Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 CrAdmitted-Finance | -29.80% | ₹3.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.5 Cr+₹5.6 L (1.64%)Admitted-Finance | -28.65% | ₹3.5 Cr+₹5.6 L (1.64%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 Cr+₹14.3 L (4.15%)Admitted-Finance | -26.89% | ₹3.6 Cr+₹14.3 L (4.15%) | L3 | Admitted-Finance |
| 4 | L4₹3.6 Cr+₹19.3 L (5.61%)Admitted-Finance | -25.86% | ₹3.6 Cr+₹19.3 L (5.61%) | L4 | Admitted-Finance |
| 5 | L5₹3.7 Cr+₹27.1 L (7.89%)Admitted-Finance WARD NO 19 BRAHMNAGAR GAFI NO 2 ROBERTSGANJ DIST SONBHADRA | ROBERTSGANJ | SONBHADRA | UTTAR PRADESH | -24.26% | ₹3.7 Cr+₹27.1 L (7.89%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹8.7 L
Closing Date
10 May 2022, 5:00 pmClosed
SUPERINTENDING ENGINEER
CONSTRUCTION CIRCLE, RAMGHAT ROAD ALIGARH
Construction of OHT, Tube Well, Supply, Laying and Jointing of Rising main and distribution system, making of house connection and appurtenant work at Sarai Harnarayan in Aligarh City
2022_UPJNM_695755_2
666/NIVIDA/05
Open Tender
Civil Works
Turn-key
457 days
ALIGARH
PLEASE REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹11,800
EXECUTIVE ENGINNEER CONSTRUCTION DIVISION UPJN
₹8.7 L
25 May 2022
2 May 2022
11 May 2022
2 May 2022
10 May 2022
2 May 2022
eProcurement System Government of Uttar Pradesh Created By: PANKAJ RANJAN Created Date/Time: 25-May-2022 02:53 PM Tender Title: Construction of SARAI HAR NARAYAN WSS Tender ID: 2022_UPJNM_695755_2
Tender Inviting Authority: Executive Engineer,Construction Division , U.P. Jal Nigam (URBAN), Aligarh.
Name of Work:Construction Sarai Harnarayan Water Supply Scheme in Aligarh City .
Contract No: NIT No. 666 / NIVIDA/ 05 Date:- 18-04-2022
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 YOGENDRA SINGH(GSTN-09ANIPS8053Q1ZY) 48974656.73 -28.65 34943417.58 Three Crore Fourty Nine Lakh Fourty Three Thousand Four Hundred and Seventeen
2.00 M/S TAHIR CONSTRUCTION(GSTN-09AJAPA0928L2ZD) 48974656.73 -26.89 35805371.54 Three Crore Fifty Eight Lakh Five Thousand Three Hundred and Seventy One
3.00 S M Construction(GSTN-09AGBPM2257Q1ZW) 48974656.73 -24.26 37093405.01 Three Crore Seventy Lakh Ninty Three Thousand Four Hundred and Five
4.00 M/S VIDDUT KUMARJAIN(GSTN-09AASPJ6167H1Z4) 48974656.73 -10.56 43802932.98 Four Crore Thirty Eight Lakh Two Thousand Nine Hundred and Thirty Two
5.00 M/S DEVENDRA PRAKASH(GSTN-NA) 48974656.73 -25.86 36309810.50 Three Crore Sixty Three Lakh Nine Thousand Eight Hundred and Ten
6.00 AMIT SHARMA(GSTN-NA) 48974656.73 -29.80 34380209.02 Three Crore Fourty Three Lakh Eighty Thousand Two Hundred and Nine
7.00 Brij Mohan Contractor(GSTN-NA) 48974656.73 -5.27 46393692.32 Four Crore Sixty Three Lakh Ninty Three Thousand Six Hundred and Ninty Two
8.00 Rafikur Samad Contrictor(GSTN-NA) 48974656.73 -19.19 39576420.10 Three Crore Ninty Five Lakh Seventy Six Thousand Four Hundred and Twenty
Lowest Amount Quoted BY: AMIT SHARMA(34380209.02)
BOQ Summary Details Tender Title: Construction of SARAI HAR NARAYAN WSS Tender ID: 2022_UPJNM_695755_2
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 AMIT SHARMA 34380209.02 L1
2 YOGENDRA SINGH 34943417.58 L2
3 M/S TAHIR CONSTRUCTION 35805371.54 L3
4 M/S DEVENDRA PRAKASH 36309810.50 L4
5 S M Construction 37093405.01 L5
6 Rafikur Samad Contrictor 39576420.10 L6
7 M/S VIDDUT KUMARJAIN 43802932.98 L7
8 Brij Mohan Contractor 46393692.32 L8
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .