Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 2 1433 D 6 KAMAL COLONY SAHARANPUR UP PIN 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | ₹1.2 Cr | L1 | Accepted-AOC Found 1st Lowest |
| 2 | L2₹1.5 Cr+₹25.1 L (20.7%)Rejected-AOC | ₹1.5 Cr+₹25.1 L (20.7%) | L2 | Rejected-AOC Found 2nd Higher |
| 3 | L3₹1.5 Cr+₹27.3 L (22.5%)Rejected-AOC 07 KADAURA KADAURA NEAR MAIN MARKET JALAUN UTTAR PRADESH 285203 | JALAUN | UTTAR PRADESH | 285203 | ₹1.5 Cr+₹27.3 L (22.5%) | L3 | Rejected-AOC Found 3rd Highest |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
4 Dec 2023, 1:00 pmClosed
SUPERINTENDING ENGINEER, EDC, BANDA
Chilla Road, Indira Nagar, Banda
Electrification of Tulsi Nagar Housing Scheme-2 by shifting and erection of 33 KV, 11 KV HT/LT Lines and installation of 400 KVA DT under Full Deposit Scheme 2023-24 under EUDD, Banda
2023_DVVNL_864440_1
EDCBNDA-52/2023-24
Open Tender
Electrical Works
Turn-key
60 days
BANDA
As per annexured
2 documents required · 2 mandatory
₹5,900
DVVNL
₹1.2 L
O/O SE, EDC, BANDA
23 Mar 2024
23 Nov 2023
4 Dec 2023
23 Nov 2023
4 Dec 2023
23 Nov 2023
1 Dec 2023
The work of electrification of Tulsi Nagar Housing Scheme Part-2, by shifting of 33 KV Baberu and Kamasin Line, construction of HT/LT Lines for independent feeder & installation of 05 Nos. 400 KVA Distribution Transformers feeded from 33/11 KV Sub-Station, Tulsi Nagar (Banda) UNDER FULL DEPOSIT SCHEME YEAR 2023-24 under EUDD, BANDA (Turn-key Basis), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement, details of the work as given below :-
ST SP-70 Pole 13.0 Mtr. Long
Stone Pad
33 KV V-Type Steel X-arm
11 KV V-Type Steel X-arm
Cross-arm holding clamp with N & B
F-Bracket for 33 KV
F-Bracket for 11 KV
GI T-Off Channel
Top Channel 125x65x6 mm, 3200 mm (10.7 Kg/M) with Clamp
Dropper Channel with Holding Clamps, N&B with washers (Galavanized)
GI Angle Iron 65x65x6 mm (Bracing with 4 Clamps)
GI Angle Iron 125x65x6 mm 3200 mm for Base Arrangement
GI Angle 65x65x6 mm 1 M Long for LT Busbar
33 KV Polymer Disc Insulator 70 KN
Disc Fitting for Dog Conductor
33 KV Composite Polymer Pin Insulator with pin
11 KV Composite Polymer Pin Insulator with pin
Number Plate with clamp & Nut/Bolt
Danger Board with clamp & Nut/Bolt
PG Clamp for Dog to Dog Conductor
Stay Complete (GI Stay rod 20x1800 mm, Stay wire 7/8 SWG 10 Kg., Stay clamp, Bolt-Nut & Washer with Grounting) for ST Pole.
Stay Complete (GI Stay rod 20x1800 mm, Stay wire 7/8 SWG 5 Kg., Stay clamp, Bolt-Nut & Washer with Grounting) for PCC Pole.
GI barbed Wire
Nut, Bolt & Washer of suitable sizes
Earthing Rod Complete
Gaurding Angle with Clamp & nut-bolt for guarding of 33 KV Line
Gaurding Angle with Clamp & nut-bolt for guarding of 11 KV Line
GI Wire 6 SWG & 10 SWG
ACSR Dog Conductor for 11 KV Line
Jointing Sleeves for ACSR Dog Conductor
Alluminium Paint
Red Oxide Paint
LT PVC armoured Cable Al. 1x400 Sq.mm.
LT armoured Cable Al. 1x250 Sq.mm.
Al. Lugs Long Barrel off size
4 Core LT MCB with Box
11 KV TPMO
11 KV Fuse Set
Holding Clamp for TPMO, Top Channel, Fuse set etc.
400 KVA T/F Copper Wound
LT Clamp with N & B
LT Shackle Insulator with Nut-Bolts.
PCC Pole 8.5 Mtr. Long
Eye Hook Insulated with bolt.
Suspension Clamp Insulated
Dead End Clamp with I Bolt for ABC
LT Distribution Box 3-Phase
LT D.B. mounting Clamp 3 Phase
ABC Cable (3x95+1x70+1x16 Sq.mm.)
ABC Cable (3x50+1x35+1x16 Sq.mm.)
Piercing Connector
Concreting/Grouting of erected 8.5/11 Mtr. long PCC/STP Poles with muffing as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. (arrangement of grouting material by firm).
Erection of ABC Cable Composite Line on 13 Mtr. ST Pole 4 Circuit (3 for Phase 1 for Nutral) with laying, stringing, binding and sagging etc.as per direction of supervising engineer/RESSPO manual.
Shifting of 33 KV Dog Conductor from existing 33 KV Line to newly erected 13 Mtr. ST Pole with all fittings and accessories.
CIVIL WORK
Soil Filling in Switch Yard upto 1.5 Feet
RCC/Bricks Trench for existing 11 KV Cable and control cable
Turfing and interlocking cement Bricks in Complete Switchyard
Making of Gate in Switchgear for Additional 5 MVA TF
Tree Branches Cutting & Chopping as per requirement
M/S MAA VISHARI DEVI ENTERPRISES
AKSHITA CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .