Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹1.2 L (0.58%)Admitted-Finance | ₹2.1 Cr+₹1.2 L (0.58%) | L2 | Admitted-Finance |
| 3 | L3₹2.1 Cr+₹6.1 L (2.97%)Admitted-Finance | ₹2.1 Cr+₹6.1 L (2.97%) | L3 | Admitted-Finance |
| 4 | L4₹2.3 Cr+₹27.6 L (13.3%)Admitted-Finance | ₹2.3 Cr+₹27.6 L (13.3%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S HIMANSHU CONSTRUCTION COMPANY L3 | Parul construction company L1 | Jagdish Prasad Agarwal L4 | SHYAM CONSTRUCTION CO. L2 |
|---|---|---|---|---|---|---|---|
| 2.00a | |||||||
| 3.00 | Detail D.G.P.S Survey of Land With Showing Physical Position of Nallah, Drain, Electric Line , well, telephone line and other Existing Structure Complete in all respect and as per direction of engg. incharge. | 14 | Hect. | 2,000 ₹28,000 Lowest | 3,000 ₹42,000 | 2,477 ₹34,678 | 5,000 ₹70,000 |
Tender Value
Refer Docs
EMD Value
₹6.0 L
Closing Date
30 Mar 2021, 6:00 pmClosed
UNIT HEAD
RIICO LTD. ALWAR
Development of newly planned area at MIA Alwar
2021_RIICO_215670_1
31/2020-21
Open Tender
Civil Works
Percentage
180 days
ALWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
RIICO LTD. ALWAR
₹6.0 L
Yes
8 Apr 2021
6 Mar 2021
31 Mar 2021
6 Mar 2021
30 Mar 2021
6 Mar 2021
6 Mar 2021 - 30 Mar 2021
Amount
Detail D.G.P.S Survey of Land With Showing Physical Position of Nallah, Drain, Electric Line , well, telephone line and other Existing Structure Complete in all respect and as per direction of engg. incharge.
Bidder Name
Amount
M/S HIMANSHU CONSTRUCTION COMPANY(GSTN-08BGMPS6959K1ZB)
Parul construction company(GSTN-08AACFP3708N1ZZ)
Jagdish Prasad Agarwal(GSTN-08AABFJ4195J1Z3)
SHYAM CONSTRUCTION CO.(GSTN-08BCBPB3359P1ZD)
Bidder Name
Amount
M/S HIMANSHU CONSTRUCTION COMPANY(GSTN-08BGMPS6959K1ZB)
Parul construction company(GSTN-08AACFP3708N1ZZ)
Jagdish Prasad Agarwal(GSTN-08AABFJ4195J1Z3)
SHYAM CONSTRUCTION CO.(GSTN-08BCBPB3359P1ZD)
Bidder Name
Amount
M/S HIMANSHU CONSTRUCTION COMPANY(GSTN-08BGMPS6959K1ZB)
Parul construction company(GSTN-08AACFP3708N1ZZ)
Jagdish Prasad Agarwal(GSTN-08AABFJ4195J1Z3)
SHYAM CONSTRUCTION CO.(GSTN-08BCBPB3359P1ZD)
Bidder Name
Amount
M/S HIMANSHU CONSTRUCTION COMPANY(GSTN-08BGMPS6959K1ZB)
Parul construction company(GSTN-08AACFP3708N1ZZ)
Jagdish Prasad Agarwal(GSTN-08AABFJ4195J1Z3)
SHYAM CONSTRUCTION CO.(GSTN-08BCBPB3359P1ZD)
Bidder Name
Amount
M/S HIMANSHU CONSTRUCTION COMPANY(GSTN-08BGMPS6959K1ZB)
Parul construction company(GSTN-08AACFP3708N1ZZ)
Jagdish Prasad Agarwal(GSTN-08AABFJ4195J1Z3)
SHYAM CONSTRUCTION CO.(GSTN-08BCBPB3359P1ZD)
Bidder Name
Amount
M/S HIMANSHU CONSTRUCTION COMPANY(GSTN-08BGMPS6959K1ZB)
Parul construction company(GSTN-08AACFP3708N1ZZ)
Jagdish Prasad Agarwal(GSTN-08AABFJ4195J1Z3)
SHYAM CONSTRUCTION CO.(GSTN-08BCBPB3359P1ZD)
Jagdish Prasad Agarwal
Parul construction company
SHYAM CONSTRUCTION CO.
M/S HIMANSHU CONSTRUCTION COMPANY
Parul construction company
Jagdish Prasad Agarwal
SHYAM CONSTRUCTION CO.
M/S HIMANSHU CONSTRUCTION COMPANY
Jagdish Prasad Agarwal
SHYAM CONSTRUCTION CO.
M/S HIMANSHU CONSTRUCTION COMPANY
Jagdish Prasad Agarwal
M/S HIMANSHU CONSTRUCTION COMPANY
Jagdish Prasad Agarwal
Parul construction company
SHYAM CONSTRUCTION CO.
M/S HIMANSHU CONSTRUCTION COMPANY
Jagdish Prasad Agarwal
M/S HIMANSHU CONSTRUCTION COMPANY
Jagdish Prasad Agarwal
Parul construction company
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .