Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAccepted-AOC 45 47 INDUSTRIAL ESTATE BHILAI HOUSING BOARD BHILAI DURG CHHATTISGARH 490026 | DURG | CHHATTISGARH | 490026 | ₹7.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹7.0 Cr+₹1 L (0.14%)Rejected-Finance | ₹7.0 Cr+₹1 L (0.14%) | L2 | Rejected-Finance L2 |
| 3 | L3₹7.0 Cr+₹3 L (0.43%)Rejected-Finance | ₹7.0 Cr+₹3 L (0.43%) | L3 | Rejected-Finance L3 |
| 4 | L4₹10.3 Cr+₹3.3 Cr (46.8%)Rejected-Finance 1102 1104 LODHA SUPREMUS I THINK TECHNO CAMPUS KANJURMARG E MUMBAI MAHARASHTRA 400042 | MUMBAI SUBURBAN | MAHARASHTRA | 400042 | ₹10.3 Cr+₹3.3 Cr (46.8%) | L4 | Rejected-Finance L4 |
| 5 | L5₹10.6 Cr+₹3.7 Cr (52.4%)Rejected-Finance A 16 FRONT SIDE MOBILE COMMUNICATIONS INDIA PRIVATE LIMITED NARAINA INDUSTRIAL AREA PHASE II NEW DELHI PHASE II | ₹10.6 Cr+₹3.7 Cr (52.4%) | L5 | Rejected-Finance L5 |
Tender Value
₹6.6 Cr
EMD Value
₹5.8 L
Closing Date
19 Jun 2023, 3:00 pmClosed
CGM (Contract Cell), NRO
INDIANOIL BHAWAN, 3rd FLOOR, REGIONAL CONTRACT CELL NORTHERN REGION 1, AUROBINDO MARG, YUSUF SARAI, NEW DELHI-110016
Design, Engineering, Supply, Manufacture, Fabrication, Installation, Testing and Commissioning of Vapour Recovery System at Bareilly Depot under IOCL Uttar Pradesh-II State Office.
2023_NRO_165987_1
RCC/NR/UPSO-II/ENG/PT-30/23-24
Open Tender
Mechanical Works
Tender cum Auction
300 days
Refer NIT
As per NIT
6 documents required · 6 mandatory
₹5.8 L
Yes
Pre-bid meeting shall not take place in person
15 Sept 2023
16 May 2023
20 Jun 2023
16 May 2023
19 Jun 2023
5 Jun 2023
16 May 2023 - 24 May 2023
24 May 2023
Amount
Design, Supply, Installation, Testing, Commissioning and Operation of Vapor Recovery Unit at IOCL Bareilly Depot, Manufacture, procurement of materials and bought out components, assembly at shop, painting, testing at manufacturer's works, packing and supply of skid mounted Vapour Recovery System suitable for Class A (Flash point below 23 deg. C) petroleum product including supply of all equipment, power/signal/ control cables (from PMCC, Control Rooms to VRU System), cable trays, instrumentation, commissioning spares, mandatory spares, consumable and special tools & tackles, procurement of materials and bought out components, assembly at shop, painting, testing at manufacturer's works, packing, first fill of lubricants, adsorbents, membranes, drawings and documents as per the enclosed technical specifications & data sheets , other codes and standards as applicable. The scope of supply is inclusive of providing Design, Engineering preparation and submission of all documents & datasheets, drawings, calculation, etc for the proposed VRU system & obtaining approval from IOCL/ PMC Agency. The supply of the VRU system is inclusive of obtaining PESO/ CCOE Approval for the proposed VRU system & its individual components including providing Technical/ Coordination/ Follow up Services, towards preparation and submission of all documents & datasheets, drawings etc including carrying out required no of visits to concerned PESO office. Scope of work involves installation, testing , commissioning and operation of supplied equipment’s. Note: 1) The system to be designed in line with the site requirement/ data sheet/ technical requirement provided along with the tender document. 2) Items to be supplied to site with necessary Test Certificates from OEM of respective equipment & inspection/ dispatch clearance from approved TPI agency as per the QAP for which separate payment shall not be made.
The supply of the VRU system is inclusive of obtaining PESO/ CCOE Approval for the proposed VRU system & its individual components including providing Technical/ Coordination/ Follow up Services, towards preparation and submission of all documents & datasheets, drawings etc including carrying out required no of visits to concerned PESO office. Scope of work involves installation, testing , commissioning and operation of supplied equipment’s. Note: 1) The system to be designed in line with the site requirement/ data sheet/ technical requirement provided along with the tender document. 2) Items to be supplied to site with necessary Test Certificates from OEM of respective equipment & inspection/ dispatch clearance from approved TPI agency as per the QAP for which separate payment shall not be made. (Kindly refer to tender document for details)
Supply and Installation of vapour recovery arm of size 100 mm NB having 4” (100 NB) with poppeted vapour coupler, break away coupler, NRV, flame arrestor, reducers, mounting structures, parking stand with compatible API adaptor, associated accessories, mounting structure etc complete as per specifications and tender document. Application : MS Note: Any modification required to be done in the existing pipeline ( TLF header ) for installation of supplied loading arm shall be done by IOCL.
Operation & maintenance charges (for 7 years - after acceptance of the system) Comprehensive Operations and Maintenance charges including deputation of resident engineer as per the bidders scope of & including all the consumables / spares for 7 years for the VAPOUR RECOVERY UNIT specified in tender specifications. Note: CAMC Charges for each year of operation from from 2nd year to 7th year shall be minimum 3% of the supply and Installation Cost. In case the successful bidder quotes less than 3% of the value in Line item 1 as mentioned above, then for the purpose of payment ‘quoted amount’ (2nd year to 7th year) would be considered as follows: a. CAMC rate for the years which are less than 3% shall be made 3% and Page 5 of 5 equivalent amount shall be deducted from the quoted rate in Line Item 1.1
Charges for CAMC during 1St year of Operation
Charges for CAMC during 2nd year of Operation
Charges for CAMC during 3rd year of Operation
Charges for CAMC during 4th year of Operation
Charges for CAMC during 5th year of Operation
Charges for CAMC during 6th year of Operation
Charges for CAMC during 7th year of Operation
Bidder Name
Amount in Words
M P Engineering Constructions (I) Pvt.
Mobile Communications (India) Pvt Ltd
Beekay Engineering Corporation
ISHAN EQUIPMENTS PVT.LTD
Zeeco India Pvt Ltd
Tianmo Environmental India Pvt. Ltd.
Tianmo Environmental India Pvt. Ltd.
Zeeco India Pvt Ltd
Beekay Engineering Corporation
M P Engineering Constructions (I) Pvt.
ISHAN EQUIPMENTS PVT.LTD
Tianmo Environmental India Pvt. Ltd.
Zeeco India Pvt Ltd
Beekay Engineering Corporation
M P Engineering Constructions (I) Pvt.
ISHAN EQUIPMENTS PVT.LTD
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .