Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹49.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹49.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹49.2 LAdmitted-Fee/PreQual/Technical/Finance GUDVELA | -0.10% | ₹49.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹49.2 LAdmitted-Fee/PreQual/Technical/Finance AGALPUR BLOCK IN THE DISTRICT OF BALANGIR | -0.10% | ₹49.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹49.2 LAdmitted-Fee/PreQual/Technical/Finance AT TULUSINAGAR PO PS BALANGIRI DIST BALANGIRI PIN 767001 | BALANGIR | ODISHA | 767001 | -0.10% | ₹49.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹49.2 LAdmitted-Fee/PreQual/Technical/Finance | -0.10% | ₹49.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹49.3 L
EMD Value
₹49,300
Closing Date
20 Jul 2026, 5:00 pmClosed
S.E,Balangir (R and B) Division,Balangir
O/O S.E,Balangir (R and B) Division,Balangir
Building Work
2026_EICCL_135309_1
BGRRandB/04/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Balangir
2 documents required · 2 mandatory
₹6,000
₹49,300
Yes
10 Sept 2026
10 Jul 2026
21 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
10 Jul 2026 - 17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick or stone masonry in lime or cement mortar under 3mtr height including stacking the useful materials for reuse and removing the debris within 50m lead. Per 1 cum | 1 | cum | 1,646.62 | ₹1,646.62 |
| 2 | Earth work in excavation of foundation teachers/in all kinds of soil including moorum, stoney earth and earth mixed with boulder except sheet rocks and boulders requiring blasting including dressing and leveling the bed up to the required depth & depositing the excavated materials away from the work site with all leads & lefts top shorting & strutting if required etc. complete as directed by the Engineer-in-charge. | 177.63 | cum | 282.9 | ₹50,251.53 |
| 3 | Supplying and filling in foundation and plinth with sand including watering, ramming cost, conveyance & taxes materials & cost of labour with T&P required for the works etc. complete. (measurement will be taken on finished completed section only) | 238.98 | cum | 686.1 | ₹1,63,964.18 |
| 4 | Cement concrete (M-15) with 40 mm size C.B. Metal of approved quality as per approved drawing and direction of the Engineer-in-charge including cost, conveyance, royality taxes of all materials conforming to the MORTH techanical specification. | 49.75 | cum | 5,042.4 | ₹2,50,859.4 |
| 5 | Fly ash Brickwork with in cement mortar (1:6) in Foundation and Plinth (23cm x 11cm x 8 cm) having minimum crushing strength not less than 75 kg.per.sq.cm. including splays cutting, circular moulding, chamfering, corbelling and similar such type of woks with all necessary projections. Watering and curing for 7 days and immersing the bricks in water for six hours before use etc. complete including cost and conveyance of all materials, labour with T&P required for the work with all taxes and royalties etc. complete in all respect as per direction of Engineer in charge. | 57.88 | cum | 5,536.65 | ₹3,20,461.3 |
| 6 | Fly ash brick masonry in cement mortar (1:6) in superstructure using of (23cm x 11cm x 8 cm) size having minimum crushing strength not less than 75 kg.per.sq.cm. including splays cutting, circular moulding, chamfering, corbelling and similar such type of woks with all necessary projections. Watering and curing for 7 days and immersing the bricks in water for six hours before use etc. complete including cost and conveyance of all materials, labour with T&P required for the work with all taxes and royalties etc. complete in all respect as per direction of Engineer in charge. Ground Floor | 52.63 | cum | 5,574.99 | ₹2,93,411.72 |
| 7 | First Floor | 15.13 | cum | 5,960.96 | ₹90,189.32 |
| 8 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete as per the direction of Engineer-in-charge. Column Footing | 28.7 | cum | 6,086.78 | ₹1,74,690.59 |
| 9 | Column Super Structure | 11.2 | cum | 17,909.03 | ₹2,00,581.14 |
| 10 | Plinth Beam | 10.08 | cum | 6,961.18 | ₹70,168.69 |
stage.html
html • 0.08 MB
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.30 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.61 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_600892.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .