned on of 'Schedule of Quantities' specifically. To attract the rebate mentioned each page of schedule may refer the note for the conditional rebate mentioned in the end. Any rebate mentioned at any other place in tender document shall not be considered. The unconditional rebate mentioned in "Scheduled of Quantities" shall be considered while evaluation of bid." mentioned in the end. Any rebate mentioned at any other place in tender document shall not be considered. The unconditional rebate mentioned in "Scheduled of Quantities" shall be considered while evaluation of bid."
TRR(P) in ON-BLM section & other Miscellaneous Works under ADEN/HRI-II
134-DRM-MB-26-27
134-DRM-MB-26-27
Open
Works - General
6 Months
Moradabad, Uttar Pradesh
₹0
₹3.0 L
21 Jul 2026
21 Jul 2026
31 Jul 2026
87 items across 10 schedules · ₹1,78,14,175 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Up to 40 m long rail panel | RM | 500.00 | 10.51 | 5,255 |
| 2 | More than 40 m long rail panel | RM | 16890.00 | 16.64 | 2,81,049.6 |
| 3 | Extra to Item no. 061011 for working on bridge | RM | 200.00 | 4.6 | 920 |
| 4 | Extra to Item no. 061012 for working on bridge | RM | 200.00 | 7.67 | 1,534 |
| 5 | For Through Rail Renewal work | TRM | 8445.00 | 51.55 | 4,35,339.75 |
| 6 | For Through Rail Renewal work | TRM | 8445.00 | 53.16 | 4,48,936.2 |
| 7 | For Casual/Scattered Rail Renewal work | RM | 1000.00 | 43.13 | 43,130 |
| 8 | Locations other than Ballasted Deck Bridge | Each | 500.00 | 544.17 | 2,72,085 |
| 9 | Fish plates of 6 bolts. | Joint | 100.00 | 299.22 | 29,922 |
| 10 | Through Fitting Renewal (TFR) on PSC track, comprising of renewal of Grooved Rubber Pads, Liners and ERCs without damaging PSC sleepers. Scope includes removal of all fittings, cleaning of rail seat, rail flange at liner seats, and eye of Inserts with wire brushes and applying Grease Graphite Grade "O" (IS:408) to eye of insert and central leg of ERC with contractor's grease of Railway's specification, fixing all fittings in correct position and sealing liner edges with grease all complete including collection and stacking of released materials at nominated locations within SSE Jurisdiction as directed by Engineer-in-Charge. Note: All the fittings will be supplied at SSE/Stores/Depot. | Sleeper | 10700.00 | 27.16 | 2,90,612 |
| 11 | Lubrication of ERCs and its liner contact area by removal of ERCs and Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal / GFN liners & SGCI insert by using wire brush, scrapper / sand emery paper etc supply and application of graphite grease, as prescribed by Railway for under side of liners & corresponding area of rail foot & SGCI insert with ERCs and re-fixing the same as per procedure prescribed in latest edition of IRPWM with contractors grease and all other tools & plants complete and as directed. Note: Each ERC in this item shall constitute 1 ERC and its Liner Contact area. | ERC | 250000.00 | 4.55 | 11,37,500 |
| 12 | By using Contractor's Grease Graphite | Each | 25000.00 | 37.95 | 9,48,750 |
| 13 | Renewal of seized Plate/Rail screws on PSC Sleepers by using gas or any approved methods, duly drilling holes in broken screw and removing existing screw pieces from the holes along with existing dowels and fixing new contractor's dowels (procured from RDSO approved sources) and grouting around dowel with Epoxy materials of approved specification and refixing new Railway's rail/Plate screws duly greasing the screw with specified grease with all contractor's materials, consumables, tools & plants, labour with all lead, lift. Note: 1.Seized screws shall be identified and marked by JE/P.Way and verified at minimum SSE/P.Way In charge) level. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if sleeper gets damaged in the process. | Each | 350.00 | 158.79 | 55,576.5 |
| 14 | Rail section of 52Kg and above | Each | 1000.00 | 110.37 | 1,10,370 |
| 15 | Renewal of existing SEJ with improved SEJ with PSC sleepers under traffic block conditions as per approved drawing including fixing of special size bearing plate, rubber pad and other sleeper / rail fittings, greasing to the fittings, leading rails, sleepers & fittings to site, leading and stacking of released materials within a lead of 250m, cutting of Rails, drilling of holes, fixing of related fittings, providing temporary connection with fishplates till welding of SEJ is done and sleepers shall be given initial packing to make track fit for 20KMPH speed. Note: (1) Rail cutting and hole drilling shall be paid separately. (2) One set comprise complete SEJ on both rails at SEJ. | Set | 10.00 | 9,657.84 | 96,578.4 |
| Schedule total | ₹41,57,558.45 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022_1.pdf
ATTACHMENT
HQLetter.pdf
ATTACHMENT
SpecialConditionforTrackWork.pdf Special Condition
ATTACHMENT
STD-2022UPTOCS-11.pdf
ATTACHMENT
GCC-2022ACSUPTO11.pdf
ATTACHMENT
SpecialConditionforTrackWork.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].