Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹42.0 L+₹2.0 L (5.04%)Admitted-Finance A 204 NYAYKHAND 1 INDIRAPURAM GHAZIABAD GHAZIABAD UTTAR PRADESH 201014 | GHAZIABAD | UTTAR PRADESH | 201014 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical NOT AS PER PQC |
| Sl No | Description | Qty | Unit | Galaxy Enterprises L1 | Star O and M Group L2 |
|---|---|---|---|---|---|
| 1.00MAINTENANCE OF CONVEYORS SYSTEM (in sub part: 1.01 - 1.80) | |||||
| 1.01 | Replacement of different size of conveyor drums. | 1 | Job | 8,583 ₹8,583 Lowest | 9,012 ₹9,012 |
| 1.02 | Greasing/overhauling of conveyor drums. | 2 | Job | 4,294 ₹8,588 Lowest | 4,509 ₹9,018 |
| 1.03 | Repairing of conveyor drum of any size. | 1 | Job | 9,681 ₹9,681 Lowest | 10,165 ₹10,165 |
| 1.04 | Replacement of gear coupling /pin bush coupling between motor and redactor at belt feeder/wagon tippler/electric wagon pusher. | 1 | Job | 5,410 ₹5,410 Lowest | 5,680 ₹5,680 |
| 1.05 | Replacement of electric winch trolley wheel shaft of conveyor bearing at conveyor 5A/5B. | 1 | Job | 10,736 ₹10,736 Lowest | 11,273 ₹11,273 |
| 1.06 | Replacement of rope shaft of electric winch trolley of conveyor 5A/5B. | 1 | Job | 10,905 ₹10,905 Lowest | 11,451 ₹11,451 |
| 1.07 | Replacement of driving steel wire rope by new one at conveyor 5A/5B. | 1 | Job | 11,595 ₹11,595 Lowest | 12,175 ₹12,175 |
| 1.08 | Repairing of driving steel rope at conveyor 5A/5B. | 1 | Job | 3,993 ₹3,993 Lowest | 4,192 ₹4,192 |
| 1.09 | Fabrication and replacement of raw coal bunker grating. | 1 | Job | 3,993 ₹3,993 Lowest | 4,192 ₹4,192 |
Tender Value
₹32.7 L
EMD Value
₹65,400
Closing Date
23 Aug 2025, 2:00 pmClosed
SE OMC V DTPS HTPS
OFFICE OF SE OMC V DTPS HTPS
Maintenance Fabrication and repairing work of all equipments of CHP, fuel oil pumps, Cleaning and Upkeeping of CHP and Fuel Oil Facility area, Decantation of Fuel Oil, attending lighting complaints and electrical maintenance at CHP, CTPS, HTPS
2025_RVUNL_1058253_1
ET04/OMC-V/CHDI/DTPS/HTP/25-26
Open Tender
Power/Energy Projects/Products
Lump-sum
365 days
HTPS Harduaganj
Refer Tender Documents
2 documents required · 2 mandatory
₹3,540
A/C No 11264105069 ISFC SBIN0001364
₹65,400
3 Oct 2025
21 Jul 2025
25 Aug 2025
21 Jul 2025
23 Aug 2025
21 Jul 2025
Amount
MAINTENANCE OF CONVEYORS SYSTEM (in sub part: 1.01 - 1.80)
Replacement of different size of conveyor drums.
Greasing/overhauling of conveyor drums.
Repairing of conveyor drum of any size.
Replacement of gear coupling /pin bush coupling between motor and redactor at belt feeder/wagon tippler/electric wagon pusher.
Replacement of electric winch trolley wheel shaft of conveyor bearing at conveyor 5A/5B.
Replacement of rope shaft of electric winch trolley of conveyor 5A/5B.
Replacement of driving steel wire rope by new one at conveyor 5A/5B.
Repairing of driving steel rope at conveyor 5A/5B.
Fabrication and replacement of raw coal bunker grating.
Repairing of raw coal bunker grating.
Fabrication and fitting of rubber scrapper on return side of conveyor at coal discharge hopper of conveyor.
Fabrication and installation of tension trolley / device at conveyor system/belt feeder system.
Replacement/repair of pulley/wheel or any other component of tension trolley device at conveyor system/belt feeders.
Replacement of inhaul/outhaul rope by new / old one.
Replacement of sheave assembly of inhaul/outhaul system.
Repairing/overhauling of sheave assembly of inhaul/outhaul system.
Replacement of gear coupling/pin bush coupling of redactor to drum or redactor to motor of any conveyor.
Overhauling of wheel support assembly of Russian wagon tippler.
Overhauling of R/G box of any conveyor/Russian wagon tippler
Replacement of R/G box of any conveyor / Russian wagon tippler
Welding of clits at rail line of plate form of Russian wagon tippler.
Repairing /overhauling of swinging feeder.
Repairing/replacement of scrapper at any conveyor.
Repairing/replacement of damper at any conveyor.
Re-railing the derailed coal wagon- Empty coal wagon
Re-railing the derailed coal wagon- Loaded coal wagon
Fabrication and replacement of center plate at TP-1/TP-2.
Fabrication and replacement of side plate at hopper of any conveyor.
Repairing / Replacement of Horizontal shock absorbers of RWT
Repairing of platform of RWT
Repairing of wheel foundation Assembly of RWT
Overhauling /Replacement of rest wall roller and roller system of RWT.
Repairing and strengthening of rest wall
Alignment of guide roller
Repairing of cradle beam
Replacement of suspension of wheel assembly of electric pusher car
Repairing/ replacement of wheel assembly of electric pusher car
Replacement of ceiling / hook of crane of electric pusher car
Replacement of bush of wheel of electric pusher car
Repairing of trolley platform of electric pusher car
Replacement of kamani of electric pusher car
Repairing / replacement of buffer of electric pusher car
Reloading of ceiling on pulley
Re railing of tension trolley on channel
Fabrication and erection of new foundation of redactor of swinging feeder.
Fabrication and erection of new foundation of motor of swinging feeder or winch trolley.
Fabrication & erection of opening of swinging feeder.
Alignment of winch trolley Track of Conveyor no. K-5A/5B.
Laying of water line of 63 mm dia of shower pipe
Fabrication and Erection of L-Band of shower pipe
Erection of Isolating Valve 40 mm dia of shower pipe
Drilling of holes of 4 mm dia on shower pipe
Fabrication and erection of Flange joint of shower pipe
Fabrication & Erection of support of shower pipe
Repairing of any key way and key of any shaft by welding and machining.
Repairing of bore of gear coupling-Motor Side of conveyor K-3A/3B
Repairing of bore of gear coupling- Drum side of conveyor K-3A/3B
Repairing of bore of gear coupling- Motor side of conveyor K-1,K-2A/2B,K-4A/4B & K- 5A/5B
Repairing of bore of gear coupling- Drum Side of conveyor K-1,K-2A/2B,K-4A/4B & K- 5A/5B
Repairing of bore of gear coupling- Motor /rotor side of Russian coal crusher
Repairing/replacement of fire hydrant valve 63mm.
Laying of fire hydrant line up to a length of 10 mtrs.
Fabrication and installation of hold back system using gear socket and lock.
Repairing of grating of hoppers of Russian wagon tippler with help of rail line pieces.
Repairing of grating of hopper of swinging feeder.
Repairing beam of Russian Wagon Tippler/swinging feeder.
Replacement of beam of Russian Wagon Tippler /Swinging feeder.
Repairing / Replacement of valve of different size of conveyor shower system.
Repairing of roof of swinging feeder
Fabrication of bearing cover of redactor of electric pusher/Rest wall roller system.
Greasing of gear coupling between motor to Redactor or Redactor to drum of different conveyor/Belt Feeder /RWT
Replacement of counter weight ceiling of Inhaul/ outhaul system.
Top-up of oil of RG Box of conveyor/Belt Feeder/RWT/Swinging feeder/ Electric winch trolley.
Strengthening of any transfer hopper by providing supports between hopper and conveyor structure along with side plates
Strengthening of motor foundation/ RG Box foundation of any conveyor system/ RWT
Replacement of any damaged ceiling of tension trolley of any conveyor -
Fabrication of motor/ RG Box foundation of any conveyor system/ RWT
Replacement of any channel along with its support up to 5 meter of any conveyor system.
Fabrication and erection of grating of conveyor 3A/3B
Replacement of pinion of swinging feeder/ electric winch trolley
General Cleaning (Unit is Running Condition/ under Forced shut-down ) as per scope of work
Schedule of Quantities & Rates for COAL CRUSHER (in sub part: 3.01 - 3.45)
Removal of old & worn-out hammer set of Russian crusher after opening the crusher body.
Fitting of new hammer set after weighing them.
Balancing of old &used hammer set by re-moralizing & cutting.
Fitting of old & used balanced set of hammer by reversal of direction of complete hammer set.
Taking out of damaged rotor assembly.
Fabrication of old rear /front side grating from 20/40mm.
Replacement of 20mm /40mm thick rear side grating.
Replacement of 20mm /40mm thick front side grating.
Removal of rear half body of crusher after cutting pieces of the top hopper.
Removal of front half body of crusher after cutting pieces of top hopper
Refitting of rear half body of crusher & fitting of removed pieces on top hopper.
Refitting of front half body of crusher & fitting of removed pieces on top hopper
Replacement of crusher beam liner.
Fabrication of square plate.
Replacement of square plate
Fabrication & replacement of complete crusher body liner.
Fabrication of bypass damper.
Replacement of bypass damper.
Fabrication of crusher by pass grating.
Replacement of crusher by pass grating.
Fabrication & replacement of any one liner of crusher body.
Repairing of moving trolley having 3 no front gratings.
Repairing of rear side stationery grating, Frames.
Fitting of repaired rotor assembly.
Removal of damaged / useable rotor bearing no.3656/22356.
Fitting of new /useable rotor bearing no.3656/22356.
Removal of coupling of crusher rotor.
Removal of coupling of motor rotor.
Fitting of coupling of crusher rotor.
Fitting of coupling of motor rotor.
Removal of rotor of motor.
Fitting of rotor of motor.
Static balancing of crusher rotor.
Shifting of crusher motor stator from crusher house to turbine hall.
Shifting of crusher stator from turbine hall to crusher house.
Shifting of crusher rotor from crusher house to turbine hall.
Shifting of crusher rotor from turbine hall to crusher house.
Repairing of crusher half body ( rear /front ) by 25mm/32mm thick ms plate.
Greasing of bearings of crusher rotor.
Removal of chocking of crusher from coal.
Tightening of 22nos foundation bolts of crusher.
Hard facing in the working surfaces of coal crusher hammers (69nos) by welding process.
Alignment of crusher rotor with motor rotor.
Remetalizing of Coal Crusher Hammers (69 Nos.) by welding process
Matching of white metal bearing of motor rotor
Schedule of Quantities & Rates for RUSSIAN W/T (in sub part: 4.01 - 4.12)
Repairing / replacement of vertical shock absorbers.
Strengthening of flanges of pipe bracing at non-driving end.
Repairing / Overhauling of guide rollers.
Strengthening of cradle beam.
Strengthening of bottom beams of platform.
Rubber lining on Rest walls.
Replacement of worn out plate form rails.
Fabrication & erection of hopper of belt feeder.
Repairing / overhauling of stop rollers of Russian wagon tippler.
Checking / tightening & replacement of bolts provide for fixing the spur gear at both the sides of tippler.
Alignment of pinion to spur gear & gear box.
Repairing/ replacement of pinion shaft/ pinion gear
Schedule of Quantities & Rates for Conveyor Belt (in sub part: 5.01 - 5.14)
Cutting, splicing, cleaning of both sides of conveyor belt to be jointed together and vulcanizing of joint by Cold process size 1000mm wide conveyor belt.
Cutting, splicing, cleaning of both sides of conveyor belt to be jointed together and vulcanizing of joint by Cold process size 1200mm wide belt.
Cutting, splicing, cleaning of both sides of conveyor belt to be jointed together and vulcanizing of joint by Cold process size1400mm wide belt.
Removal of Old damaged/partly useable and laying of new/reusable belt.
Dragging of belt on Conveyor Super-structure.
Fastener Jointing on belt.
Shifting of Conveyor belt from ‘0’M to + 30M at conveyor 5A/5B.
Repairing of torn out belt by stitching with G.I. wire.
Repairing the damaged fastener joint by stitching with G.I. wire - Upto half Joint length.
Repairing the damaged fastener joint by stitching with G.I. wire - More than half joint length.
Refixing of side skirt rubber which comes out from its place(one side)
Removal of old/damaged side skirt rubber, fabrication of new side rubber and fixing it on its place.
Dismantling and refitting of discharge hoppers of wagon tippler (above belt feeders) for replacement/re-jointing of conveyor belt of belt feeder.
Patch work of repairing of small cuts of 10x100Cm size by fixing rubber with cold solution by preparing the surface properly.
Schedule of Quantities & Rates for chute maintenance (in sub part: 6.01 - 6.10)
Fabrication and replacement of complete mother plate 10/12 mm of any hopper of conveyor system. Size of hopper 850 to 1200 mm width and 4 to 5meter height.
Fabrication and replacement of complete liner plate 8/10 mm of any hopper of conveyor system. Size of hopper 850 to 1200 mm width and 4 to 5 meter height.
Fabrication and replacement of complete single plate 10/12 mm of hopper of any transfer point. Size of hopper 850 to 1200 mm width and 4 to 5 meter height
Repairing of any hopper by patch work with following size MS plate Up to 300x300 mm.
Repairing of any hopper by patch work with following size MS plate Up to 400x400 mm.
Repairing of any hopper by patch work with following size MS plate Up to 600x600 mm.
Repairing of any hopper by patch work with following size MS plate Up to 850x400 mm.
Repairing of any hopper by patch work with following size MS plate Up to 850x600 mm
Fabrication and replacement of supporting structure of any conveyor.
Strengthening of overhead conveyors by use of plates, angles, channels and joints.
Schedule of Quantities & Rates for Repairing and greasing of conveyors rollers & drums (in sub part: 7.01 - 7.25)
Servicing of Steel rollers of 1200 mm conveyor
Servicing of Steel rollers of 1400 mm conveyor
Servicing of Steel rollers of 1000 mm conveyor
Servicing of Rubberized roller 1200 mm conveyor
Servicing of Rubberized roller 1400 mm conveyor
Servicing of Rubberized roller 1000 mm conveyor
Servicing of Return roller 1200 mm conveyor
Servicing of Return roller 1400 mm conveyor
Servicing of Return roller 1000 mm conveyor
Greasing/Servicing of Bearing of drive drum of 1400 mm conveyor
Greasing/Servicing of Bearing of drive drum of 1200 mm conveyor
Greasing/Servicing of Bearing of drive drum of 1000 mm conveyor
Greasing/Servicing of Bearing of driven drum of 1400 mm conveyor
Greasing/Servicing of Bearing of driven drum of 1200 mm conveyor
Greasing/Servicing of Bearing of driven drum of 1000 mm conveyor
Greasing/Servicing of Bearing of snub drum of 1400 mm conveyor
Greasing/Servicing of Bearing of snub drum of 1200 mm conveyor
Greasing/Servicing of Bearing of snub drum of 1000 mm conveyor
Greasing/Servicing of Bearing of counterweight pulley of 1400 mm conveyor.
Greasing/Servicing of Bearing of counterweight pulley of 1200 mm conveyor.
Greasing/Servicing of Bearing of counterweight pulley of 1000 mm conveyor.
Servicing/Greasing of guide rollers of Winch trolley of conveyor K-5A&5B.
Repairing idler frame of any conveyor.
Decantation of LDO/LSHS from BTPN rakes by making connection for unloading and making disconnection after unloading.
Decantation of LDO/LSHS from Road Tankers by making connection for unloading and making disconnection after unloading.
Schedule of Quantities & Rates for Repairing &maint. of FO/LDO/LSHS system (in sub part: 8.01 - 8.12)
Cleaning of FO/LDO/LSHS storage tanks of 1000 KL capacity
Cleaning of FO/LDO/LSHS storage tanks of 500 KL capacity.
Cleaning of settling tanks of 100 KL Capacity
Cleaning of underground pits.
Overhauling of Rotary Pump- Capacity 200Kl/hr. Motor capacity 55 KW.
Overhauling of Russian Pump- Capacity 150 Kl/hr. Motor capacity 50 KW.
Overhauling of Gear Pump- Capacity 75 Kl/hr. Motor capacity 37 KW.
Complete overhauling of secondary oil pumps-Drainage Pump- Capacity 5KW.
Complete overhauling of secondary oil pumps-Channel Pump Capacity up to 5 KW. / de-watering pump Capacity up to 15 KW.
Cleaning of all oil Filters of Rotary/Russian Pump
Cleaning of all oil Filters of Gear Pump
Repairing of Steam/oil Valves of Different Sizes
Attending lighting complaints and assistance in electrical Maintenance of 6.6 KV/ 0.4KV switch gear and motors in shift as per scope of work. Time of Shift [20:00 Hrs to 06:00 Hrs. (02 Hrs Rest)]
Star O and M Group (BID ID -5474482)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .