| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.4 LAdmitted-Finance | ₹23.4 L | L1 | Admitted-Finance |
| 2 | L2₹26.8 L+₹3.4 L (14.4%)Admitted-Finance | ₹26.8 L+₹3.4 L (14.4%) | L2 | Admitted-Finance |
| 3 | L3₹27.0 L+₹3.6 L (15.6%)Admitted-Finance | ₹27.0 L+₹3.6 L (15.6%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ILEN GOGOI L2 | SRI UTPAL GOGOI L3 | BASANTA GOGOI L1 |
|---|---|---|---|---|---|---|
| 1.00Execution of works | ||||||
| 1.01 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | 328.73 | M2 | 75.6 ₹24,851.99 | 76.34 ₹25,095.25 | 66.07 ₹21,719.19 Lowest |
| 1.02 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 14.35 | M3 | 2,122.01 ₹30,450.84 | 2,142.61 ₹30,746.45 | 1,854.39 ₹26,610.5 Lowest |
| 1.03 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). | 23.01 | M3 | 2,507.28 ₹57,692.51 | 2,531.62 ₹58,252.58 | 2,191.07 ₹50,416.52 Lowest |
| 1.04 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 8.21 | M3 | 271.87 ₹2,232.05 | 274.51 ₹2,253.73 | 237.58 ₹1,950.53 Lowest |
| 1.05 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m." All kinds of soil. | 97.34 | M3 | 268.11 ₹26,097.83 | 271.34 ₹26,412.24 | 234.3 ₹22,806.76 Lowest |
| 1.06 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | 29.36 | M3 | 2,187.46 ₹64,223.83 | 2,208.7 ₹64,847.43 | 1,911.59 ₹56,124.28 Lowest |
| 1.07 | Provision for flat brick soling under floors, including watering, ramming, consolidating and dressing complete | 587.08 | M2 | 607.7 ₹3,56,768.52 | 613.6 ₹3,60,232.29 | 531.06 ₹3,11,774.7 Lowest |
| 1.08 | Providing and laying in position cement concrete of specified grade excluding the cost of centering andshuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 58.72 | M3 | 8,114.86 ₹4,76,504.58 | 8,193.64 ₹4,81,130.54 | 7,091.44 ₹4,16,409.36 Lowest |
| 1.09 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 18.13 | M3 | 7,591.77 ₹1,37,638.79 | 7,665.48 ₹1,38,975.15 | 6,634.32 ₹1,20,280.22 Lowest |
Tender Value
₹26.0 L
EMD Value
₹65,100
Closing Date
5 Jun 2026, 12:00 pmClosed
SA, ASI, Guwahati Circle.
Office of the Superintending Archaeologist, Archaeological Survey of India, Guwahati Circle, 5th Floor, West End Block, HOUSEFED Complex Beltola -Basistha Road, Guwahati -781006
Please refer tender documents.
2026_ASI_909813_1
2/215-W/2025-26-475
Open Tender
Civil Works - Others
Works
150 days
Devidol
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹65,100
Yes
15 Jul 2026
22 May 2026
6 Jun 2026
22 May 2026
5 Jun 2026
22 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Execution of works | |||||
| 1.01 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | 328.73 | M2 | - | - |
| 1.02 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 14.35 | M3 | - | - |
| 1.03 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). | 23.01 | M3 | - | - |
| 1.04 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved | 8.21 | M3 | - | - |
| 1.05 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m." All kinds of soil. | 97.34 | M3 | - | - |
| 1.06 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | 29.36 | M3 | - | - |
| 1.07 | Provision for flat brick soling under floors, including watering, ramming, consolidating and dressing complete | 587.08 | M2 | - | - |
| 1.08 | Providing and laying in position cement concrete of specified grade excluding the cost of centering andshuttering - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 58.72 | M3 | - | - |
| 1.09 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 18.13 | M3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.54 MB
BOQ_956225.xls
BOQ • 0.30 MB
DevidolSivasagarSR.pdf
Tender Documents • 11.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .