Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.6 LAdmitted-Finance | -41.60% | ₹25.6 L | L1 | Admitted-Finance |
| 2 | L2₹26.3 LAdmitted-Finance GSTIN: 38ADEPO6706GIZF, 38DIWPD5154D1Z0CHILAM TANGTSE | CHILAM TANGTSE | LEH | LADAKH | -40.20% | ₹26.3 L | L2 | Admitted-Finance |
| 3 | L3₹26.4 LAdmitted-Finance GSTIN: 38BFHPT6869P1Z3, 38CBJPT8367H1ZSIGOO | -40.00% | ₹26.4 L | L3 | Admitted-Finance |
| 4 | L4₹26.8 LAdmitted-Finance | -38.97% | ₹26.8 L | L4 | Admitted-Finance |
| 5 | L5₹28.5 LAdmitted-Finance GSTIN: 38GKAPM2396R1Z7 | -35.00% | ₹28.5 L | L5 | Admitted-Finance |
Tender Value
₹43.9 L
EMD Value
₹1.0 L
Closing Date
26 May 2026, 4:00 pmClosed
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Construction of Multipurpose hall at Phuktse (By way of Landscapping work)
2026_PWD_18887_1
CDL 29 of Leh of 2026-27
Open Tender
Civil Works - Others
60 days
leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Executive Engineer Construction Division Leh
₹1.0 L
1 Jun 2026
5 May 2026
27 May 2026
6 May 2026
26 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earthworkinexcavationbymechanicalmeans (Hydraulicexcavator)overareas
(exceeding30cmindepth,1.5minwidthaswellas10sqmonplan) including
gettingoutanddisposalofexcavatedearthleadupto50mandliftupto1.5m,as
directed by Engineer-in-charge. A) All kinds of soil | 1,581.52 | Cum | 208.42 | ₹3,29,620.4 | item 01 |
B) Ordinary rock | 790.76 | Cum | 383.89 | ₹3,03,564.86 | item 02 | |
C) Hard rock (Blasting Prohibited) | 263.59 | Cum | 1,095.44 | ₹2,88,747.03 | item 03 | |
Random rubble masonry with hard stone in foundation andplinth including
levelling up with cement concrete 1:6:12(1 cement :6 coarses and:12 graded
stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) | 195.12 | Cum | 5,730.39 | ₹11,18,113.7 | item 04 | |
Random rubble masonry with hard stone laid dry in foundation, plinth &
walls Laid with bond stone | 130.08 | Cum | 4,062.25 | ₹5,28,417.48 | item 05 | |
Earth work in excavation by mechanical means (Hydraulic excavator) in
foundationtrenchesordrains(notexceeding1.5minwidthor10sqmonplan),
includingdressingof sidesandrammingofbottoms, liftupto1.5m, including
gettingouttheexcavatedsoilanddisposalofsurplusexcavatedsoilasdirected,
within a lead of 50 m. All kinds of soil. | 199.56 | Cum | 278.09 | ₹55,495.64 | item 06 | |
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded
stone aggregate 40 mm nominal size derived from natural sources) | 70.37 | Cum | 5,725.33 | ₹4,02,891.47 | item 07 | |
Dumping of stone in Horizontal on level including cost of stones. | 70.37 | Cum | 953.03 | ₹67,064.72 | item 08 | |
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4
(1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal
size). | 55.62 | Sqm | 486.19 | ₹27,041.89 | item 09 | |
Making knitted wire crates of approved mesh-size; including weaving, binding
sides and partitions, and binding top after filling; excluding cost of filling, stones
and weaving materials | 1,597.5 | Sqm | 100.68 | ₹1,60,836.3 | item 10 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_45077.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid