Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹19.3 LAccepted-AOC | ₹19.3 L | L 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical 107 133 B MILLERPURAM TUTICORIN 628008 | TUTICORIN | TUTICORIN | TAMIL NADU | 628008 | - | - | Rejected-Technical L3 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L2 |
Tender Value
Refer Docs
EMD Value
₹39,046
Closing Date
9 Mar 2026, 12:00 pmClosed
Chief Engineer
Chief Engineer, VOC Port
Leveling the area of proposed Korkai Retreat Project near Marine Police station in VOC Port
2026_VOCPT_269464_1
CIV-MTCB2-MNT-LEVEL-V1-26
Limited
Civil Works
30 days
VOC Port
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹39,046
16 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
9 Mar 2026
3 Mar 2026
Deploying earth moving machinery JCB wherever required for the following works viz., Earthwork excavation, filling, levelling the undulated area, cleaning the vegetation along with roots, removal of unwanted debris / juliflora trees, loading into lorry and for any other works required etc., including cost of diesel, oil, operator charges etc., complete and as directed by the departmental officers.
Excavation in marshysoil with hydraulic excavator 1 cum bucket capacityincluding cutting and loading in taurus, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections.The rate inclusive of all tools & plants, machinery hire charges, labour, fuel charges etc., complete and as directed by the departmental officers. (Payment will be made based on the operating Hours).
Engaging DOZER 50 HP for cutting, levelling the dredged material / soil for an average height of 1.00m in borrow pits with all lifts & leads, spreading, grading to required slope and compacted to meet the requirements to the nearby area, etc., the rate inclusive of all tools & plants, machinery hire charges, labour, fuel charges etc., complete and as directed by the departmental officers.(Payment will be made based on the operating Hours).
Filling the low lying area using dredging material / available approved material by cutting, loading, transporting by deploying required equipments like excavator, tipper, with all lifts and leads to site with an average lead of 1 Km., spreading in uniform thickness, watering, compacting by deploying required equipments like grader, roller etc.,The rate inclusive of conveyance, tools & plants, hire charges for machinery, fuel charges, all labour etc., complete andasdirected bythe departmental officers.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_313860.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid