Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 108 BADA CHAKA NAINI ALLAHABAD | ALLAHABAD | PRAYAGRAJ | UTTAR PRADESH | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
27 Oct 2023, 5:00 pmClosed
EE(HQ)
JALKAL VIBHAG BHELUPUR, VARANASI
Repairing of pipeline leakage of different size and types.
2023_NNVAR_844741_4
718/II/JKNN DATED-29/09/2023
Open Tender
Water Supply
Percentage
365 days
VARANASI CITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
GM JALKAL
₹25,000
30 Nov 2023
18 Oct 2023
27 Oct 2023
18 Oct 2023
27 Oct 2023
18 Oct 2023
Repairing of 90mm(3") pipe line in ordinary road.
Repairing the leakage of 90mm(3") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 90mm(3") pipe line in ordinary road.
Repairing of leakage pipe line 15mm in 90mm(3”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 90mm(3") pipe line in stone/interlocking road.
Repairing the leakage of 90mm(3") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 90mm(3") pipe line in stone/inerlocking road.
Repairing of leakage pipe line 15mm in 90mm(3”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 90mm(3") pipe line in bituminous road.
Repairing the leakage of 90mm(3") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) GSB in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 90mm(3") pipe line in bituminous road.
Repairing of leakage pipe line 15mm in 90mm(3”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) GSB in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 110mm(4") pipe line in ordinary road.
Repairing the leakage of 110mm(4") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 110mm(4") pipe line in ordinary road.
Repairing of leakage pipe line 15mm in 110mm(4”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 110mm(4") pipe line in stone/interlocking road.
Repairing the leakage of 110mm(4") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 110mm(4") pipe line in stone/inerlocking road.
Repairing of leakage pipe line 15mm in 110mm(4”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 110mm(4") pipe line in bituminous road.
Repairing the leakage of 110mm(4") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 110mm(4") pipe line in bituminous road.
Repairing of leakage pipe line 15mm in 110mm(4”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) GSB in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 140mm(5") pipe line in ordinary road.
Repairing the leakage of 140mm(5") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) GSB in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 140mm(5") pipe line in ordinary road.
Repairing of leakage pipe line 15mm in 140mm(5”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 140mm(5") pipe line in stone/interlocking road.
Repairing the leakage of 140mm(5") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 140mm(5") pipe line in stone/inerlocking road.
Repairing of leakage pipe line 15mm in 140mm(5”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 140mm(5") pipe line in bituminous road.
Repairing the leakage of 140mm(5") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) GSB in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 140mm(5") pipe line in bituminous road.
Repairing of leakage pipe line 15mm in 140mm(5”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) GSB in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 160mm(6") pipe line in ordinary road.
Repairing the leakage of 160mm(6") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 160mm(6") pipe line in ordinary road.
Repairing of leakage pipe line 15mm in 160mm(6”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 160mm(6") pipe line in stone/interlocking road.
Repairing the leakage of 160mm(6") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 160mm(6") pipe line in stone/inerlocking road.
Repairing of leakage pipe line 15mm in 160mm(6”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 160mm(6") pipe line in bituminous road.
Repairing the leakage of 160mm(6") pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & CID jointing of pipe, Sand filling(0.45cum) GSB in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
Repairing of 15mm service connection in 160mm(6") pipe line in bituminous road.
Repairing of leakage pipe line 15mm in 160mm(6”) pipe line by excavation of earth mixed with kanker, morum, sand in soil. Dismantling the existing pipe and bailing out water to keep trenches dry during the repair of leakages, cutting and removal of Pipe if required and laying & jointing of pipe, Sand filling(0.45cum) GSB in plinth Including supply of necessary quantity of sand with watering, ramming & dressing etc. refilling back the pipe line trenches properly. Including testing of pipe line, supply of all labor, material T&P etc. required for proper completion of work.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .