| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹59 LAccepted-AOC A 249 1ST FLOOR TODAY BLOSSOM 1 SEC 47 GURUGRAM | GURUGRAM | GURUGRAM | HARYANA | 1 | Accepted-AOC Accepted | |
| 2 | 2₹59.6 L+₹64,255.26 (1.09%)Rejected-Finance | 2 | Rejected-Finance Rejected | |
| 3 | 3₹72.1 L+₹13.1 L (22.3%)Rejected-Finance | 3 | Rejected-Finance Rejected |
Tender Value
₹60.7 L
EMD Value
₹1.2 L
Closing Date
22 Apr 2024, 5:00 pmClosed
Shitij Kumar
Division FMDA
Electrical and Plumbing works at fountain in Leisure Valley Park, Dabua Colony, Faridabad.
2024_HRY_361531_1
20245C5831B2 2F0F 4825 81FD 5DBCFA1EE2B41851002
Open Tender
Civil Works
Works
180 days
Faridabad (MC)
2 documents required · 2 mandatory
₹1,000
₹1.2 L
Yes
9 Oct 2024
29 Feb 2024
23 Apr 2024
29 Feb 2024
22 Apr 2024
29 Feb 2024
Amount
Supplying and laying HT cable of 3.5c x 300 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench
Supply and laying 3½ X 240 sq mm XLPE insulated aluminium conductor armoured power cable 1.1 KV grade ISI marked
Copper conductor flexible cable for pumps of size 2.5 sqmm 3 core. Make - Finolex/LAPP/Polycab/RR/ KEI/Havells.
Copper conductor flexible cable for lights of size 1.5 sqmm 4 core Make - Finolex/LAPP/Polycab/RR/ KEI/Havells.
L.T. PANELS : Design, manufacture, testing at works, supply ,installation, testing and commissioning of 415V Main LT Panel Type Tested Assembly – TTA, CPRI /Independent international test house tested for all the tests as per IEC61439-1 and 2 and internal arc tests as per IEC 61641 V2, 50kA for 0.4 sec at HBB,VBB and cable chamber. Copies of the test certificates shall be submitted with the tender. LT Panel shall also be tested of design as per Seismic Zone 4 of IEC 60068-3-3 requires compliance against 0.4g acceleration. Panel shall be rated for Impulse withstand capability equal to or greater than the switchgears inside the panel. For operator safety IP2 X (touch proof) protection to be available even after opening the feeder compartment door. The compartmentalization to be achieved by using metal separators, use of PVC sheet / Hylem sheets shall not be allowed. Main LT Panel shall be form 4b, for form of separation and rest with form 3b ,only metallic covers shall be used, Hylem / PVC sheets shall not be allowed. The panel shall be FRONT operated, suitable for bus duct entry for transformer incomings. Outgoing panels shall be suitable for cable entry from the top/bottom. The type tested design of the Switchboard shall be proven design from the main switchgear manufacturer (OEM).However, panel shall be manufcatured by OEM / Lisenced partner of OEM. Type test reports shall be provided by the manufcaturer. The MLTP shall be complete in all respect including necessary painting as per the approved shade, fully complying as per Technical Specification and SLD and approved makes and in all respect with all accessories and fittings etc. for trouble free operation. [LT MAIN PANEL IN THE SUBSTATION outdoor panel)
SITC of VCB as per StandardSupply of 11KV 21KA 2 way RMU, manual with 1 Isolator, 1 VCB Outdoor Type, Non
Supply and laying of 120 mm dia (OD-120 mm and ID-103 MM Nominal) HDPE pipe (duly ISI Marked) under ground in trenches in horizontal direction across the road, as per direction of Engineer-In-Charge including jointing of pipe, cleaning etc., providing suitable covers on mouth of pipes, excavation of pits of required size at a depth of 0.3 meters to .5 meters etc. complete as
SITC of 5HP borewell Submersible pump set with necessary fitting Mounts
SITC Of 3` brass gate Valve with proper fittings
SITC of 2`X2`X1` gate valve pit with cover as per Standard
SITC of 1 HP mud submersible pump with 100ft hose pipe
1C x 10 sqmm earthing Cable
PDB for power distribution in different panel
100 mm dia PVC (HSR-2023-Basic Rate of Materials-B0241)
PVC Bend 100 dia (HSR-2023-Basic Rate of Materials-B0239)
2`PVC Pipe
2`PVC Elbow
2` PVC Tee
Supply and Laying of 90 mm 10kg PVC Pipe boring to fountain pole complete with 10 kg PVC Fitting ,Elbow ,Tee ,MTA Accsessories as per site condition work includes trenching fixing of pipe and covering as per the the direction of Engineer -incharge
Electrical Installations , Fire Fighting Detection and Alarm System COPPER WIRING IN MS CONDUIT (SURFACE/RECESS) Wiring for Light/Fan/call bell point in 1.5 sqmm FRLS PVC insulated copper conductor cable in 1.6 mm thick MS conduit pipe. Group A(HSR-2023-. Electrical Installations , Fire Fighting Detection and Alarm System- 23.1)
Supply Installation testing and commissionin of 1.5 tonne 5 star rated split AC complete in all respect and as directed by engineer in charge
Supply installation testing and commssioning of the ceiling fan with the following specifications: i. Sweep: 1400mm ii. Minimum RPM: 300 iii. Power consumption: 75w Complete in all respects and as directed by engineer in charge
SP MCB 6-32 A (HSR-2023-Basic Rate of Materials-EL115)
Bidder Name
Amount
JMD ELECTRICALS (GSTN-06BMLPK0651F1Z9) BID ID -1073070
Soham Sparkle(GSTN-NA)--1066013
M/S ENDEAVOUR POWER SERVICES(GSTN-NA)--1080917
M/S ENDEAVOUR POWER SERVICES
Soham Sparkle
M/S ENDEAVOUR POWER SERVICES
Soham Sparkle
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .