| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAdmitted-Finance | ₹8.3 L | L1 | Admitted-Finance |
| 2 | L2₹8.6 L+₹30,769.93 (3.69%)Admitted-Finance 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | ₹8.6 L+₹30,769.93 (3.69%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Krishna and Co L2 | AJ Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. | 20.67 | Cum | 250 ₹5,167.5 | 246 ₹5,084.82 Lowest |
| 2.00 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 10.8 | Cum | 45 ₹486 | 42 ₹453.6 Lowest |
| 3.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 6.29 | Cum | 5,950 ₹37,425.5 | 5,837 ₹36,714.73 Lowest |
| 4.00 | Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 14.83 | Cum | 10,000 ₹1,48,300 | 9,644 ₹1,43,020.52 Lowest |
| 5.00 | Brick work in following Cement Mortar 1:5 using best quality Country bricks of size 8"3/4 x 41/4" X2 3/4" for foundation and basement including curing etc., complete complying with standard specification. Including scaffolding curing cost of reinforcement etc. all complete as per specifications and drawings as directed by the Engineer in-charge. | 26.12 | Cum | 6,125 ₹1,59,985 | 6,088 ₹1,59,018.56 Lowest |
| 6.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 35.95 | Sqm | 300 ₹10,785 | 293 ₹10,533.35 Lowest |
| 7.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 212.28 | Cum | 300 ₹63,684 | 275 ₹58,377 Lowest |
| 8.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). | 97.59 | Sqm | 200 ₹19,518 | 193 ₹18,834.87 Lowest |
| 9.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 96.31 | Sqm | 255 ₹24,559.05 | 249 ₹23,981.19 Lowest |
| 10.00 | Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) | 20.7 | Sqm | 155 ₹3,208.5 | 146 ₹3,022.2 Lowest |
Tender Value
₹8.4 L
EMD Value
₹8,440
Closing Date
20 Jan 2026, 3:00 pmClosed
Block Development Officer (BP)
Panchayat Union, Jayankondam
Construction of New Kitchen Shed at M.S.Madam PUE School and High School at M.S.Madam Panchayat in Jayankondam Block of Ariyalur District under PT MGR Nutritious Meal Programme 2025-26 3rd Phase
2026_RDTN_642430_1
C1/1994/2025,Dated.07.01.2026
Open Tender
Civil Works - Buildings
Works
90 days
Panchayat Union, Jayankondam
As per Tender Document
4 documents required · 4 mandatory
₹0
₹8,440
22 Jan 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary.
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick, well watered ,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Brick work in following Cement Mortar 1:5 using best quality Country bricks of size 8"3/4 x 41/4" X2 3/4" for foundation and basement including curing etc., complete complying with standard specification. Including scaffolding curing cost of reinforcement etc. all complete as per specifications and drawings as directed by the Engineer in-charge.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Cost and Supply of Door of size 0.90x2.10m
Cost and Supply of Window of size 1.20x1.30m
Labour charges for fixing doors alongwith frames in position etc., complete
Labour charges for fixing windows and ventilators along with frames in position etc., complete
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification. (Payment for centering shall be given after the concrete is laid). Below Basement
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification. (Payment for centering shall be given after the concrete is laid). Above Basement
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Supplying and fixing Cuddapah slab of thickness 20/30 mm including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and fixing in position best quality and approved make Indian made white / colour glazed earthernware wash hand basin of size 550 x 400mm (with pedestal / without pedestal) with a pair of cast iron brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve, 15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste coupling including fixing of wash basin using CI brackets on to the wall in position with TW plugs and screws, rubber washers, white lead and giving necessary water supply connection and painting the brackets with two coat of painting over a priming coat of anti-corrosive paint including testing for leakages etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on works).
Wiring with 2x1.5 sq.mm.PVC insulated SC unsheathed FRLS copper conductor of 1100V grade insuitable PVC rigid pipe concealed in wall and ceiling with PVC accessoires inflush with wall with 3mm thick hylum sheet cover with TW switch box and 5AFT switch and making good of the concealed portion with suitable colour for PVC concealed light / fan Point (for electronic regulator) (5 points per coil)
Supply and fixing of CF Lamp fitting including angle holder
Supply and fixing of WT bulk head fitting with guard (Philips / Bajaj / Crompton / K-Lite) suitable for incandescent lamp with 60W bulb
Supply and run of 2 of 6 sq.mm. (84 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V on 7 / 20 GI bearer wire for service connection mains (From building to service pipe)
Supply and run of 2 of 6 sq.mm. (84 / 0.3) PVC insulated SC unsheathed copper conductor of 1100V on 7 / 20 GI bearer wire for service connection mains (From electric post to service pipe)
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work}
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.97 MB
PriceBid.pdf
Tender Documents • 0.73 MB
BOQ_769660.xls
BOQ • 0.30 MB
TechnicalBid.pdf
Tender Documents • 0.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .