Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.2 LAccepted-AOC | L1 | Accepted-AOC L1 quoted less than tender value | |
| 2 | L2₹49.1 L+₹93,485.44 (1.94%)Rejected-AOC | L2 | Rejected-AOC L2 quoted greater than tender value |
| Sl No | Description | Qty | Unit | M.K.Construction L1 | N.S CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of the Road at Kulithigai BG Salai in Kulithigai Panchayat of Gudiyatham Block. (R79) (KM 0/0 - 0/480) | |||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 345.6 | Sqm | 6.36 ₹2,198.02 Lowest | 6.48 ₹2,239.49 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 400 | Sqm | 23.35 ₹9,340 Lowest | 23.8 ₹9,520 |
| 4.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A | 172.8 | Cum | 140.38 ₹24,257.66 Lowest | 143.1 ₹24,727.68 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 125mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 154.95 | Cum | 2,343.38 ₹3,63,106.73 Lowest | 2,388.86 ₹3,70,153.86 |
| 6.00 | Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,225.5 | Cum | 84.8 ₹1,03,922.4 Lowest | 86.44 ₹1,05,932.22 |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,225.5 | Sqm | 19.62 ₹24,044.31 Lowest | 20 ₹24,510 |
| 8.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 30.64 | Sqm | 11,237.03 ₹3,44,302.6 Lowest | 11,455.13 ₹3,50,985.18 |
| 9.00 | Collection and supply of Carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc. | 184 | Cum | 145.85 ₹26,836.4 Lowest | 148.68 ₹27,357.12 |
| 10.00 | Provision for Hectometer stone | 2 | Nos | 574.36 ₹1,148.72 Lowest | 585.51 ₹1,171.02 |
Tender Value
Refer Docs
EMD Value
₹52,000
Closing Date
8 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Vellore
The Project Director DRDA Vellore
Vellore District Strengthening of 2 roads in Gudiyatham Block under MGSMT phase III 2025-26 scheme, package no 03
2025_RDTN_593999_1
DIPR/4437/TENDER/2025
Open Tender
Civil Works
Item Rate
180 days
The Project Director DRDA Vellore
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹52,000
13 Oct 2025
18 Aug 2025
8 Sept 2025
18 Aug 2025
8 Sept 2025
18 Aug 2025
Amount
Strengthening of the Road at Kulithigai BG Salai in Kulithigai Panchayat of Gudiyatham Block. (R79) (KM 0/0 - 0/480)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 125mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of Carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Provision for Hectometer stone
Provision for 60 CM Equilateral Cautionary Sign Board Charges
Strengthening of the Road at Sempalli Road to Regasamudram Road in Agaravaram Panchayat of Gudiyatham Block. (R27) (KM 0/0 - 0/600)
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 125mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of Prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying spreading and compacting graded stone aggregate to BITUMINOUS MACADAM 50 MM THICK including cost of materials, labour charges rental for machinery, fuel and all other incidental charges etc complete
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of Carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Provision for Hectometer stone
Provision for 60 CM Equilateral Cautionary Sign Board Charges
Providing Metal Crash Barrier
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
N.S CONSTRUCTION (BID ID -1447215)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .