| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹73,441+₹6,740 (7.66%)Accepted-AOC | L2 | Accepted-AOC Tender Accepted | |
| 2 | L1₹88,015Rejected-AOC | L1 | Rejected-AOC Tender Not Accepted |
Tender Value
Refer Docs
Closing Date
18 Jul 2024, 2:00 pmClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES EM II Annual maintenance of HT LT switchgears HT LT Breakers Modules Busbars and Isolators during the Overhauling Period of 2024 25 at Ash Handling Plant Stage I
2024_EB_459655_1
CE/SE/ES /TTPS /No.175/2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
Yes
6 Sept 2024
3 Jul 2024
19 Jul 2024
3 Jul 2024
18 Jul 2024
3 Jul 2024
Overhauling of 6.6 KV HT Panel 1)Charges for releasing the back doors (top and bottom),Bus separator, racking out of HT Breakers/Bus VT and cleaning of all the released doors and checking of IR value of Bus. 2)Charges for complete cleaning of Horizontal, vertical busbars Panels and supporting insulators with the help of air blower and Acetone , tightness checking of Horizontal, vertical bus-bars and outgoing power cable terminals. 3)Charges for re-fixing of back doors(top and bottom) by providing all bolts and nuts racking in the HT breaker and checking of IR value and satisfactory commissioning.
Overhauling of 6.6 KV HT breakers : Overhauling of H.T. Breakers mechanism. Cleaning and oil lubricating and Breaker wiring tightness checking. Breaker operation and Interlock arrangements checking.(6.6 KV, ABB Make SF6 gas breakers
Transporting of breakers to MRT test bench, preparation of breaker for contact resistance test and closing/opening time test, cleaning of contacts if required, transporting the tested breaker again to the panels.(6.6 KV ABB Make SF6 gas breakers )
Supply of Gada cloth for cleaning the HT buses, panels, breakers, bus PT, Cable end PT and Links.
Supply of Acetone
Supply of petroleum jelly
Supply of surf
Consumables(painting brush,various sizes
Overhauling of 415V LT Panel Releasing the Top covers and side covers of the bus chamber, checking IR value and releasing out all the modules.Cleaning the main (Horizontal) bus bars the vertical bus bars and its support insulators and checking the tightness of Busbar joints, cleaning the entire area and checking the tightness of out going cable.Re-fixing the top covers and side covers of the bus chambers, checking the IR value and satisfactory commissioning.
Overhauling of 415V LT Breaker Removal of LT Breakers from its chamber, cleaning the breaker, removing old grease, tightness checking grease lubricating, Applying acetone to power terminals, meggering checking the closing and tripping operation and put back the breaker again the original position
Overhauling of 415V LT Isolator Racking out the LT Isolators cleaning the isolator removing the old grease, tightness checking of all bolt and nuts applying new grease and lubricating applying acetone for power terminals putback the isolators in the original position after checking.
Overhauling of 415V LT Module Annual maintenance of LT modules Removal of modules, external cleaning and tightness checking of terminals, replacement of worn out parts, applying petroleum to finger contacts, greasing of modules and Meggering A) SE I type modules
B) SE II type modules
C) SE III type module
Consumables such as gada cloth, cotton waste, banian waste and cleaning agent WT.40
DURAI ENGINEERING WORKS (BID ID -1076395)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .