Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.4 CrAccepted-AOC PLOT NO 01 SUKHDHAM RESIDENCY VILLAGE SINGHPUR KACCHAR PARGANA TEHSIL KALYANPUR KANPUR KANPUR NAGAR UTTAR PRADESH 208017 UDYAM UP 43 0012599 09AABCI9254Q1ZS R M MII STATUS AS VERIFIED | KANPUR NAGAR | UTTAR PRADESH | 208017 | ₹32.4 Cr | L1 | Accepted-AOC Lowest price |
| 2 | L2₹46.4 CrRejected-Finance ASTRA TOWERS SURVEY NO 12 P KOTHAGUDA POST HI TECH CITY HYDERABAD TELANGANA 560084 | BENGALURU URBAN | KARNATAKA | 560084 | ₹46.4 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical DOES NOT MEET QUALIFICATIONS CRITERIA |
Tender Value
Refer Docs
EMD Value
₹25 L
Closing Date
14 Nov 2022, 3:00 pmClosed
Director, Disaster Management
Tamil Nadu Disaster Risk Reduction Agency, Chepauk, Chennai 600 005
Supply, Installation, Testing, Commissioning and Maintenance of 1400 Automatic Rain Gauge Stations and 100 Automatic Weather Stations at selected locations in Tamil Nadu.
2022_TNDRR_253501_1
TNDRRA / ARG-AWS / 2022-23/ 01
Open Tender
Electronics Equipment
180 days
All over Tamilnadu
As per Tender Document
5 documents required · 5 mandatory
₹0
₹25 L
Chennai
19 Jun 2023
30 Sept 2022
14 Nov 2022
30 Sept 2022
14 Nov 2022
19 Oct 2022
30 Sept 2022 - 14 Oct 2022
17 Oct 2022
Amount
Automatic Rain Gauge (ARG)
Automated Rainfall Gauge (ARG) Sensor Equipment set necessary hardware as per technical specifications.
Data Logger with 2 AI channels with GSM & GPRS based telemetry including antenna and all necessary equipment for data transmission as per technical specifications.
Data Logger with 2 AI channels with GSM & GPRS and L Band Satellite based telemetry including antenna and all necessary equipment for data transmission as per technical specifications.
Solar panel with all connectors, cables and conduit as per technical specifications
Battery, charger regulator with all interconnecting connectors, cables for DCP as per technical specifications
NEMA4X OR Equivalent Enclosure box to suit master unit equipment with locking, other ancillary equipment, fittings earthling, lightening arrestor with all connectors, cables and conduit for cables, mast to mount DCP, sensor mount complete as per technical specifications
Automated Weather station (AWS)
Automated Rainfall Stations (ARS) Sensor Equipment set necessary hardware as per technical specifications.
Air Temperature & Relative Humidity sensor, cable with Radiation shield, Equipment set necessary hardware as per technical specifications
Wind speed & wind direction sensor and cable set necessary hardware as per technical specifications
Atmospheric Pressure sensor and cable set necessary hardware as per technical specifications
Solar Radiation sensor and cable set necessary hardware as per technical specifications
Soil Moisture and Temperature set necessary hardware as per technical specifications
Data Logger with 8 AI channels with GSM & GPRS based telemetry including antenna and all necessary equipment for data transmission as per technical specifications.
Solar panel with all connectors, cables and conduit as per technical specifications.
Battery, charger regulator with all interconnecting connectors, cables for DCP as per technical specifications
NEMA4X OR Equivalent Enclosure box to suit master unit equipment with locking, other ancillary equipment, fittings earthling, lightening arrestor with all connectors, cables and conduit for cables, 10mts tower with guy rope to mount DCP, sensor mount complete as per technical specifications
Related Services for ARG
Installation testing & Commissioning of Automatic Rain Gauge (ARG) Sensor Equipment set necessary hardware, Data Logger , Solar Panel, Battery and NEMA4X as per technical specifications.
Related Services for AWS
Installation testing & Commissioning of Automated Weather Stations (AWS) All Sensor Equipment set necessary hardware, Data Logger , Solar Panel, Battery and NEMA4X as per technical specifications.
Comprehensive Annual Maintenance Charges for ARG (1400 Nos.)
Annual Comprehensive Maintenance Charges of ARG for a period of 1st year after warranty period
Annual Comprehensive Maintenance Charges of ARG for a period of 2nd year after warranty period
Annual Comprehensive Maintenance Charges of ARG for a period of 3rd year after warranty period
Annual Comprehensive Maintenance Charges of ARG for a period of 4th year after warranty period
Annual Comprehensive Maintenance Charges of ARG for a period of 5th year after warranty period
Comprehensive Annual Maintenance Charges for AWS (100 Nos.)
Annual Comprehensive Maintenance Charges of AWS for a period of 1st year after warranty period
Annual Comprehensive Maintenance Charges of AWS for a period of 2nd year after warranty period
Annual Comprehensive Maintenance Charges of AWS for a period of 3rd year after warranty period
Annual Comprehensive Maintenance Charges of AWS for a period of 4th year after warranty period
Annual Comprehensive Maintenance Charges of AWS for a period of 5th year after warranty period
Astra Microwave Products Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid