| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.4 LAccepted-AOC | ₹18.4 L Quoted ₹15.6 L | 1 | Accepted-AOC Accepted-Finance |
| 2 | 2₹15.9 L+₹22,703.40 (1.45%)Rejected-Finance | ₹15.9 L+₹22,703.40 (1.45%) | 2 | Rejected-Finance Higher rate compare to L1, So Rejected |
| 3 | 3₹15.9 L+₹25,051.73 (1.60%)Rejected-Finance | ₹15.9 L+₹25,051.73 (1.60%) | 3 | Rejected-Finance Higher rate compare to L1, So Rejected |
| 4 | 4₹17.6 L+₹1.9 L (12.3%)Rejected-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹17.6 L+₹1.9 L (12.3%) | 4 | Rejected-Finance Higher rate compare to L1, So Rejected |
| 5 | 5₹17.9 L+₹2.2 L (14.2%)Rejected-Finance | ₹17.9 L+₹2.2 L (14.2%) | 5 | Rejected-Finance Higher rate compare to L1, So Rejected |
| Sl No | Description | Qty | Unit | NATTALAMMAN CONSTRUCTIONS L6 | M PERUMAL L4 | M ARAVINDH L3 | GOPI INFRASTRUCTURES L2 | PRAKASH P L1 | M THANGADURAI L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Culvert with Retaining wall to the MS Puram Road CH at 610M in Mallapuram Panchayat | |||||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 44.88 | Cum | 294 ₹13,194.72 | 150 ₹6,732 | 150.56 ₹6,757.13 | 203.9 ₹9,151.03 | 148.18 ₹6,650.32 Lowest | 229.49 ₹10,299.51 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 3.74 | Cum | 5,794 ₹21,669.56 | 4,500 ₹16,830 | 4,399.1 ₹16,452.63 | 4,514.39 ₹16,883.82 | 4,329.73 ₹16,193.19 Lowest | 5,080.88 ₹19,002.49 |
| 4.00 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Below Sill) | 33.66 | Cum | 5,810 ₹1,95,564.6 | 6,500 ₹2,18,790 | 4,631.75 ₹1,55,904.71 | 4,753.96 ₹1,60,018.29 | 4,558.71 ₹1,53,446.18 Lowest | 5,350.51 ₹1,80,098.17 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and | 28.05 | csm | 5,810 ₹1,62,970.5 | 6,000 ₹1,68,300 | 4,997.84 ₹1,40,189.41 | 5,125.81 ₹1,43,778.97 | 4,919.04 ₹1,37,979.07 Lowest | 5,769.02 ₹1,61,821.01 |
| 6.00 | Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Below Sill) | 36 | Sqm | 588 ₹21,168 | 550 ₹19,800 | 416.65 ₹14,999.4 | 423.22 ₹15,235.92 | 410.08 ₹14,762.88 Lowest | 476.33 ₹17,147.88 |
| 7.00 | Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Above Sill) | 60 | Sqm | 294 ₹17,640 Lowest | 1,095 ₹65,700 | 833.3 ₹49,998 | 846.44 ₹50,786.4 | 820.16 ₹49,209.6 | 952.65 ₹57,159 |
| 8.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc Ch @ 610 | 143.1 | Cu.m | 588 ₹84,142.8 | 200 ₹28,620 | 150.56 ₹21,545.14 | 203.9 ₹29,178.09 | 148.18 ₹21,204.56 Lowest | 229.49 ₹32,840.02 |
| 9.00 | Supply of sand and filling in to the foundation including cost and conveyance to the siteand all labour charges for filling as per standard speecifications Ch @ 610 | 9.98 | Cu.m | 2,051 ₹20,468.98 | 1,800 ₹17,964 | 1,592.35 ₹15,891.65 | 1,617.46 ₹16,142.25 | 1,567.25 ₹15,641.16 Lowest | 1,820.43 ₹18,167.89 |
| 10.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course Ch @ 610 | 19.97 | Cu.m | 5,794 ₹1,15,706.18 | 5,000 ₹99,850 | 4,399.1 ₹87,850.03 | 4,514.39 ₹90,152.37 | 4,329.73 ₹86,464.71 Lowest | 5,080.88 ₹1,01,465.17 |
Tender Value
₹24.5 L
EMD Value
₹24,500
Closing Date
20 Aug 2026, 3:00 pmClosed
BDO BP
BDO Office, Sedapatti
Construction of Culvert with Retaining wall to the MS Puram Road CH at 610M in Mallapuram Panchayat
2026_RDTN_691106_1
01(02)/SED/GFBP/2026-2027
Open Tender
Civil Works
Works
Sedapatti
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,500
10 Sept 2026
5 Aug 2026
20 Aug 2026
5 Aug 2026
20 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Culvert with Retaining wall to the
MS Puram Road CH at 610M in Mallapuram
Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 44.88 | Cum | 5 | ₹224.4 |
| 3 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 3.74 | Cum | 5 | ₹18.7 |
| 4 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. (Below Sill) | 33.66 | Cum | 5 | ₹168.3 |
| 5 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and | 28.05 | csm | 5 | ₹140.25 |
| 6 | Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Below Sill) | 36 | Sqm | 5 | ₹180 |
| 7 | Centering for the sides and soffits CC items including all cost and conveyance and all labour charges etc., complete. (Above Sill) | 60 | Sqm | 5 | ₹300 |
| 8 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc Ch @ 610 | 143.1 | Cu.m | 5 | ₹715.5 |
| 9 | Supply of sand and filling in to the foundation including cost and conveyance to the siteand all labour charges for filling as per standard speecifications Ch @ 610 | 9.98 | Cu.m | 5 | ₹49.9 |
| 10 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course Ch @ 610 | 19.97 | Cu.m | 5 | ₹99.85 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_830967.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .