Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 CrAccepted-AOC FARIDPUR PACHKHORA BALLIA U P | BALLIA | BALLIA | UTTAR PRADESH | ₹3.5 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹3.6 Cr+₹6.5 L (1.85%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹3.6 Cr+₹6.5 L (1.85%) | 2 | Rejected-Finance L2 |
| 3 | 3₹3.6 Cr+₹10.6 L (3.04%)Rejected-Finance NAN | ₹3.6 Cr+₹10.6 L (3.04%) | 3 | Rejected-Finance L3 |
| 4 | 4₹3.7 Cr+₹16.8 L (4.82%)Rejected-Finance | ₹3.7 Cr+₹16.8 L (4.82%) | 4 | Rejected-Finance L4 |
| 5 | 5₹3.7 Cr+₹23.4 L (6.70%)Rejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.7 Cr+₹23.4 L (6.70%) | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/s Bajrang Construction & Suppliars L3 | BHAMAR SINGH L5 | SHIVAM ENTERPRISES L2 | Pratap Construction L1 | ARUN CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth Work in Mar,Ranker and kankar mixed soil in cuting internal section and sturructur foundation of canal including lead up to 30 m and lift up to 2.0 m with manual compaction and dressing. | 7,674.38 | M3 | 88.72 ₹6,80,870.99 | 70 ₹5,37,206.6 Lowest | 90.75 ₹6,96,449.99 | 90 ₹6,90,694.2 | 75 ₹5,75,578.5 |
| 2.00 | S/ laying of sand in foundation i/c all labour, material carriage from Earach Quarry and T&P etc. complete. | 434.41 | M3 | 2,436.65 ₹10,58,505.13 | 1,800 ₹7,81,938 | 1,963.5 ₹8,52,964.04 | 250 ₹1,08,602.5 Lowest | 1,800 ₹7,81,938 |
| 3.00 | S/L C.C. 1:3:6 with stone grit (20-40mm) size in foundation of wall i/c all cost of material carriage from Gora Machhiya Quarry, labour and T&P etc. | 317.41 | M3 | 5,059.14 ₹16,05,821.63 | 4,900 ₹15,55,309 | 4,376 ₹13,88,986.16 Lowest | 4,500 ₹14,28,345 | 5,500 ₹17,45,755 |
| 4.00 | C.C. M-15 (1:2:4) with stone grit in foundation of wall including all cost of material carriage from Gora Machhiya Quarry, labour and T&P etc complete. | 1,246.61 | M3 | 6,164.89 ₹76,85,213.52 | 6,400 ₹79,78,304 | 5,434 ₹67,74,078.74 | 4,900 ₹61,08,389 Lowest | 6,500 ₹81,02,965 |
| 5.00 | Centring and shuttering for R.C.C. work including all cost of material labour T&P complete required for propar completion of work. | 72.18 | M2 | 770.47 ₹55,612.52 | 500 ₹36,090 Lowest | 779 ₹56,228.22 | 500 ₹36,090 Lowest | 700 ₹50,526 |
| 6.00 | Reinforcement for R.C.C. work i/c cutting, bending,& binding& placing in position including cost of material, labour, T& P etc. | 1.5 | MT | 59,601.7 ₹89,402.55 Lowest | 78,000 ₹1,17,000 | 62,596 ₹93,894 | 70,000 ₹1,05,000 | 70,000 ₹1,05,000 |
| 7.00 | R.C.C. M-20 (1:1.5.3) cement concrete with stone ballast including all cost of material carriage from Gora Machhiya Quarry,labour and T&P etc complete. | 82.7 | M3 | 6,590.58 ₹5,45,040.97 | 6,800 ₹5,62,360 | 6,000 ₹4,96,200 | 5,500 ₹4,54,850 Lowest | 6,800 ₹5,62,360 |
| 8.00 | Brick work (M-150) with 1:4 cement mortor including all cost of material carriage from Bhognipur kiln as per SOR PWD CH1A/1a(i) labour T&P etc complete. | 4,183.66 | M3 | 4,892.66 ₹2,04,69,225.94 | 5,300 ₹2,21,73,398 | 4,988 ₹2,08,68,096.08 | 4,500 ₹1,88,26,470 Lowest | 5,100 ₹2,13,36,666 |
| 9.00 | Supply Laying ,Jointing,testing and commisionning the HDPE pipe in standard length confirming to I.S.7634 etc.including cost of transportation,fright charges ,inspection charges,loading ,unloading charges conveyance to departmental store/site stacking the same,sand cusion of 15 cm.thick all around the pipe etc.complete in all respect to the operational from as per direction of Engineer in charge.HDPE pipe 160 mm PE 100 pipe PN6,IS-4984 | 835.4 | RM | 982.93 ₹8,21,139.72 Lowest | 1,000 ₹8,35,400 | 1,005 ₹8,39,577 | 1,300 ₹10,86,020 | 1,000 ₹8,35,400 |
| 10.00 | Supply Laying ,Jointing,testing and commisionning the HDPE pipe in standard length confirming to I.S.7634 etc.including cost of transportation,fright charges ,inspection charges,loading ,unloading charges conveyance to departmental store/site stacking the same,sand cusion of 15 cm.thick all around the pipe etc.complete in all respect to the operational from as per direction of Engineer in charge.HDPE pipe 110 mm PE 100 pipe PN 4,IS-4984 | 240 | RM | 458.05 ₹1,09,932 | 700 ₹1,68,000 | 465 ₹1,11,600 | 1,100 ₹2,64,000 | 400 ₹96,000 Lowest |
Tender Value
₹4.4 Cr
EMD Value
₹8.8 L
Closing Date
7 Jul 2026, 3:00 pmClosed
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
LOT-05, Restoration of Shivni Canal System under Betwa Canal Division-I, Orai, District Jalaun
2026_UPIDC_1164587_5
02/SE-IV/2026-27
Open Tender
Civil Works
Item Wise
540 days
Orai
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
₹8.8 L
31 Aug 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
7 Jul 2026
30 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Mar,Ranker and kankar mixed soil in cuting internal section and sturructur foundation of canal including lead up to 30 m and lift up to 2.0 m with manual compaction and dressing. | 7,674.38 | M3 | 108.2 | ₹8,30,367.92 |
| 2 | S/ laying of sand in foundation i/c all labour, material carriage from Earach Quarry and T&P etc. complete. | 434.41 | M3 | 2,971.53 | ₹12,90,862.35 |
| 3 | S/L C.C. 1:3:6 with stone grit (20-40mm) size in foundation of wall i/c all cost of material carriage from Gora Machhiya Quarry, labour and T&P etc. | 317.41 | M3 | 6,169.69 | ₹19,58,321.3 |
| 4 | C.C. M-15 (1:2:4) with stone grit in foundation of wall including all cost of material carriage from Gora Machhiya Quarry, labour and T&P etc complete. | 1,246.61 | M3 | 7,518.16 | ₹93,72,213.44 |
| 5 | Centring and shuttering for R.C.C. work including all cost of material labour T&P complete required for propar completion of work. | 72.18 | M2 | 939.6 | ₹67,820.33 |
| 6 | Reinforcement for R.C.C. work i/c cutting, bending,& binding& placing in position including cost of material, labour, T& P etc. | 1.5 | MT | 72,685 | ₹1,09,027.5 |
| 7 | R.C.C. M-20 (1:1.5.3) cement concrete with stone ballast including all cost of material carriage from Gora Machhiya Quarry,labour and T&P etc complete. | 82.7 | M3 | 8,037.3 | ₹6,64,684.71 |
| 8 | Brick work (M-150) with 1:4 cement mortor including all cost of material carriage from Bhognipur kiln as per SOR PWD CH1A/1a(i) labour T&P etc complete. | 4,183.66 | M3 | 5,966.67 | ₹2,49,62,518.61 |
| 9 | Supply Laying ,Jointing,testing and commisionning the HDPE pipe in standard length confirming to I.S.7634 etc.including cost of transportation,fright charges ,inspection charges,loading ,unloading charges conveyance to departmental store/site stacking the same,sand cusion of 15 cm.thick all around the pipe etc.complete in all respect to the operational from as per direction of Engineer in charge.HDPE pipe 160 mm PE 100 pipe PN6,IS-4984 | 835.4 | RM | 1,198.7 | ₹10,01,393.98 |
| 10 | Supply Laying ,Jointing,testing and commisionning the HDPE pipe in standard length confirming to I.S.7634 etc.including cost of transportation,fright charges ,inspection charges,loading ,unloading charges conveyance to departmental store/site stacking the same,sand cusion of 15 cm.thick all around the pipe etc.complete in all respect to the operational from as per direction of Engineer in charge.HDPE pipe 110 mm PE 100 pipe PN 4,IS-4984 | 240 | RM | 558.6 | ₹1,34,064 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.24 MB
02SEIVNIT2026-27.pdf
Tender Documents • 2.78 MB
BOQ_2183890.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .