Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC AYYALUR PANCHAYAT PERAMBALUR | PERAMBALUR | TAMIL NADU | 621101 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹17.5 L+₹48,353.07 (2.85%)Rejected-Finance PASUMALAITHANGAL GINGEE VILUPPURAM | L2 | Rejected-Finance Above Bid Amount |
| Sl No | Description | Qty | Unit | R SELVARAJ L2 | Ramalingam S L1 |
|---|---|---|---|---|---|
| 1.00 | Part - I:- Maintenance to the Road From Ammapalayam to Moolakkadu Road KM 0/000 - 5/000 (R - 55)
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal including all charges etc., complete. KM 0/0 - 1/0 | 29.85 | Cum | 4,125 ₹1,23,131.25 | 4,022 ₹1,20,056.7 Lowest |
| 1.01 | KM 1/0 - 2/0 | 21.27 | Cum | 4,125 ₹87,738.75 | 4,032 ₹85,760.64 Lowest |
| 1.02 | KM 2/0 - 3/0 | 8.14 | Cum | 4,125 ₹33,577.5 | 4,041 ₹32,893.74 Lowest |
| 1.03 | KM 3/0 - 4/0 | 5.54 | Cum | 4,125 ₹22,852.5 | 4,050 ₹22,437 Lowest |
| 2.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete. KM 0/0 - 5/0 | 1,295.78 | Sqm | 40 ₹51,831.2 | 34 ₹44,056.52 Lowest |
| 3.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. KM 0/0 - 1/0 | 596.95 | Sqm | 300 ₹1,79,085 | 296 ₹1,76,697.2 Lowest |
| 3.01 | KM 1/0 - 2/0 | 425.33 | Sqm | 300 ₹1,27,599 | 297 ₹1,26,323.01 Lowest |
| 3.02 | KM 2/0 - 3/0 | 162.75 | Sqm | 300 ₹48,825 | 297 ₹48,336.75 Lowest |
| 3.03 | KM 3/0 - 4/0 | 110.75 | Sqm | 300 ₹33,225 | 297 ₹32,892.75 Lowest |
| 4.00 | Provision For Name Board Charges | 1 | Nos | 1,125 ₹1,125 | 1,000 ₹1,000 Lowest |
Tender Value
₹17.2 L
EMD Value
₹17,170
Closing Date
28 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPMENT OFFICER (BP) PERAMBALUR
BLOCK DEVELOPMENT OFFICE PERAMBALUR
Maintenance to the Roads at Ammapalayam, Bommanapadi, Ladapuram AND Vadakkumathavi Panchayat 6 Works in Perambalur Block of Perambalur District under RRMS 2025 26 Package No TN 11 02
2025_RDTN_616028_1
Proc.No 3042/2025/A3 Date 19.10.2025
Open Tender
Civil Works
Item Rate
180 days
BLOCK DEVELOPMENT OFFICE PERAMBALUR
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹0
₹17,170
Yes
11 Dec 2025
22 Oct 2025
28 Oct 2025
22 Oct 2025
28 Oct 2025
22 Oct 2025
Amount
Part - I:- Maintenance to the Road From Ammapalayam to Moolakkadu Road KM 0/000 - 5/000 (R - 55) Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal including all charges etc., complete. KM 0/0 - 1/0
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete. KM 0/0 - 5/0
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. KM 0/0 - 1/0
Provision For Name Board Charges
Part - II:- Maintenance to the Road From Bommanapadi - Thanneerpanthal - Chettikulam Road KM 0/000 - 1/520 (R - 60) Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal including all charges etc., complete. KM 0/0 - 1/0
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete. KM 0/0 - 1/520
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. KM 0/0 - 1/0
Provision For Name Board Charges
Part - III:- Maintenance to the Road From Somandaputhur to MGR Nagar Road KM 0/000 - 1/000 (R - 65) Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal including all charges etc., complete. KM 0/0 - 1/0
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete. KM 0/0 - 1/0
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. KM 0/0 - 1/0
Provision For Name Board Charges
Part - IV:- Maintenance to the Road From Ladapuram to Kurumbalur Road KM 0/000 - 2/600 (R - 69) Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal including all charges etc., complete. KM 0/0 - 1/0
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete. KM 0/0 - 2/600
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. KM 0/0 - 1/0
Provision For Name Board Charges
Part - V:- Maintenance to the Road From Somandaputhur MGR Nagar to Naval Maram Road KM 0/000 - 1/000 (R - 109) Advance patch work for making up the undulation in the existing B.T surface to an average thickness of 25mm using 13.20mm IRC size HBG metal including all charges etc., complete. KM 0/0 - 1/0
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete. KM 0/0 - 1/0
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. KM 0/0 - 1/0
Provision For Name Board Charges
Part - VI:- Maintenance to the Road From Vadakkumathavi to A.Kudikadu Road KM 0/000 - 1/000 (R - 126) Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal including all charges etc., complete. KM 0/0 - 1/0
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,complete. KM 0/0 - 1/0
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. KM 0/0 - 1/0
Provision For Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R SELVARAJ (BID ID -1496684)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_736078.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
EMD.pdf
Additional Documents • 0.14 MB
PART1.pdf
Tender Documents • 0.91 MB
BOQ_736078.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .