| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 CrAdmitted-Finance | -15.76% | ₹8.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.6 CrAdmitted-Finance | -12.48% | ₹8.6 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical ARA MACHINE CHOPAN SONEBHADRA U P 231205 | SONBHADRA | UTTAR PRADESH | 231205 | - | - | - | Rejected-Technical Disqualified in PQ |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Disqualified in PQ |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Disqualified in PQ |
Tender Value
₹9.9 Cr
EMD Value
₹8.9 L
Closing Date
8 May 2026, 6:00 pmClosed
Chief Engineer
CE PWD REWA ZONE REWA
Construction of Bargawan-waidhan Main road (MDR) Naugarh to medical College 2-lane CC road length of 2.60 KM, Block waidhan district Singrauli MP
2026_PWDRB_500830_1
16/Gen./2026-27 Dt. 16-04-2026
Open Tender
Civil Works - Roads
180 days
Singrauli
Please refer Tender document
4 documents required · 4 mandatory
₹20,000
₹8.9 L
5 Jun 2026
22 Apr 2026
11 May 2026
22 Apr 2026
8 May 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | 2.2 Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees having girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness.
A In area of light jungle | - | Hect | - | - | 2.2 (A) |
| 2 | Dismantling of Cement Concrete Pavement
Dismantling of cement concrete pavement by mechanical meansusing pneumatic tools, breaking to pieces not exceeding 0.02 cum involume and stock piling Serviceable material at designated locationsand disposal of unserviceable materials up to a lead of 1000 meters, | - | Hect | - | - | 2.5 |
| 3 | 3.3 Excavation in Soil using Hydraulic Excavator and Tippers with disposal up to 1000 meters.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting suitable earth to the embankment location and disposing off unsuitable earth with all lifts and lead up to 1000m as per relevant clauses of section-300 of specification. | - | Cum | - | - | 3.3 |
| 4 | 3.13 Embankment/ Sub Grade Construction with Material Obtained from Borrow Pits
Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevant clauses of section-300. | - | Cum | - | - | 3.13 |
| 5 | 3.14 Construction of Embankment with Material Deposited from Roadway Cutting
Construction of embankment with approved materials having CBR>7 deposited at site from roadway cutting and excavation from drain or foundation of structures graded and compacted to meet requirement of table 300-1, 300-2 and as per relevant clauses of section-300. | - | Cum | - | - | 3.14 |
| 6 | 4.2 Crusher Run Macadam Sub Base/Base Course
Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller as per clause 410 to form a layer of sub-base/Base in accordance to Table No. 400-14, 400-15 and as per clause of section 407 of specifications.
(ii) For 37.5 mm maximum size | - | Cum | - | - | 4.2 (ii) |
| 7 | 4.16 Construction of Shoulders with approved material/selected soil i/c excavation all lifts & leads i/c grading to required slope & camber of 4% and compacting on OMC using vibratory roller of 80 to 100 kN static weight. Field compaction shall be done in corresponding layers of carriage way thickness and meet the requirements of MDD to achieve compaction (98% -100%) as per relevant clause of 408.
A Hard Shoulders (CBR value >12) | - | Cum | - | - | 4.16 (A) |
| 8 | 6.1 Dry Lean Cement Concrete Sub- base
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be lessthan 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect. | - | Cum | - | - | 6.1 |
| 9 | 6.3 Cement Concrete Pavement
Construction of un-reinforced, dowel jointed, plain cement concrete pavement with M-40 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with electronic sensor slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc. including groove cutting for width of 4 mm- 6mm and 1/3rd depth of PQC within 8-10 hrs of placing/ finishing of PQC including cleaning of groove and providing approved sealant filling etc. as per clause 602.2.10 and 600.10 and IRC-57-2006 as per drawing and as per specification. | - | Cum | - | - | 6.3 |
| 10 | 6.8 Providing and fixing Steel in dowel bar and tie rod including craddle, laps etc. complete required as per design
(i) Mild steel | - | MT | - | - | 6.8 (i) |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 23.10 MB
Tendernotice_2.pdf
PDF • 0.67 MB
BOQ_604676.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid