| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-AOC | ₹18.7 L | L1 | Accepted-AOC ok |
| 2 | Rejected-Technical | - | - | Rejected-Technical l2 |
| Sl No | Description | Qty | Unit | PRABAHARAN R L1 | S ANBALAGAN L2 |
|---|---|---|---|---|---|
| 1.00PROVIDING CEMENT CONCRETE ROAD AT K.PETHANENDAL VILLAGE AND PANCHAYAT | |||||
| 2.00 | Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation | 32.58 | M3 | 263.5 ₹8,584.83 Lowest | 265 ₹8,633.7 |
| 3.00 | Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 73.82 | M3 | 5,894 ₹4,35,095.08 Lowest | 5,896 ₹4,35,242.72 |
| 4.00 | Centering, shuttering and strutting to the soffits of R.C.C slabs and beams including cost and conveyance of all materials to site etc., complete. | 325.8 | M2 | 547.5 ₹1,78,375.5 Lowest | 548 ₹1,78,538.4 |
| 5.00 | Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 37.47 | M3 | 6,648.5 ₹2,49,119.3 Lowest | 6,650 ₹2,49,175.5 |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 98.94 | M3 | 7,195.5 ₹7,11,922.77 Lowest | 7,200 ₹7,12,368 |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 2,84,957.55 ₹2,84,957.55 Lowest | 2,85,112.5 ₹2,85,112.5 |
Tender Value
₹18.9 L
EMD Value
₹18,942
Closing Date
25 Feb 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(V.PT)
BLOCK DEVELOPMENT OFFICER(V.PT),PANCHAYAT UNION THIRUPPUVANAM
PROVIDING CEMENT CONCRETE ROAD AT K.PETHANENDAL VILLAGE AND PANCHAYAT
2026_RDTN_657607_1
2025-56 14th CFC-CC Road K.Pethanendal
Open Tender
Civil Works
Item Rate
90 days
PANCHAYAT UNION THIRUPPUVANAM
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹18,942
Yes
14 Aug 2026
14 Feb 2026
25 Feb 2026
14 Feb 2026
25 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PROVIDING CEMENT CONCRETE ROAD AT K.PETHANENDAL VILLAGE AND PANCHAYAT | - | - | - | - |
| 2 | Earth work excavating and depositing on bank with an initial lead of 10M and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth shale's, murrams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20B for foundation | 32.58 | M3 | - | - |
| 3 | Cement concrete 1:4:8 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 73.82 | M3 | - | - |
| 4 | Centering, shuttering and strutting to the soffits of R.C.C slabs and beams including cost and conveyance of all materials to site etc., complete. | 325.8 | M2 | - | - |
| 5 | Cement concrete 1:3:6 using 40mm HBGS jelly including all incidental charges such as bailing out water finishing curing complete complying with standard specification | 37.47 | M3 | - | - |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 98.94 | M3 | - | - |
| 7 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_788792.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_788792.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].