| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.7 LAccepted-AOC | L-1 | Accepted-AOC Accept | |
| 2 | L-2₹7.6 L+₹6,461 (0.86%)Rejected-Finance | L-2 | Rejected-Finance Reject | |
| 3 | L-3₹8.4 L+₹85,535 (11.4%)Rejected-Finance | L-3 | Rejected-Finance Reject |
Tender Value
₹8.6 L
EMD Value
₹17,192
Closing Date
3 Jan 2022, 2:00 pmClosed
Er Rajeev Kumar Dixit SE OMC IV DTPS Kasimpur
Office of the SE OMC-IV DTPS Kasimpur Aligarh
Various breakdown maintenance of HT LT motors 6.6KV 0.4KV bus MCC cleaning cable laying and daily routine lighting work of area pertain to EMD II CTPS
2021_RVUNL_641907_1
ET-43/OMC-IV/EMD-II/C/21-22
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
Office of the SE OMC-IV DTPS Kasimpur Aligarh
As per Tender Documents
4 documents required · 4 mandatory
₹1,062
SAO CFA AND BO HTPS KASIMPUR ALIGARH
₹17,192
3 Mar 2022
12 Nov 2021
4 Jan 2022
12 Nov 2021
3 Jan 2022
12 Nov 2021
12 Nov 2021 - 3 Jan 2022
Amount
JOB1:-Shifting of Motors/ Rotors/Stators and replacement of bearings of various motors. (A) Motor of capacity upto 25-60KW
Opening & tightening of foundation bolt.
Removal & insertion of coupling
Opening & reassembling of motor driving end cover
Opening & reassembling of motor non driving end cover
Replacement of DE side bearing
Replacement of NDE side bearing
Shifting of Stator
Shifting of Rotor
Repairing of stator holes and finishing the foundation
Shifting of complete motor
Dismantling of motor
Assembling of motor
JOB1:-Shifting of Motors/ Rotors/Stators and replacement of bearings of various motors. (B)Motor of capacity upto 61-110KW.
Opening & tightening of foundation bolt.
Removal & insertion of coupling
Opening & reassembling of motor driving end cover
Opening & reassembling of motor non driving end cover
5.Replacement of DE side bearing
Replacement of NDE side bearing
Shifting of Stator
Shifting of Rotor
Repairing of stator holes and finishing the foundation
Shifting of complete motor
Dismantling of motor
Assembling of motor
JOB1:-Shifting of Motors/ Rotors/Stators and replacement of bearings of various motors. (C)Motor of capacity upto 111-200KW
Opening & tightening of foundation bolt.
Removal & insertion of coupling
Opening & reassembling of motor driving end cover
Opening & reassembling of motor non driving end cover
Replacement of DE side bearing
Replacement of NDE side bearing
Shifting of Stator
Shifting of Rotor
Repairing of stator holes and finishing the foundation
Shifting of complete motor
Dismantling of motor
Assembling of motor
JOB1:-Shifting of Motors/ Rotors/Stators and replacement of bearings of various motors. (D)Motor of capacity above 200 KW
Rotation of complete motor on its foundation
Opening & tightening of foundation bolt.
Removal & insertion of coupling
Opening & reassembling of motor driving end cover
Opening & reassembling of motor non driving end cover
Replacement of DE side bearing
Replacement of NDE side bearing
Shifting of Stator
Shifting of Rotor
Repairing of stator holes and finishing the foundation
Shifting of complete motor
Dismantling of motor
Assembling of motor
JOB2:- .Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 1.Removal of following sizes of old and damage PVC /PILC/XLPE Armoured power cables from trenches/cable galleries and re-rolling of cables and shifting of the same to site Store:
( ii) 3x120/3x150/3x185/3x240 mm2
( iii) 3x95/3x70/3x50/3x35 mm2
(iv) 1x300 mm2
JOB2:- Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 2.Removal of following sizes of old/damage Armoured control cable PVC insulation from trenches/cable galleries and rerolling of cables and shifting of the same to site Store:
( i) Up to 9x2.5 mm2
( ii) Above 9x2.5 mm2 & upto 24x2.5 mm2
JOB2:- Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 3.Rerouting of existing cables/shifting the following sizes of New cables from Central/ site Store to work-site and laying, dressing of PVC/PILC/XLPE Armoured power cables:
( ii) 3x120/3x150/3x185/3x240 mm2
( iii) 3x95/3x70/3x50/3x35 mm2
(iv) 1x300 mm2
JOB2:- Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 4.Rerouting of existing cables/shifting the following sizes of New PVC Armoured control cables from Central/ site Store to work-site and laying, dressing same:
( i) Up to 9x2.5 mm2
( ii) Above 9x2.5 mm2 & upto 24x2.5 mm2
JOB2:- Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 5.Making End Termination of following size cable:
( i) 1 Core-630/400mm2
(ii) 3 Core x120/3x150/3x185/3x240 mm2
(iii) 3x35/3x50/3x70/3x95 mm2
(iv) 1x30mm2
JOB2:- Laying, Dressing, Tagging, making end Termination, making straight through joint & removal of old cable, of Unit No.-7 “C” T.P.S., H.T.P.S., Kasimpur. 6. Making straight through joint detecting the fault & preparation for joint of following size cable:
(ii) 3x120/3x150/3x185/3x240 mm2
(iii) 3x35/3x50/3x70/3x95 mm2
(iv) 1x300mm2
JOB-3: Miscellaneous work of HT/LT motors & cleaning of MCC and 6.6KV Switchgear
CLEANING OF STATOR (HT)
BRAZING OF MOTOR LEAD
VARNISHING & HEATING OF STATOR TO RESTRENGTH IT FOR THE PURPOSE OF INCREASING ITS IR VALUE ( HT)
REPAIRING OF OVERHANGING PORTION OF STATOR WINDING
CLEANING OF ROTOR (HT)
REPAIRING OF WEDGES OF EACH SLOT OF STATOR CORE (HT)
DYMAMIC BLANCING OF ROTOR
PROVISION OF DUST INGRESS FOR PROTECTION OF H.T. MOTOR
CLEANING OF 0.4 KV MCC
CLEANING OF 6.6 KV BUS
GREASING OF 6.6 KV MOTOR
CLEANING OF COOLER & WINDING OF H.T. MOTORS
STRENGHTNING OF CABLE RACK & DRESSING OF CABLE
DISMANTLING OF DAMADGE/UNUSED BUS SUPPORT INSULATOR
ASSEMBLING OF HEALTY BUS SUPPORT INSULATOR
DISMANTLING OF DAMAGE/UNUSED DROPPER OF 6.6 KV BUS
ASSEMBLING OF HEALTHY BUS DROPPER OF 6.6KV BUS
DISMANTLING OF DAMAGE/UNSUED OF 6.6 KV BUS
ASSEMBLING OF HEALTHY 6.6KV BUS
JOB-4: To attend the Electrical Lighting & welding complaint of B’ & ‘C’ T.P.S. (Except 2x250 MW Construction & Coal Handing Plant, “C” TPS), H.T.P.S., Kasimpur.
VISION ENGINEERING COMPANY
SHARMA ELECTRIC WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .