Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC | ₹14.8 L Quoted ₹17.4 L | L1 | Accepted-AOC 1 Bidder |
| 2 | L2₹21.3 LRejected-Finance | ₹21.3 L | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹21.8 LRejected-Finance | ₹21.8 L | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹22.5 LRejected-Finance | ₹22.5 L | L4 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | M/s B. P. Singh L3 | M/S G ANANDA BABU L1 | M/S. ASSTABHUJA ENGINEERING AND CONSTRUCTION L4 | Amir Hussain L2 |
|---|---|---|---|---|---|---|---|
| 10.00 | SCHEDULE ITEMS | 1 | Nos | 15 ₹21.3 L | 8 ₹17.0 L | 19 ₹22.0 L | 12.5 ₹20.8 L |
| 20.00 | NON SCHEDULE ITEMS | 1 | Nos | 20 ₹48,659.51 | 1 ₹40,955.09 | 19 ₹48,254.01 | 12.5 ₹45,618.29 |
Tender Value
Refer Docs
Closing Date
16 Jan 2025, 3:00 pmClosed
Dhirendra Kumar RaiDGM (CPG-2 CnM)
Sipat Super Thermal Power Proj PO Ujwal Nagar District Bilaspur 495555
Construction of river ghat and Changing Green room at Tikera river,Karadai village.
2025_NTPC_93591_1
NTPC/USSC-CPG2/9900294623
Limited
Civil Works
90 days
Talcher Super Thermal Power Station
2 documents required · 2 mandatory
₹0
Exempted
15 Jan 2026
7 Jan 2025
17 Jan 2025
7 Jan 2025
16 Jan 2025
7 Jan 2025
7 Jan 2025 - 13 Jan 2025
Amount
SCHEDULE ITEMS
NON SCHEDULE ITEMS
Amir Hussain
M/s B. P. Singh
M/S. ASSTABHUJA ENGINEERING AND CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_96805.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid