| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.0 CrAdmitted-Finance | -39.04% | ₹13.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹15.5 Cr+₹2.5 Cr (19.3%)Admitted-Finance CORPORATE OFFICE E BLOCK E44 GROUND FLOOR SECTOR 36 G B NAGAR 201310 | NAGAR | G B NAGAR | UTTAR PRADESH | 201310 | -27.27% | ₹15.5 Cr+₹2.5 Cr (19.3%) | L2 | Admitted-Finance |
| 3 | L3₹16.4 Cr+₹3.4 Cr (26.5%)Admitted-Finance | -22.87% | ₹16.4 Cr+₹3.4 Cr (26.5%) | L3 | Admitted-Finance |
| 4 | L4₹16.5 Cr+₹3.6 Cr (27.5%)Admitted-Finance 7 GADHI DADRI G B NAGAR U P | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | -22.25% | ₹16.5 Cr+₹3.6 Cr (27.5%) | L4 | Admitted-Finance |
| 5 | L5₹18.0 Cr+₹5.0 Cr (38.9%)Admitted-Finance 223 U S COMPLEX SECOND FLOOR JASOLA MATHURA ROAD NEW DELHI 110076 | SOUTH | DELHI | 110076 | -15.30% | ₹18.0 Cr+₹5.0 Cr (38.9%) | L5 | Admitted-Finance |
Tender Value
₹21.3 Cr
EMD Value
₹31.3 L
Closing Date
12 Sept 2025, 5:00 pmClosed
SM_TENDER CELL
GNIDA OFFICE
Construction of 130m wide road RCC drain and Sewerage from Sector Ecotech-9 to E.P.E. Underpass (Village-Ladpura), Greater Noida.
2025_GNIDA_1069609_10
SM/(E-TENDER CELL)/2025/651 DATED-27.08.2025
Open Tender
Civil Works
Fixed-rate
365 days
GREATER NOIDA
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹6,770
₹31.3 L
17 Sept 2026
29 Aug 2025
15 Sept 2025
29 Aug 2025
12 Sept 2025
29 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-A Road work
Cleaning jungle including up rooting of rank, vegetations grass, push, wood trees and samplings of grith upto 30cms. measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50M. Out side periphery of area cleared. (SOR-20/259(i)) | 35,460 | Sqm | 3.1 | ₹1,09,926 |
| 2 | Excavation for road work in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transportig to the embankment location within all lifts and lead upt 1000m (MORTH-3.60 | 48,462 | Cum | 119.3 | ₹57,81,516.6 |
| 3 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads. Transporting to site, spreading, grading to required slope and compacting to meet requirement of Table No 300-2: lead upto of 5.00KM (MORTH--20/305/3.18) | 6,294.15 | Cum | 368.02 | ₹23,16,373.08 |
| 4 | Granular sub-base with graded material, plant mix method
Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 for grade-1 material (MORTH/(AR/GNIDA) | 2,517.66 | Cum | 4,389.06 | ₹1,10,50,160.8 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density (MORTH/4.14/406(A)) | 3,102.75 | Cum | 5,004.19 | ₹1,55,26,750.52 |
| 6Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres. | |||||
| 6.01 | With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 (DSR-18/16.7.1) | 1,182 | Rmt | 158.19 | ₹1,86,980.58 |
| 7Cement concrete with 4cm gauge Approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work | |||||
| 7.01 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) | 41.37 | Cum | 5,820 | ₹2,40,773.4 |
| 8 | M-150 brick work in 1:6 cement & fine sand 1.25 FM mortar in foundation and plinth including supply of all material labour and T&P etc required for proper completion of the work. (SOR-20/303)
same as item no 303 but in 1:4 one cement & four fine sand of 1.25 F.M. mortar. (SOR-20/305)
Same as item no 305 but in 1:4 one cement & four coarse sand of 2.20 F.M. mortar. (SOR-20/305(A)) | 62.53 | Cum | 4,950 | ₹3,09,523.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.09 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.70 MB
BOQ_1951546.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .