| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance | ₹7.7 L | L1 | Admitted-Finance |
| 2 | L2₹7.8 LAdmitted-Finance | ₹7.8 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KALESWARI L1 | SRI MOORTHI CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.001.) Construction of Community Sanitary Complex Toilet Near Community Hall at M.V.North H/o Manivilundan | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. (Depth 0.00 - 0.30m) | 8.9 | cum | 320 ₹2,848 Lowest | 330 ₹2,937 |
| 3.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. (Depth 0.30 - 0.60m) | 8.31 | cum | 390 ₹3,240.9 Lowest | 400 ₹3,324 |
| 4.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. (Depth 0.60m Above) | 10.75 | cum | 410 ₹4,407.5 Lowest | 415 ₹4,461.25 |
| 5.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 5.62 | cum | 5,600 ₹31,472 Lowest | 5,630 ₹31,640.6 |
| 6.00 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. | 11.57 | cum | 5,900 ₹68,263 Lowest | 6,000 ₹69,420 |
| 7.00 | Brickwork in CM 1:5 mix using country bicks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. | 25.95 | cum | 6,257.4 ₹1,62,379.53 Lowest | 6,280 ₹1,62,966 |
| 8.00 | Supply & Fabrication of steel including all cost and conveyance of all materials to site and all labour charges for etc., complete. | 0.51 | MT | 91,858.5 ₹46,847.84 Lowest | 91,900 ₹46,869 |
| 9.00 | Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete (Below) | 20.01 | Sqm | 547.5 ₹10,955.48 Lowest | 547.5 ₹10,955.48 Lowest |
| 10.00 | Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete (Above) | 19.52 | Sqm | 1,095 ₹21,374.4 Lowest | 1,095 ₹21,374.4 Lowest |
Tender Value
₹7.8 L
EMD Value
₹7,900
Closing Date
5 Aug 2026, 3:00 pmClosed
Block Development officer
Union office , Thalaivasal
Construction of Community Sanitary Complex Toilet Near Community Hall at M.V.North H/o Manivilundan
2026_RDTN_686499_1
Roc.738/2026/T-5
Open Tender
Civil Works
Item Wise
Items
Construction of Community Sanitary Complex Toilet Near Community Hall at M.V.North H/o Manivilundan
3 documents required · 3 mandatory
₹0
₹7,900
11 Aug 2026
17 Jul 2026
5 Aug 2026
17 Jul 2026
5 Aug 2026
17 Jul 2026
17 Jul 2026 - 5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.) Construction of Community Sanitary Complex Toilet Near Community Hall at M.V.North H/o Manivilundan | - | - | - | - |
| 2 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. (Depth 0.00 - 0.30m) | 8.9 | cum | - | - |
| 3 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. (Depth 0.30 - 0.60m) | 8.31 | cum | - | - |
| 4 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. (Depth 0.60m Above) | 10.75 | cum | - | - |
| 5 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed for foundation | 5.62 | cum | - | - |
| 6 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. | 11.57 | cum | - | - |
| 7 | Brickwork in CM 1:5 mix using country bicks including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete. | 25.95 | cum | - | - |
| 8 | Supply & Fabrication of steel including all cost and conveyance of all materials to site and all labour charges for etc., complete. | - | MT | - | - |
| 9 | Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete (Below) | 20.01 | Sqm | - | - |
| 10 | Supplying & Erecting centering for sides & soffiots including necessary supports for all Rcc works etc.complete (Above) | 19.52 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_825219.xls
BOQ • 0.28 MB
01.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].