Loading…
Loading…
Tender Value
₹74.9 L
EMD Value
₹1.5 L
Closing Date
23 May 2025, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
Yes
05/05/2025 11:00
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
TENDER
13 conditions · 2 needing a document upload
The Financial capability is required as per clause no.9(vi) of Instructions to Tenderer of Chapter-2.
The Technical eligibility criteria is required as per clause no.9(v) of Instructions to Tenderer of Chapter-2. Submission of documents regarding similar nature of work is mandatory.
23 conditions · 12 needing a document upload
The Financial capability is required as per clause no.9(vi) of Instructions to Tenderer of Chapter-2.
Tenderer shall go through the Summary of works in tender schedule, Chapter- 6 for instructions for quoting the schedule (include GST and all taxes.)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Electricity and water will be supplied by RWF free of cost for execution of work at RWF.
Tenderer shall arrange all tools, tackles, men, materials required for the above work.
Tenderer(s) shall affix their Digital signature on the tender documents along with enclosures.
In case of any queries, the Tenderer(s) are advised to contact the following Officer. DYCEE, RAIL WHEEL FACTORY, YELAHANKA, BANGALORE- 560064.Phone No. 080-28072302, email address:[email protected]
The Railway reserves the right to cancel the tender or reject any or all tenders without assigning any reasons thereof.
Meeting Topic: Pre-Bid Meeting for the Replacement of Transformer and associated LT Switchgear Units Meeting number: 25249448622 When: Monday, 5 May, 2025, 11:00 (1 hr 30 mins) India Standard Time GMT+05:30 https://railnet10.webex.com/railnet10/j.php? MTID=ma38b2f08cabe7919207d00d91430a042 Password:123456. Any Details may be contact mobile no.9108501316, 9108501317
Replacement of Transformer and associated LT Switchgear Units in EMMS subs- station of RWF, Yelahanka, Bengaluru - 560 064.
RWFPCEEELTD2025-26-01RT
RWFPCEEELTD2025-26-01RT
Open
Works - General
180 Days
Bengaluru Urban, Karnataka
₹0
₹1.5 L
23 May 2025
29 Apr 2025
61 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 74,92,802 | ||
| — | 1.00 | — | — | ||
| — | Numbers | — | — | ||
| Dismantling and shifting of existing transformer: Disconnection of HT & LT cables, earthing connections and control cables from existing 500kVA, 11kV/433V transformer, removing the existing fencing (if required), lifting and shifting of the transformer to earmarked location within 500Mtrs. The work shall be carried out as per the availability of power shutdown & instruction of engineer in charge. Note: The existing fencing, if removed, shall be fitted back after the commissioning of new transformer. Any materials required for fitting back of fencing shall be arranged by the contractor. Refer Sl. No.1 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works & explanatory note. | — | — | — | 91,450 | |
| — | 1.00 | — | — | ||
| Dismantling and shifting of existing LT Switchgear Panels: Disconnection of LT power cables & control cables connected to switchgear panel, dismantling & shifting of LT switchgear panel of approx. size: 4.4mtr. length x 2.2 mtr. height x 0.5 mtr. depth (including 100kVAR capcitor panel) to earmarked location within 500 mtrs. The work shall be carried out as per the availability of power shutdown and instruction of engineer in charge. Refer Sl. No.2 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works & explanatory note. | — | — | — | 56,050 | |
| — | 1.00 | — | — | ||
| — | Numbers | — | — | ||
| Supply of 500kVA, 11kV/433V new outdoor type distribution Transformer: Design, manufacture & supply of new outdoor type of 500KVA, 11kV/433Volts, 3 phase, 50 Hz, Level-3 energy efficient / BEE Star rated 3 transformer as per IS: 1180 with latest amendment No. 4 MARCH 2021 & IS: 2026 latest. Refer Sl. No.3 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works & explanatory note. | — | — | — | 29,35,250 | |
| — | 1.00 | — | — | ||
| — | Numbers | — | — | ||
| Erection, testing & commissioning of new 500kVA, 11kV/433V outdoor type distribution Transformer: Erection, testing & commissioning of new outdoor type of 500KVA, 11kV/433Volts, 3 phase, 50 Hz, Level-3 energy efficient / BEE Star rated 3 transformer (supplied as per tender schedule Sl. No. 3 above). The new 500KVA, 11kV/433Volts, outdoor type Transformer shall be erected in the existing bed as per relevant safety standards, site conditions etc. Refer Sl. No.3 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works & explanatory note. | — | — | — | 23,600 | |
| — | 1.00 | — | — | ||
| Supply of LT Switchgear Panel: Design, manufacturing & supply of new LT switchgear panel consisting of items under Sl. No. 4, 4(a) to 4(b) of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document as integral part of the LT switchgear panel. Note: The total cost of items under Sl. No. 4, 4(a) to 4(b) of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document shall be quoted in Sl. No.5 of tender schedule. Refer Sl. No. 4, 4(a) to 4(b) of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, quantity, explanatory note & specification. The dimensional details of existing LT switchgear panel (proposed for replacement) & available space within the panel room is enclosed as Annexure-2 for designing new switchgear panel subject to safety clearance around the electrical panels. | — | — | — | 20,33,730 | |
| — | 1.00 | — | — | ||
| Erection of LT Switchgear Panel: Erection, testing & commissioning of new LT switchgear panel (supplied as per Sl. No. 5 of tender schedule above). Refer Sl. No. 4, 4(a) to 4(b) of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, quantity, explanatory note & specification | — | — | — | 44,250 | |
| — | 1.00 | — | — | ||
| — | Numbers | — | — | ||
| Supply of 150KVAR, 415V AC, 50Hz, capacitor panel completely wired with 400A incomer MCCB, 3 pole, 415V with microprocessor based trip release, APFC Relay, 6 Nos. 25 KVAR, 3 phases, 415 Volts, capacitors, 6 Nos. 63A capacitor duty contactors & 06 Nos. 125A SDFUs and associated accessories. Refer Sl.No. 5 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 4,09,460 | |
| — | 1.00 | — | — | ||
| — | Numbers | — | — | ||
| Erection, testing and commissioning of 150KVAR, 415V AC, 50Hz capacitor panel (supplied as per Sl. No. 7 of tender schedule above). Refer Sl. No. 5 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 11,800 | |
| — | 10.00 | — | — | ||
| Supply of fire retardant synthetic insulating mat, 1mtr. Width ± 10mm, 2mm thick ± 10% suitable for voltage up to 3.3 KV as per IS: 15652 latest. Refer Sl. No. 6 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 22,125 | |
| — | 10.00 | — | — | ||
| Installation of fire retardant synthetic insulating mat, 1mtr. Width ± 10mm, 2mm thick ± 10% suitable for voltage up to 3.3 KV as per IS: 15652 latest (supplied as per Sl. No. 9 of tender schedule above). Refer Sl. No. 6 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 3,835 | |
| — | 6.00 | — | — | ||
| — | Numbers | — | — | ||
| Construction of GI Pipe Earth Stations as per IS: 3043 latest & attached explanatory note & drawing at Annexure-1. Refer Sl. No. 7 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 61,242 | |
| — | 50.00 | — | — | ||
| Supply of 50mm x 6mm GI flat for earthing connection: Refer Sl. No. 8 of enclosed schedule of works, explanatory note & specification RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 17,346 | |
| — | 50.00 | — | — | ||
| Laying and connecting 50mm x 6mm GI flat for earthing connection (supplied as per Sl. No. 12 of tender schedule above). Refer Sl. No. 8 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 3,717 | |
| — | 50.00 | — | — | ||
| Supply of 25mm x 3mm GI flat for earthing connection: Refer Sl. No. 9 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 7,906 | |
| — | 50.00 | — | — | ||
| Laying and connecting of 25mm x 3mm GI flat for earthing connection (supplied as per Sl. No. 14 of tender schedule above). Refer Sl. No. 9 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 2,537 | |
| — | 10.00 | — | — | ||
| Supply of M.S Chequered plate: Supply of M.S. chequered plate of 8mm thickness for cable trench covering. The chequered plate shall be given reinforcement with 50mm x 50mm x 6mm MS angle. Refer Sl. No. 10 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 87,556 | |
| — | 10.00 | — | — | ||
| Erection of M.S Chequered plate: Erection of M.S. chequered plate of 8mm thickness for cable trench covering. The chequered plate shall be given reinforcement with 50mm x 50mm x 6mm MS angle (supplied as per Sl. No. 16 of tender schedule above). Refer Sl. No. 10 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 6,761.4 | |
| — | 2.00 | — | — | ||
| — | Numbers | — | — | ||
| Supply of Heat Shrinkable end termination kit for 11kV 3 core 400sq.mm UG cable. Supply of Heat Shrinkable End Termination kit, indoor type suitable for 3 core 400sq.mm 11KV aluminium conductor, XLPE insulated armoured earthed cable. Refer Sl. No. 11 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 16,366.6 | |
| — | 2.00 | — | — | ||
| — | Numbers | — | — | ||
| Erection/making end termination using Heat Shrinkable end termination kit for 11kV 3 core 400sq.mm UG cable. Making of end termination of 11kV 3 core 400sq.mm UG cable using Heat Shrinkable End Termination kit (supplied as per Sl. No. 18 of tender schedule above) & connecting the cable to HT terminals of 500KVA Transformer (supplied as per Sl. No. 3 of tender schedule above)& testing. Refer Sl. No. 11 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 4,720 | |
| — | 4.00 | — | — | ||
| Supply of end termination kit suitable for 3.5 core 300/240sq.mm aluminium armoured LT cable. Supply of end termination kit consisting of 04 Nos. Aluminium lugs & 01 metal gland suitable for 3.5 core 300/240sq.mm LT UG aluminium armoured cable. Refer Sl. No. 12 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 8,142 | |
| — | 4.00 | — | — | ||
| Erection/ making end termination using 3.5 core 300/240sq.mm aluminium armoured LT cable and making end termination. Making of end termination of 3.5 core 300/240sq.mm aluminium armoured LT cable using end termination kit (supplied as per Sl. No. 20 of tender schedule above) & connecting the cable to LT switchgear panel. Refer Sl. No. 12 of enclosed schedule of works, explanatory note & specification No.RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 4,130 | |
| — | 8.00 | — | — | ||
| Supply of end termination kit suitable for 3.5 core 185/150/120 sq.mm aluminium armoured LT cable. Supply of end termination kit consisting of 04 Nos. Aluminium lugs & 01 metal gland suitable for 3.5 core 185/150/120 sq.mm LT UG Aluminium armoured cable. Refer Sl. No. 13 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 12,036 | |
| — | 8.00 | — | — | ||
| Erection / making end termination using 3.5 core 185/150/120 sq.mm aluminium armoured LT cable and making end termination. Making of end termination of 3.5 core 185/150/120 sq.mm aluminium armoured LT cable using end termination kit (supplied as per Sl. No. 22 of tender schedule above) & connecting the cable to LT switchgear panel. Refer Sl. No. 13 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 6,372 | |
| — | 2.00 | — | — | ||
| Supply of end termination kit suitable for 3.5 core 25 sq.mm aluminium armoured LT cable. Supply of end termination kit consisting of 04 Nos. Aluminium lugs & 01 metal gland suitable for 3.5 core 25 sq.mm LT UG Aluminium armoured cable. Refer Sl. No. 14 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 767 | |
| — | 2.00 | — | — | ||
| Erection / making end termination using 3.5 core 25 sq.mm aluminium armoured LT cable and making end termination. Making of end termination of 3.5 core 25 sq.mm aluminium armoured LT cable using end termination kit (supplied as per Sl. No. 24 of tender schedule above) & connecting the cable to LT switchgear panel. Refer Sl. No. 14 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023- 24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 767 | |
| — | 1.00 | — | — | ||
| Supply of 16kV/1000 Joule High Voltage Surge Tester with Surge Wave Receiver, Cable Fault Pre Locator and Cable Route Tracer for locating faults in underground cables as per attached explanatory note & specification. Refer Sl. No. 15 of enclosed schedule of works, explanatory note & specification No. RWF/EL/P/2023-24/EMMS SUBSTATION/01 at chapter-4 of tender document for detailed schedule of works, explanatory note & specification. | — | — | — | 16,20,886 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .